Table of Contents

 

 

UNITED STATES SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

 

FORM 10-K

 

x ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2008

OR

¨ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from                     to                     .

Commission File Number: 1-8944

LOGO

CLIFFS NATURAL RESOURCES INC.

(Exact Name of Registrant as Specified in Its Charter)

 

Ohio   34-1464672

(State or Other Jurisdiction of

Incorporation or Organization)

 

(I.R.S. Employer

Identification No.)

200 Public Square, Cleveland, Ohio   44114-2315
(Address of Principal Executive Offices)   (Zip Code)

Registrant’s Telephone Number, Including Area Code: (216) 694-5700

 

Title of Each Class

  

Name of Each Exchange on Which Registered

Common Shares, par value $0.125 per share

   New York Stock Exchange and Chicago Stock Exchange

Securities registered pursuant to Section 12(b) of the Act:

NONE

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.      YES  x            NO  ¨

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.      YES  ¨             NO  x

Indicate by check mark whether the registrant: (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.    YES  x            NO  ¨

Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will not be contained, to the best of registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K.      ¨

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.

Large accelerated filer  x    Accelerated filer  ¨    Non-accelerated filer  ¨     Smaller reporting company  ¨

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).    YES  ¨            NO  x

As of June 30, 2008, the aggregate market value of the voting and non-voting stock held by non-affiliates of the registrant, based on the closing price of $119.19 per share as reported on the New York Stock Exchange —Composite Index was $12,030,180,194 (excluded from this figure is the voting stock beneficially owned by the registrant’s officers and directors).

The number of shares outstanding of the registrant’s Common Shares, par value $0.125 per share, was 113,527,411 as of February 23, 2009.

DOCUMENTS INCORPORATED BY REFERENCE

Portions of the registrant’s proxy statement for its annual meeting of shareholders scheduled to be held on May 12, 2009 are incorporated by reference into Part III.

 

 

 


Table of Contents

TABLE OF CONTENTS

 

          Page No.

Definitions

   2

Part I

  

Item 1.

  

Business

   5

Item 1A.

  

Risk Factors

   24

Item 1B.

  

Unresolved Staff Comments

   32

Item 2.

  

Properties

   32

Item 3.

  

Legal Proceedings

   40

Item 4.

  

Submission of Matters to a Vote of Security Holders

   45

Part II

  

Item 5.

  

Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities

   46

Item 6.

  

Selected Financial Data

   48

Item 7.

  

Management’s Discussion and Analysis of Financial Condition and Results of Operations

   50

Item 7A.

  

Quantitative and Qualitative Disclosures About Market Risk

   79

Item 8.

  

Financial Statements and Supplementary Data

   80

Item 9.

  

Changes in and Disagreements With Accountants on Accounting and Financial Disclosure

   153

Item 9A.

  

Controls and Procedures

   153

Item 9B.

  

Other Information

   154

Part III

  

Item 10.

  

Directors, Executive Officers and Corporate Governance

   155

Item 11.

  

Executive Compensation

   155

Item 12.

  

Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters

   155

Item 13.

  

Certain Relationships and Related Transactions, and Director Independence

   156

Item 14.

  

Principal Accountant Fees and Services

   156

Part IV

  

Item 15.

  

Exhibits and Financial Statement Schedules

   157

Signatures

   158


Table of Contents

Definitions

The following abbreviations or acronyms are used in the text. References in this report to the “Company,” “we,” “us,” “our” and “Cliffs” are to Cliffs Natural Resources Inc. (formerly known as Cleveland-Cliffs Inc) and subsidiaries, collectively. References to “A$” or “AUD” refer to Australian currency, “C$” to Canadian currency and “$” to United States currency.

 

Abbreviation or acronym

  

Term

AAA

   American Arbitration Association

AEPA

   Australian Environmental Protection Authority

Algoma

   Essar Steel Algoma Inc.

Amapá

   Anglo Ferrous Amapá Mineração Ltda. and Anglo Ferrous Logística Amapá Ltda.

Anglo

   Anglo American plc

AOC

   Administrative Order by Consent

APB

   Accounting Principles Board

APBO

   Accumulated Postretirement Benefit Obligation

ARB

   Accounting Research Bulletin

ArcelorMittal USA

   ArcelorMittal USA Inc.

ARS

   Auction rate securities

ASC

   American Steamship Company

ASX

   Australian Stock Exchange

AusQuest

   AusQuest Limited

BART

   Best Available Retrofit Technology

BHP

   BHP Billiton

CAC

   Cliffs Australia Coal Pty Ltd.

CAIR

   Clean Air Interstate Rule

CAL

   Cliffs and Associates Limited

CAWO

   Cliffs Australian Washplant Operations Pty Ltd

Centennial Amapá

   Centennial Asset Participações Amapá S.A.

CERCLA

   Comprehensive Environmental Response, Compensation and Liability Act

Cockatoo Island

   Cockatoo Island Joint Venture

DEP

   Department of Environment Protection

Directors’ Plan

   1996 Nonemployee Directors’ Compensation Plan, as amended and restated 1/1/2005

DNR

   Department of Natural Resources

Dofasco

   ArcelorMittal Dofasco Inc.

DSA

   Draft stipulation agreement

EAF

   Electric arc furnace

East Greenfield

   East Greenfield Investors, LLC

EAW

   Environmental Assessment Worksheet

EITF

   Emerging Issues Task Force

Empire

   Empire Iron Mining Partnership

EPA

   United States Environmental Protection Agency

EPS

   Earnings per share

Exchange Act

   Securities Exchange Act of 1934

FASB

   Financial Accounting Standards Board

Ferrominera

   C.V.G. Ferrominera Orinoco C.A. of Venezuela

F.O.B.

   Free on board

FSP

   FASB Staff Position

GAM

   Group Annuity Mortality

GAAP

   Accounting principles generally accepted in the United States

GHG

   Greenhouse gas

Golden West

   Golden West Resources Ltd.

GRI

   Global Reporting Initiative

 

2


Table of Contents

 

Abbreviation or acronym

  

Term

HAP

   Hazardous air pollutants

Harbinger

   Harbinger Capital Partners

HBI

   Hot Briquette Iron

Hibbing

   Hibbing Taconite Company

ICE Plan

   Incentive Equity Plan

IRS

   Internal Revenue Service

ISO

   International Standards Organization

Ispat

   Ispat Inland Steel Company

JORC

   Joint Ore Reserves Code

Kobe Steel

   Kobe Steel, LTD.

kWh

   Kilowatt hours

LIBOR

   London Interbank Offered Rate

LIFO

   Last-in, first-out

LTVSMC

   LTV Steel Mining Company

MACT

   Maximum Achievable Control Technology

MD&A

   Management’s Discussion and Analysis of Financial Condition and Results of Operations

MDEQ

   Michigan Department of Environmental Quality

MMBTU

   Million British Thermal Units

MMX

   MMX Mineração e Metálicos S.A.

MP

   Minnesota Power, Inc.

MPCA

   Minnesota Pollution Control Agency

MPSC

   Michigan Public Service Commission

MSHA

   Mine Safety and Health Administration

NBCWA

   National Bituminous Coal Wage Agreement

NDEP

   Nevada Department of Environmental Protection

NLRB

   National Labor Relations Board

NPDES

   National Pollutant Discharge Elimination System

Northshore

   Northshore Mining Company

NOV

   Notice of Violation

NRD

   Natural Resource Damages

Oak Grove

   Oak Grove Resources, LLC

OPEB

   Other postretirement benefits

PBO

   Projected benefit obligation

PCAOB

   Public Company Accounting Oversight Board

PCB

   Polychlorinated Biphenyl

Pinnacle

   Pinnacle Mining Company, LLC

PinnOak

   PinnOak Resources, LLC

PolyMet

   PolyMet Mining Inc.

Portman

   Portman Limited (now known as Cliffs Asia Pacific Iron Ore Holdings Pty Ltd)

PPI

   Producers Price Indices

PRP

   Potentially responsible party

Qcoal

   Qcoal Pty Ltd

Renewafuel

   Renewafuel, LLC

RONA

   Return on net assets

RTWG

   Rio Tinto Working Group

 

3


Table of Contents

 

Abbreviation or acronym

  

Term

SAB

   Staff Accounting Bulletin

SAR

   Stock Appreciation Rights

SEC

   United States Securities and Exchange Commission

Severstal

   Severstal North America, Inc.

Severstal Warren

   Severstal Warren, Inc., formerly known as WCI Steel Inc.

SFAS

   Statement of Financial Accounting Standards

Silver Bay Power

   Silver Bay Power Company

SMM

   Sonoma Mine Management

Sonoma

   Sonoma Coal Project

Sonoma Sales

   Sonoma Sales Pty Ltd

Stelco

   Stelco Inc.

Tilden

   Tilden Mining Company L.C.

TMDL

   Total Maximum Daily Load

Tonne

   Metric ton (equal to 1,000 kilograms or 2,205 pounds)

TSR

   Total Shareholder Return

UMWA

   United Mineworkers of America

United Taconite

   United Taconite LLC

U.S.

   United States of America

U.S. Steel

   United States Steel Corporation

USW

   United Steelworkers

Vale

   Companhia Vale do Rio Doce

VEBA

   Voluntary Employee Benefit Association trusts

VIE

   Variable interest entity

VNQDC Plan

   Voluntary Non-Qualified Deferred Compensation Plan

Wabush

   Wabush Mines Joint Venture

WAEPA

   Western Australian Environmental Protection Agency

Weirton

   ArcelorMittal Weirton Inc.

WEPCO

   Wisconsin Electric Power Company

Wheeling

   Wheeling-Pittsburgh Steel Corporation

WVEPA

   West Virginia Environmental Protection Agency

 

4


Table of Contents

PART I

Item 1.    Business.

Introduction

Cliffs Natural Resources Inc. traces its corporate history back to 1847. Today, we are an international mining and natural resources company. We are the largest producer of iron ore pellets in North America, a major supplier of direct-shipping lump and fines iron ore out of Australia, and a significant producer of metallurgical coal. With core values of environmental and capital stewardship, our colleagues across the globe endeavor to provide all stakeholders operating and financial transparency as embodied in the GRI framework. Our company is organized according to product category and geographic location: North American Iron Ore, North American Coal, Asia Pacific Iron Ore, Asia Pacific Coal and Latin American Iron Ore.

In North America, we operate six iron ore mines in Michigan, Minnesota and Eastern Canada, and two coking coal mining complexes located in West Virginia and Alabama. Our Asia Pacific operations include full ownership of Portman, which is comprised of two iron ore mining complexes in Western Australia, serving the Asian iron ore markets with direct-shipping fines and lump ore, and a 45 percent economic interest in Sonoma, a coking and thermal coal mine located in Queensland, Australia. In Latin America, we have a 30 percent interest in Amapá, a Brazilian iron ore project, as well as a number of smaller greenfield projects not yet in production.

Over recent years, we have been executing a strategy designed to achieve scale in the mining industry and focused on serving the world’s largest and fastest growing steel markets.

Recent Developments

In recent years, we have undergone a strategic transformation to an international mining and natural resources company from our historic business model as a mine manager for the integrated steel industry in North America. Our growth within the U.S., combined with our investments in Australia and Latin America, as well as acquisitions in minerals outside of iron ore, such as metallurgical coal, illustrate the execution of this strategy. While ever-conscious of the challenges associated with the current economic environment, we continue to identify low-risk opportunities to grow and at the same time position ourselves to deal with the uncertainties that lie ahead. In 2008, we continued our strategic growth and transformation to an international mining and natural resources company through the following transactions:

Portman.    On May 21, 2008, Portman announced a tender offer to repurchase up to 16.5 million shares, or 9.39 percent of its common stock. At that time, we owned approximately 80.4 percent of 176 million shares outstanding in Portman and indicated we would not participate in the tender buyback. As a result of the buyback, our ownership interest in Portman increased from 80.4 percent to 85.2 percent. On September 10, 2008, we announced an off-market takeover offer to acquire all of the shares in Portman that we did not already own. The off-market tender offer for Portman closed on November 3, 2008, at which time we had received tenders of Portman shares sufficient to give us a 99.3 percent ownership interest in Portman’s outstanding shares. We subsequently proceeded with a compulsory acquisition of the remaining shares and as of December 31, 2008 had full ownership of Portman.

AusQuest.    On September 11, 2008, we announced a strategic alliance and subscription and option agreement with AusQuest, a publicly-traded minerals exploration company in Australia whose shares are traded on the ASX. Under the agreement, we acquired a 30 percent fully diluted interest in AusQuest through a staged issuance of shares and options. With the approval of AusQuest’s shareholders and clearance from the Australian Foreign Investment Review Board, we made an initial $18.0 million (A$26 million) investment at $0.28 per share (A$0.40 per share) and appointed a representative to the AusQuest board of directors. This strategic alliance provides us with both the right to participate in AusQuest’s future raising of capital, as well as certain rights in relation to any future sale or other disposal of AusQuest’s explorative assets.

United Taconite.    Effective July 1, 2008, we acquired the remaining 30 percent interest in United Taconite from Laiwu Steel Group, Ltd. Upon consummation of the purchase, our ownership interest increased from 70 percent to 100 percent. Total consideration paid for the acquisition was approximately $450.7 million, which was comprised of $104.4 million in cash, 4.3 million of our common shares and 1.2 million tons of iron ore pellets.

 

5


Table of Contents

Michigan Expansion Projects.    In the third quarter of 2008 we announced a capital expansion project at our Empire and Tilden mines in Michigan’s Upper Peninsula. The project will require approximately $290.4 million of incremental capital investment and is expected to allow the Empire mine to produce at three million tons annually through 2017 and increase Tilden mine production by more than two million tons annually. However, based upon the economic downturn and its impact on the steel industry, the expansion project has been delayed until the demand for iron ore pellets improves.

Golden West.    During 2008, Portman acquired 24.3 million shares of Golden West, a Western Australia iron ore exploration company. Golden West owns the Wiluna West exploration ore project in Western Australia, containing a resource of 126 million metric tons of ore. The investment provides Portman a strategic interest in Golden West and Wiluna West. Our ownership in Golden West represents approximately 17 percent of its outstanding shares at December 31, 2008. Acquisition of the shares represented an original investment of approximately $22 million. However, our investment has been adversely affected by the global economic recession, which began to impact the metals and mining industry primarily in the fourth quarter of 2008. As a result of the global economic crisis and the corresponding uncertainties in the market, we recorded an impairment charge of $17.1 million on our investment in Golden West in December 2008.

In addition, effective October 15, 2008, we amended our articles of incorporation to change the name of the corporation to Cliffs Natural Resources Inc. As we enter a new era of expansion and diversification designed to achieve scale in the mining and natural resources industry, we believe the name “Cliffs Natural Resources” will promote better understanding of our strategy and vision among current and prospective customers, partners and investors, particularly in new markets and overseas.

Business Segments

Our company is organized and managed according to product category and geographic location: North American Iron Ore, North American Coal, Asia Pacific Iron Ore, Asia Pacific Coal and Latin American Iron Ore. The Asia Pacific Coal and Latin American Iron Ore businesses, which are in the early stages of production, do not meet the criteria for reportable segments, and therefore, we have a total of three reportable segments.

All North American business segments are headquartered in Cleveland, Ohio. Offices in Duluth, Minnesota, have shared services groups supporting the North American business segments. Our Technology Group is located in Ishpeming, Michigan. Our Asia Pacific headquarters are located in Perth, Australia, and our Latin American headquarters are located in Rio de Janeiro, Brazil. Cliffs International Mineração Brasil, Ltda and Cliffs Natural Resources Pty Ltd, formerly known as Cliffs Asia-Pacific Pty Limited, provide technical and administrative support for our assets in Latin America and Australia, respectively, as well as new business development services in these regions.

We evaluate segment performance based on sales margin, defined as revenues less cost of goods sold identifiable to each segment. This measure of operating performance is an effective measurement as we focus on reducing production costs throughout the Company. Financial information about our segments is included in Item 7 and NOTE 6 — SEGMENT REPORTING included in Item 8 of this Annual Report on Form 10-K.

North American Iron Ore

We are the largest producer of iron ore pellets in North America and primarily sell our production to integrated steel companies in the United States and Canada. We manage and operate six North American iron ore mines located in Michigan, Minnesota and Eastern Canada that currently have a rated capacity of 38.1 million tons of iron ore pellet production annually, representing approximately 46 percent of total North American pellet production capacity. Based on our percentage ownership of the North American mines we currently operate, our share of the rated pellet production capacity is currently 25.5 million tons annually, representing approximately 31 percent of total North American annual pellet capacity.

 

6


Table of Contents

The following chart summarizes the estimated annual production capacity and percentage of total North American pellet production capacity for each of the North American iron ore pellet producers as of December 31, 2008:

North American Iron Ore Pellet

Annual Rated Capacity Tonnage

 

     Current Estimated Capacity
(Gross Tons of Raw Ore

in Millions)
   Percent of Total
North American Capacity
 

All Cliffs’ managed mines

   38.1    46.0 %

Other U.S. mines

     

U.S. Steel’s Minnesota ore operations

     

Minnesota Taconite

   14.6    17.7  

Keewatin Taconite

   5.4    6.5  
           

Total U.S. Steel

   20.0    24.2  

ArcelorMittal USA Minorca mine

   2.9    3.5  
           

Total other U.S. mines

   22.9    27.7  

Other Canadian mines

     

Iron Ore Company of Canada

   12.8    15.5  

Quebec Cartier Mining Co.

   8.9    10.8  
           

Total other Canadian mines

   21.7    26.3  
           

Total North American mines

   82.7    100.0 %
           

We sell our share of North American iron ore production to integrated steel producers, generally pursuant to term supply agreements with various price adjustment provisions.

For the year ended December 31, 2008, we produced a total of 35.2 million tons of iron ore pellets, including 22.9 million tons for our account and 12.3 million tons on behalf of steel company owners of the mines.

We produce 13 grades of iron ore pellets, including standard, fluxed and high manganese, for use in our customers’ blast furnaces as part of the steelmaking process. The variation in grades results from the specific chemical and metallurgical properties of the ores at each mine and whether or not fluxstone is added in the process. Although the grade or grades of pellets currently delivered to each customer are based on that customer’s preferences, which depend in part on the characteristics of the customer’s blast furnace operation, in many cases our iron ore pellets can be used interchangeably. Industry demand for the various grades of iron ore pellets depends on each customer’s preferences and changes from time to time. In the event that a given mine is operating at full capacity, the terms of most of our pellet supply agreements allow some flexibility to provide our customers iron ore pellets from different mines.

Standard pellets require less processing, are generally the least costly pellets to produce and are called “standard” because no ground fluxstone, such as limestone or dolomite, is added to the iron ore concentrate before turning the concentrates into pellets. In the case of fluxed pellets, fluxstone is added to the concentrate, which produces pellets that can perform at higher productivity levels in the customer’s specific blast furnace and will minimize the amount of fluxstone the customer may be required to add to the blast furnace. “High manganese” pellets are the pellets produced at our Canadian Wabush operation where there is more natural manganese in the crude ore than is found at our other operations. The manganese contained in the iron ore mined at Wabush cannot be entirely removed during the concentrating process. Wabush produces pellets with two levels of manganese, both in standard and fluxed grades.

It is not possible to produce pellets with identical physical and chemical properties from each of our mining and processing operations. The grade or grades of pellets purchased by and delivered to each customer are based on that customer’s preferences and availability.

 

7


Table of Contents

Each of our North American Iron Ore mines is located near the Great Lakes or, in the case of Wabush, near the St. Lawrence Seaway, which is connected to the Great Lakes. The majority of our iron ore pellets are transported via railroads to loading ports for shipment via vessel to steelmakers in the U.S. or Canada.

North American Iron Ore Customers

Our North American Iron Ore revenues are primarily derived from sales of iron ore pellets to the North American integrated steel industry, consisting of eight major customers. Generally, we have multi-year supply agreements with our customers. Sales volume under these agreements is largely dependent on customer requirements, and in many cases, we are the sole supplier of iron ore pellets to the customer. Each agreement has a base price that is adjusted annually using one or more adjustment factors. Factors that can adjust price include international pellet prices, measures of general industrial inflation and steel prices. One of our supply agreements has a provision that limits the amount of price increase or decrease in any given year.

During 2008, 2007 and 2006, we sold 22.7 million, 22.3 million and 20.4 million tons of iron ore pellets, respectively, from our share of the production from our North American Iron Ore mines. The segment’s five largest customers together accounted for a total of 84, 83 and 91 percent of North American Iron Ore product revenues for the years 2008, 2007 and 2006, respectively. Refer to Concentration of Customers within Item 1 — Business, for additional information regarding our major customers.

We received cash payment for approximately 24 million tons of iron ore sales in 2008. However, due to the timing of shipping schedules with certain customers, under accounting guidance for “bill and hold” sales, revenue recognition for approximately 1.2 million tons of iron ore will be deferred until the product is delivered.

North American Iron Ore Term Supply Agreements

Our term supply agreements in North America expire between the end of 2011 and the end of 2022. The weighted average remaining duration is six years.

Our North American Iron Ore sales are influenced by seasonal factors in the first quarter of the year as shipments and sales are restricted by weather conditions on the Great Lakes. During the first quarter, we continue to produce our products, but we cannot ship those products via lake freighter until the Great Lakes are passable, which causes our first quarter inventory levels to rise. Our limited practice of shipping product to ports on the lower Great Lakes or to customers’ facilities prior to the transfer of title has somewhat mitigated the seasonal effect on first quarter inventories and sales. At December 31, 2008 and 2007, we had approximately 0.4 million and 0.8 million tons of pellets, respectively, in inventory at lower lakes or customers’ facilities.

ArcelorMittal

On March 19, 2007, we executed an umbrella agreement with ArcelorMittal USA, a subsidiary of ArcelorMittal, that covers significant price and volume matters under three separate pre-existing iron ore pellet supply agreements for ArcelorMittal USA’s Cleveland and Indiana Harbor West, Indiana Harbor East and Weirton facilities. This umbrella agreement formalizes a previously disclosed letter agreement dated April 12, 2006.

Under terms of the umbrella agreement, some of the terms of the separate pellet sale and purchase agreements for each of the above facilities were modified to aggregate ArcelorMittal USA’s purchases during the years 2006 through 2010. The pricing provisions of the umbrella agreement are determined in accordance with the individual supply agreements that were in place for each of the facilities at the time it was executed.

From 2006 through 2010, ArcelorMittal USA is obligated to purchase specified minimum tonnages of iron ore pellets on an aggregate basis. The umbrella agreement also sets the minimum annual tonnage at ArcelorMittal USA’s approximately budgeted usage levels through 2010, with pricing based on the facility to which the pellets are delivered. The terms of the umbrella agreement allow ArcelorMittal USA to manage its ore inventory levels through buydown provisions, which permit it to reduce its tonnage purchase obligation each year at a specified price per ton, and through deferral provisions, which permit ArcelorMittal USA to defer a portion of its annual tonnage purchase obligation. ArcelorMittal USA has opted to defer the purchase of 550,000 tons

 

8


Table of Contents

from 2009 to 2010. The umbrella agreement also provides for consistent nomination procedures through 2010 across all three iron ore pellet supply agreements. In addition, pursuant to an arbitration ruling on December 23, 2008, ArcelorMittal is permitted to nominate tonnage for export out of the U.S. to any facility owned by ArcelorMittal in 2009 and 2010. This ability to nominate tonnage for export will cease when the Umbrella Agreement expires at the end of 2010. For additional information regarding the litigation, refer to Part 1 — Item 3, Legal Proceedings.

If, at the end of the umbrella agreement term in 2010, a new agreement is not executed, our pellet supply agreements with ArcelorMittal USA prior to executing the umbrella agreement will again become the basis for supplying pellets to ArcelorMittal USA:

 

Facility

   Agreement
Expiration

Cleveland Works and Indiana Harbor West facilities

   2016

Indiana Harbor East facility

   2015

Weirton facility

   2018

ArcelorMittal USA is a 62.3 percent equity participant in Hibbing and a 21 percent equity partner in Empire with limited rights and obligations and a 28.6 percent participant in Wabush through Dofasco, a subsidiary of ArcelorMittal USA. In 2008, 2007 and 2006, our North American Iron Ore pellet sales to ArcelorMittal USA were 9.9, 10.3, and 9.1 million tons, respectively.

Algoma

Algoma is a Canadian steelmaker and a subsidiary of Essar Steel Holdings Limited. We have a 15-year term supply agreement under which we are Algoma’s sole supplier of iron ore pellets through 2016. Our annual obligation is capped at four million tons with our option to supply additional pellets. Pricing under the agreement with Algoma is based on a formula which includes international pellet prices. The agreement also provides that, in 2008, 2011 and 2014, either party may request a price negotiation if prices under the agreement with Algoma differ from a specified benchmark price. On January 3, 2008, Algoma requested price renegotiation for 2008 pursuant to a price re-opener in the agreement. On May 30, 2008, we entered into a binding term sheet with Algoma amending the term supply agreement. The term sheet established the price for 2008 and provided for the sale of additional tonnage to Algoma in 2008 and 2009. Approximately 0.6 million tons of the 2008 tonnage will be delivered and paid for in the first quarter of 2009. Pricing and tonnage outside of the term sheet for 2009 and beyond will be determined in accordance with the original terms of the agreement with Algoma. We sold 4.1 million, 2.9 million and 3.5 million tons to Algoma in 2008, 2007 and 2006, respectively.

Severstal

In January 2006, we entered into an Amended and Restated Pellet Sale and Purchase Agreement dated and effective January 1, 2006, whereby we are the sole supplier of iron ore pellets through 2012 to Severstal’s Dearborn facility. The agreement with Severstal contains certain minimum purchase requirements for certain years. We sold 4.6 million, 3.0 million and 3.7 million tons to Severstal in 2008, 2007 and 2006, respectively.

On April 30, 2008, we entered into a binding term sheet with Severstal regarding an amendment and extension of the agreement with Severstal. The term sheet governs the performance of the parties under the agreement until such time as the parties execute a definitive written agreement. Pursuant to the term sheet, the term of the agreement was extended with Severstal an additional 10 years, subject to automatic renewals unless terminated by prior written notice. The agreement provides that we must supply all of Severstal’s blast furnace pellet requirements for its Dearborn, Michigan facility during the term of the agreement, subject to specified minimum and maximum requirements in certain years.

On July 7, 2008, Severstal acquired WCI Steel Inc., located in Warren, Ohio. In 2004, we had entered into an agreement with the former WCI to supply, beginning in 2006 and thereafter, 100 percent of WCI’s annual requirements up to a maximum of two million tons of iron ore pellets. The 2004 agreement is for a ten-year term, which commenced on January 1, 2005. Severstal Warren assumed the 2004 agreement. We sold 1.4 million, 1.5 million and 1.6 million tons to Severstal Warren in 2008, 2007 and 2006, respectively.

 

9


Table of Contents

On August 5, 2008, Severstal acquired Esmark Incorporated, a manufacturer of and distributor of flat rolled and other steel products. At the time of the acquisition, we were a supplier to Esmark’s subsidiary, Wheeling-Pittsburgh Steel Corporation. Under the terms of a 2006 agreement, we supply certain iron ore pellets through and including 2011, equal to 25 percent of Wheeling’s total annual iron ore pellet tonnage requirements required for consumption in Wheeling’s iron and steel making facilities in any year at any of Wheeling’s facilities in Steubenville/Mingo Junction, Ohio. Severstal assumed the 2006 agreement. The term of the agreement with Wheeling is subject to automatic annual renewals unless terminated by no less than 24 months’ prior written notification.

U.S. Steel Canada Inc.

U.S. Steel Canada is a 44.6 percent participant in Wabush. In addition, the domestic subsidiaries of U.S. Steel Canada own 14.7 percent of Hibbing and 15 percent of Tilden.

In December 2006, we executed a binding pellet supply term sheet with U.S. Steel Canada with respect to a seven-year supply agreement to provide their Lake Erie Steel and Hamilton Steel facilities excess pellet requirements above the amount supplied from their ownership interest at Hibbing, Tilden and Wabush. Pellet sales to U.S. Steel Canada totaled 1.4 million, 1.2 million and 0.9 million tons in 2008, 2007 and 2006, respectively.

North American Coal

We are a supplier of metallurgical coal in North America. We own and operate two North American coking coal mining complexes located in West Virginia and Alabama that currently have a rated capacity of 6.5 million short tons of production annually. For the year ended December 31, 2008, we sold a total of 3.2 million tons, compared with 1.2 million tons for the five months ended December 31, 2007. Each of our North American coal mines are positioned near rail or barge lines providing access to international shipping ports, which allows for export of our coal production.

North American Coal Customers

North American Coal’s production is sold to global integrated steel and coke producers in Europe, South America and North America. Approximately 84 percent of our 2008 production was committed under one-year contracts. This compares with approximately 45 percent of our 2009 production as of December 31, 2008, which has been committed under new one-year contracts and carryover tonnage. However, domestic negotiations are still ongoing, and international negotiations have recently begun. Customer contracts in North America typically are negotiated on a calendar year basis with international contracts negotiated as of March 31.

Exports and domestic sales represented 56 percent and 44 percent, respectively, of our North American Coal sales in 2008. This is compared with 66 percent and 34 percent, respectively, in 2007. Total sales to two customers of our North American Coal segment comprised more than 10 percent of our consolidated product revenue in 2008 when combined with sales to the customers by each of our other business segments. Refer to Concentration of Customers within Item 1 – Business, for additional information.

Asia Pacific Iron Ore

Our Asia Pacific Iron Ore segment is comprised of Portman, an Australian iron ore mining company, of which we own 100 percent as of December 31, 2008.

Our Asia Pacific Iron Ore operations are located in Western Australia and include our 100 percent owned Koolyanobbing complex and our 50 percent equity interest in Cockatoo Island. We serve the Asian iron ore markets with direct-shipping fines and lump ore. Production in 2008 (excluding our 0.4 million tonne share of Cockatoo Island) was 7.3 million tonnes, compared with 7.7 million tonnes in 2007.

These two operations supply a total of four direct-shipping export products to Asia via the global seaborne trade market. Koolyanobbing produces a standard lump and fines product as well as a low grade fines product.

 

10


Table of Contents

Cockatoo Island produces and exports a single premium fines product. Portman lump products are directly charged to the blast furnace, while the fines products are used as sinter feed. The variation in Portman’s four export product grades reflects the inherent chemical and physical characteristics of the ore bodies mined as well as the supply requirements of the customers.

Koolyanobbing is a collective term for the operating deposits at Koolyanobbing, Mount Jackson and Windarling. There are approximately 100 kilometers separating the three mining areas. Banded iron formations host the mineralization which is predominately hematite and goethite. Each deposit is characterized with different chemical and physical attributes, and in order to achieve customer product quality, ore in varying quantities from each deposit must be blended together.

Blending is undertaken at Koolyanobbing, where the crushing and screening plant is located. Standard and low grade products are produced in separate production runs. Once the blended ore has been crushed and screened into a direct shipping product, it is transported by rail approximately 600 kilometers south to the Port of Esperance for shipment to Asian customers.

Cockatoo Island is located off the Kimberley coast of Western Australia, approximately 1,900 kilometers north of Perth and is only accessible by sea and air. Cockatoo Island produces a single high iron product known as Cockatoo Island Premium Fines. The deposit is almost pure hematite and contains very few contaminants enabling the shipping grade to be above 68 percent iron. Ore is mined below the sea level on the southern edge of the island. This is facilitated by a sea wall which enables mining to a depth of 40 meters below sea level. Ore is crushed and screened to the final product sizing. Vessels berth at the island and the fines product is loaded directly to the ship. Cockatoo Island Premium Fines are highly sought in the global marketplace due to its extremely high iron grade and low valueless mineral content. In 2008, Cockatoo Island production began to reduce, as the second stage of the seawall reserves were exhausted. Construction on a necessary extension of the existing seawall commenced in the third quarter 2008, with production anticipated to restart by the end of the second quarter 2009. This extension is expected to extend production for approximately two additional years, through June 2011.

During the second quarter of 2008, Portman announced an agreement with Polaris Metals NL and Southern Cross Goldfields Limited, whereby Portman obtains non-magnetite iron ore rights to a number of tenements in the Yilgarn region, in exchange for unencumbered access by Polaris to the Bungalbin tenements. Consequently, Portman no longer has an interest in the Helena and Aurora Range and Bungalbin Hill areas. This arrangement will permit tenement rationalization in immediate mining areas and allow Portman to gain additional prospective exploration areas.

Asia Pacific Iron Ore Customers

Portman’s production is under contract with steel companies in China and Japan through 2012. A limited spot market exists for seaborne iron ore as most production is sold under supply contracts with annual benchmark prices driven from negotiations between the major suppliers and Chinese, Japanese and other Asian steel mills.

Portman has five-year term supply agreements with steel producers in China and Japan that account for approximately 74 percent and 26 percent, respectively, of sales. The contracts were recently renegotiated for the period 2008 through 2012. Sales volume under the agreements is partially dependent on customer requirements. Each agreement is priced based on benchmark pricing established for Australian producers.

During 2008, 2007 and 2006, we sold 7.8 million, 8.1 million and 7.4 million tonnes of iron ore, respectively, from our Western Australia mines. Sales in 2008 were to 16 Chinese and three Japanese customers. No customer comprised more than 10 percent of our consolidated sales in 2008, 2007 or 2006. Portman’s five largest customers accounted for approximately 44 percent of Portman’s sales in 2008, 47 percent in 2007 and 46 percent in 2006.

Investments

In addition to our reportable business segments, we are partner to a number of projects, including Amapá in Brazil and Sonoma in Australia.

 

11


Table of Contents

Amapá

We are a 30 percent minority interest owner in Amapá, which consists of an iron ore deposit, a 192-kilometer railway connecting the mine location to an existing port facility and 71 hectares of real estate on the banks of the Amazon River, reserved for a loading terminal. Amapá initiated production in late December 2007. The remaining 70 percent of Amapá was previously owned by MMX, a Brazilian company which managed the construction and operations of Amapá while we supplied supplemental technical support. On August 5, 2008, Anglo acquired a controlling interest in MMX’s 51 percent interest in the Minas-Rio iron ore project and its 70 percent interest in Amapá.

Throughout the year, the ramp-up of operations was significantly slower than previously anticipated, with annual production totaling 1.2 million tonnes. Anglo has indicated that it plans to complete construction of the concentrator and continue to ramp-up operations despite the current economic global recession. It is estimated that Amapá will produce and sell at least 3 million tonnes of iron ore fines products in 2009 and 6.5 million tonnes annually once fully operational, which is expected to occur between 2011 and 2012. The majority of Amapá’s production is committed under a long-term supply agreement with an operator of an iron oxide pelletizing plant in the Kingdom of Bahrain.

Sonoma

We own a 45 percent economic interest in Sonoma, located in Queensland, Australia. The project commenced operations in January 2008, with production and sales totaling approximately 2.4 million and 2.1 million tonnes, respectively, in 2008. The project is expected to produce 3.5 million tonnes in 2009 and between three to four million tonnes of coal annually in 2010 and beyond. Production will include an approximate 40/60 mix of hard coking coal and thermal coal. Sonoma has economically recoverable reserves of 43 million tonnes. All 2008 production was committed under supply agreements with customers in Asia. Of the 3.5 million tonnes expected to be produced in 2009, approximately 2.8 million tonnes are committed under supply agreements as of December 31, 2008.

Concentration of Customers

We have three customers which individually account for more than 10 percent of our consolidated product revenue. Total revenue from these customers represents approximately $1.6 billion, $1.1 billion, and $1.0 billion of our total consolidated product revenue in 2008, 2007 and 2006, respectively, and is attributable to our North American Iron Ore and North American Coal business segments. The following represents sales revenue from each of these customers as a percentage of our total consolidated product revenue as well as the portion of product sales for North American Iron Ore and North American Coal that is attributable to each of these customers in 2008, 2007 and 2006, respectively:

 

     Percentage of
Total
Product Revenue (1)
    Percentage of
North American Iron
Ore Product Revenue (1)
    Percentage of
North American Coal
Product Revenue (1)
 

Customer (2)

   2008     2007     2006     2008     2007     2006     2008     2007     2006  

ArcelorMittal

   27 %   34 %   35 %   39 %   44 %   44 %   23 %   37 %   —   %

Severstal

   12     8     11     18     10     13     5     —       —    

Algoma

   11     12     16     17     16     20     —       —       —    
                                                      

Total

   50 %   54 %   62 %   74 %   70 %   77 %   28 %   37 %   —   %
                                                      

 

(1) Excluding freight and venture partners’ cost reimbursements.
(2) Includes subsidiaries of each customer.

The Iron Ore, Metallurgical Coal and Steel Industries

Global crude steel growth, a significant driver of our business was down approximately two percent from 2007. China produced approximately 500 million tonnes of crude steel in 2008, representing approximately 38 percent of global production. Production in China in 2008 has increased two percent and 18 percent over 2007 and 2006, respectively.

 

12


Table of Contents

The rapid growth in steel production in China over recent years has only been partially met by a corresponding increase in domestic Chinese iron ore production. Chinese iron ore deposits, although substantial, are of a lower grade (less than half of the equivalent iron ore content) than the current iron ore supplied from Brazil and Australia.

The world price of iron ore is influenced by international demand. The rapid growth in Chinese demand, particularly in more recent years, has created a market imbalance and has led to demand outstripping supply. This market imbalance has led to high spot prices for seaborne iron ore with increases of 9.5 percent and 19 percent in 2007 and 2006, respectively, in benchmark prices for Brazilian and Australian suppliers of iron ore. During the second quarter of 2008, the Australian benchmark prices for lump and fines settled at increases of 97 percent and 80 percent, respectively.

The increased demand for iron ore and higher pricing over the past five years has resulted in major iron ore suppliers expanding efforts to increase their capacity. However, in 2008, significant changes began to take place in the North American and global economy. During the third quarter of 2008, these changes also began to impact the global steel industry. As a supplier to that industry, we have started to see the adverse effects of the economy and how it may impact our business with respect to declines in customer demand and future pricing projections.

Competition

Throughout the world, we compete with major and junior mining companies, as well as metals companies, both of which produce steelmaking raw materials, including iron ore and metallurgical coal.

North America

In our North American Iron Ore business segment, we sell our product primarily to steel producers with operations in North America. We compete directly with the Iron Ore Company of Canada, ArcelorMittal Mines Canada and U.S. Steel, as well as other steel companies that own interests in iron ore mines that may have excess iron ore inventories.

In the coal industry, our North American Coal business segment competes with many metallurgical coal producers of various sizes, including Alpha Natural Resources, Inc., Patriot Coal Corporation, CONSOL Energy Inc., Arch Coal, Inc., Massey Energy Company, Jim Walter Resources, Inc., Peabody Energy Corp., United Coal Group Company and other producers located in North America and globally.

The North American coal industry remains highly fragmented and competitive, with CONSOL, Massey, Peabody, Alpha and Alliance Resource Partners representing the five largest producers. A number of factors beyond our control affect the markets in which we sell our coal. Continued demand for our coal and the prices obtained by us depend primarily on the coal consumption patterns of the steel industry in the United States and elsewhere around the world as well as the availability, location, cost of transportation and price of competing coal. Coal consumption patterns are affected primarily by demand, environmental and other governmental regulations, and technological developments. The most important factors on which we compete are delivered price, coal quality characteristics such as heat value, sulfur, ash and moisture content, and reliability of supply. Metallurgical coal, which is primarily used to make coke, a key component in the steelmaking process, generally sells at a premium over steam coal due to its higher quality and value in the steelmaking process.

Asia Pacific

In our Asia Pacific Iron Ore business segment we export iron ore products to China and Japan in the world seaborne trade. In the Asia Pacific marketplace, Cliffs competes with major iron ore exporters from Australia, Brazil and India. These include Anglo American, Vale, Rio Tinto, BHP Billiton, Fortescue Metals Group Ltd., Mount Gibson Iron Limited, Murchison Metals Limited, among others.

The Sonoma Coal Project, in which Cliffs owns a 45 percent economic interest, competes with many other global metallurgical and thermal coal producers, including Anglo American, Rio Tinto, BHP Billiton, Macarthur Coal, Teck Cominco and Xstrata.

 

13


Table of Contents

Competition in steelmaking raw materials is predicated upon the usual competitive factors of price, availability of supply, product performance, service and transportation cost to the consumer of the raw materials.

As the global steel industry continues to consolidate, a major focus of the consolidation is on the continued life of the integrated steel industry’s raw steelmaking operations, including blast furnaces and basic oxygen furnaces that produce raw steel. In addition, other competitive forces have become a large factor in the iron ore business. In particular, electric furnaces built by mini-mills, which are steel recyclers, generally produce steel by using scrap steel and reduced-iron products rather than iron ore pellets.

Environment

General

Various governmental bodies are continually promulgating new laws and regulations affecting our company, our customers, and our suppliers in many areas, including waste discharge and disposal, hazardous classification of materials and products, air and water discharges, and many other environmental, health, and safety matters. Although we believe that our environmental policies and practices are sound and do not expect that the application of any current laws or regulations would reasonably be expected to result in a material adverse effect on our business or financial condition, we cannot predict the collective adverse impact of the expanding body of laws and regulations.

Specifically, there are four notable proposed or potential rulemakings or activities that could potentially have a material adverse impact on our facilities in the future depending on their ultimate outcome: Climate Change and Greenhouse Gas Regulation, Regional Haze, the Clean Air Interstate Rule, and the Minnesota Mercury Total Maximum Daily Load Implementation.

Climate Change and Greenhouse Gas Emissions. Climate change risk and how the world chooses to manage it poses one of the most important and complex issues facing the world today. Although the factors that affect climate change are complex, it has become increasingly clear that the growing utilization of fossil fuels has created legitimate climate change concerns. With that understanding comes the realization that with the complexities and uncertainties associated with the U.S. and global navigation of the climate change issue as a whole, one of our significant risks for the future is forthcoming in the shape of mandatory carbon legislation.

The evolving global prominence of carbon regulation is increasingly impacting the operational and financial performance of energy-intensive entities. At present, a number of carbon regulatory schemes are operational, capping emissions of GHG emissions and imposing compliance costs on major emitters. Further, policy-makers are in the design process of additional carbon regulation at the state, regional, national, and international levels. The current regulatory patchwork of carbon compliance schemes present a challenge for multi-facility entities to identify their near term risks. Amplifying the uncertainty, the dynamic forward outlook for carbon regulation presents a challenge to large industrial companies to assess the long-term net impacts of carbon compliance costs on their operations.

Internationally, mechanisms to reduce emissions are being implemented in various countries, with differing designs and stringency, according to resources, economic structure, and politics. We expect that momentum to extend carbon regulation following the expiration in 2012 of the first commitment period under the Kyoto Protocol will continue. Australia, Canada and Brazil are all signatories to the Kyoto Protocol. As such, our facilities in each of these countries will be impacted by the Kyoto Protocol, but in varying degrees according to the mechanisms each country establishes for compliance and each country’s commitment to reducing emissions. Australia and Canada are considered Annex 1 countries, meaning that they are obligated to reduce their emissions under the Protocol. In contrast, Brazil is not an Annex 1 country and is, therefore, not currently obligated to reduce its GHG emissions.

During 2008, Australia issued guidance outlining the components and rationale for its proposed carbon pollution reduction scheme, as well as associated timing. The plan calls for a cap and trade model with a medium-term target range of between 5 percent to 15 percent reduction in GHG by 2020. The guidance estimates

 

14


Table of Contents

allowance prices will be approximately $23 per ton, with a price cap of $40 per ton. The reduction scheme aims to provide some assistance to emissions-intensive, trade-exposed companies based on the amount and intensity of its direct and indirect GHG emissions, which is expected to include the iron ore industry. Compliance under Australia’s reduction scheme is expected to begin in 2010.

Due to the current landscape of regulation in Australia, Canada and Brazil, and the relatively low emission levels in these countries, we face mild regulatory risk in the short term in Australia and Canada and a weak regulatory risk over the longer term in Brazil.

By contrast, in the U.S., federal carbon regulation presents a significantly greater impact to our operations. To date, the U.S. has not implemented regulated carbon constraints. However, over the past several years, pressure for the U.S. to take mandatory action to address climate change has been mounting from numerous constituencies, including international pressure from other developed nations that have accepted prescribed reduction targets under the Kyoto Protocol, including among others, the European Union member states, Canada, Japan, and Australia; domestic political pressure on the U.S. Congress to enact carbon regulation from both the public and private sectors; and various media events which have drawn the attention of the general public to the climate change issue.

In the absence of comprehensive federal carbon regulation, numerous state and regional regulatory initiatives are under development or are becoming effective, thereby creating a disjointed approach to carbon control. These U.S. state level initiatives are indicative of the increasing support and need for U.S. federal carbon regulation. For us, the most significant regional initiative is the Midwest GHG Accord. The goal of this regional GHG accord is to provide the framework for regional action toward reducing GHG emissions in the absence of U.S. federal regulation. The Midwest GHG Accord plans to be fully implemented by May 2010, however given the timeframe for implementation, U.S. federal preemption remains a strong possibility. If implemented, this program will have direct regulatory implications to our facilities in Minnesota and Michigan. Targets have not yet been set under the Midwest GHG Accord and it is not certain at this time whether caps will be determined at the state level or as a single cap for all participating states. We are well positioned to closely monitor the development of the Midwest GHG Accord through our seat on the Michigan Climate Task Committee.

However, with U.S. federal regulation imminent on the horizon, the longevity of U.S. state and regional carbon regulation remains unclear. Should one or more of the regional GHG initiatives be implemented prior to definitive U.S. federal action, the viability of regional initiatives in light of U.S. federal carbon regulation will hinge on the preemption provisions of the U.S. federal policy.

While the exact form of a U.S. federal regulatory scheme is uncertain, we anticipate that legislation will be based upon the multiple bills currently introduced in U.S. Congress. It appears that any potential legislation would establish a long term, economy-wide cap and trade framework for reducing carbon emissions in the U.S. A general timeframe for such a program would impact the U.S. market through 2050. Such legislation will likely incorporate compliance flexibility provisions in an attempt to economically protect entities that are likely to be impacted with compliance costs, either directly or indirectly, as well as foster innovation and carbon-based energy project finance.

As an energy-intensive business, our Company’s GHG emissions inventory captures a broad range of emissions sources, such as iron ore furnaces and kilns, coal thermal driers, diesel mining equipment and a wholly-owned power generation plant, among others. As such, our most significant regulatory risks are: (1) the costs associated with on-site emissions levels; and (2) the costs passed through from power generators and distillate fuel suppliers to our Company. Our overall emission source portfolio consists of direct emissions of approximately 3.5 million tons CO2e and indirect emissions of approximately 3.2 million tons of CO2e. With that in mind, we believe our exposure can be substantially reduced by numerous factors including currently contemplated regulatory flexibility mechanisms, such as allowance allocations, fixed process emissions exemptions, offsets, and international provisions; emission reduction opportunities, including energy efficiency, fuel flexibility, and methane reduction; and business opportunities associated with new products and technology, such as our investments in Renewafuel and iron nuggets.

We have proactively worked to develop a comprehensive, enterprise-wide GHG management strategy aimed at considering all significant aspects associated with GHG initiatives to effectively plan for and manage

 

15


Table of Contents

climate change issues, including the risks and opportunities as they relate to the environment, stakeholders, including shareholders and the public, legislative and regulatory developments, operations, products and markets. At this time, while we are unable to predict the potential impacts of any future mandatory governmental GHG legislative or regulatory requirements on our businesses, we do believe we have acted proactively in developing our comprehensive implementation plan that has best prepared us to mitigate the potential risks and take advantage of any potential opportunities.

North American Iron Ore

In the construction of our facilities and in their operation, substantial costs have been incurred and will continue to be incurred to avoid undue effect on the environment. Our North American capital expenditures relating to environmental matters were $7.3 million, $8.8 million, and $10.5 million in 2008, 2007 and 2006, respectively. It is estimated that approximately $16 million will be spent in 2009 for capital environmental control facilities.

Title V Control City Monitoring Requirements.    On December 16, 2006, we submitted an administrative permit amendment application to the MPCA with respect to Northshore’s Title V operating permit. The proposed amendment requested the deletion of a 30-year old “control city” monitoring requirement which was used to assess the adequacy of air emission control equipment installed in the 1970s. We then received a letter dated February 23, 2007 from the MPCA notifying us that our proposed permit amendment had been denied. We appealed the denial to the Minnesota Court of Appeals. Oral arguments on our appeal were held on February 21, 2008. The court of appeals ruled in MPCA’s favor.

On July 28, 2008, MPCA issued a Notice of Violation, or NOV, to Northshore alleging violations related to the control city standard from March 2006 through October 2007. The NOV states that Northshore has been in compliance with MPCA’s interpretation of the standard since October 2007, but requires corrective actions relating to operating and maintaining treatment and control facilities to remain in compliance. Subsequent to the Minnesota Court of Appeals’ ruling, Northshore filed a major permit amendment on August 28, 2008. On November 25, 2008, in response to the proposed amendment, MCPA issued an order declaring that Northshore’s request to remove the control city standard from its permit constitutes a “project” for which an Environmental Assessment Worksheet, or EAW, must be completed. MPCA also stated that it was ceasing all other work on the permit, including its own efforts to create a replacement standard, until the environmental review process was complete.

Northshore filed an action to challenge the MPCA’s requirement for an EAW in Minnesota State District Court, which is currently pending. If either our legal challenge is unsuccessful or if we are unable to negotiate an acceptable compliance schedule, Northshore could be subject to future enforcement actions with respect to its Title V operating permit if we are unable to meet the permit requirements as interpreted by MPCA.

In October 2008, Northshore received the final results of the International Symposium on the Health Hazard Evaluation of Fibrous Particles Associated with Taconite and the Adjacent Duluth Complex. The peer-reviewed study concluded that there are no significant health effects related to Taconite fibers from Northshore.

Clean Air Interstate Rule.    In 2005, the EPA issued CAIR to reduce or eliminate the impact of upwind sources on out-of-state downwind non-attainment of National Ambient Air Quality Standards (“NAAQS”) for fine particulate matter and for ozone. CAIR requires upwind states to revise their State Implementation Plans to include control measures to reduce emissions of nitrogen oxide and sulfur dioxide.

As written, CAIR would apply to our Silver Bay Power Company power plant, a cogeneration plant which produces both electricity and steam for internal Northshore ore processing operations and electricity for sale. However, in July 2008, the D.C. Circuit Court of Appeals overturned the rule. On December 23, 2008, the D.C. Circuit Court of Appeals temporarily reinstated CAIR to reduce pollution from certain coal-fired power plants by setting emission reduction targets. In its reversal decision, the Court noted that having a flawed rule temporarily in place was better than having no rule at all. The EPA must revise the rule but has no definitive deadline for doing so. The decision means that emissions must be reduced in 28 eastern states and the District of Columbia effective January 1, 2009.

 

16


Table of Contents

The EPA will consider if Minnesota will be exempted from any revised CAIR rulemaking due to its lack of impact on downwind states. At this point in time, management believes the CAIR requirements will be stayed for Minnesota and Silver Bay Power will not likely be subject to CAIR in 2009. However, we are unable to predict whether Silver Bay Power will ultimately be subject to CAIR in 2009 and beyond due to the contemplated exemption for Minnesota facilities, and therefore, we plan to accrue for the estimated impact on our operations in 2009.

Regional Haze.    In June 2005, the EPA finalized amendments to its regional haze rules. The rules require states to establish goals and emission reduction strategies for improving visibility in all Class I national parks and wilderness areas. Among the states with Class I areas are Michigan, Minnesota, Alabama, and West Virginia where we currently own and manage mining operations.

The first phase of the regional haze rule (2008-2018) requires analysis and installation of BART on eligible emission sources and incorporation of BART and associated emission limits into State Implementation Plans.

As of 2009, Regional Haze will likely have a significant impact only at our Silver Bay Power facility in Minnesota. Currently, Silver Bay Power is working with the MPCA, who is still in the process of determining BART requirements for Silver Bay Power. As such, we are unable to accurately determine the potential impacts on its Silver Bay Power facilities; however it appears these requirements will not be effective until five years after the EPA approves Minnesota’s state implementation plan, which has not yet been submitted.

Mercury TMDL and Minnesota Taconite Mercury Reduction Strategy.    Mercury TMDL regulations are contained in the U.S. federal Clean Water Act. As a part of Minnesota’s Mercury TMDL Implementation Plan, in cooperation with the MPCA, the taconite industry developed a Taconite Mercury Reduction Strategy and signed a voluntary agreement to effectuate its terms. The strategy includes a 75 percent reduction of mercury air emissions from pellet plants by 2025 as a target. It recognizes that mercury emission control technology currently does not exist and will be pursued through a research effort. Any developed technology must be economically feasible, must not impact pellet quality, and must not cause excessive corrosion in pellet furnaces, associated duct work and existing wet scrubbers on the furnaces.

The Minnesota Department of Natural Resources (“DNR”), Mineland Division, has been conducting limited and very short-term mercury reduction tests on pellet furnaces for several years through financial contributions from all taconite mines and matching government funding. Injection of bromide salts to convert elemental mercury to oxidized mercury for capture by the existing wet scrubbers holds the most promise at this point in time.

According to the voluntary agreement, the mines must proceed with medium and long-term testing of this and other possible technologies beginning in 2010. Initial testing will be completed on one straight-grate and one grate-kiln furnace among the mines. Developed mercury emission control technology must then be installed on all taconite furnaces by 2025. For us, the requirements in the voluntary agreement will apply to our United Taconite and Hibbing facilities. At this point in time, we are unable to predict the potential impacts of the Taconite Mercury Reduction Strategy as it is just in its research phase with no proven technology yet identified.

Other Developments.    As part of Northshore’s permitting of the restart of Furnace 5 in March 2008, Northshore is required to certify compliance with air emission standards within 180 days of operation. During the scheduled compliance testing for Furnace 5, Northshore experienced abnormal operating difficulties and was thereby unable to certify compliance. Northshore received a Notice of Noncompliance from MPCA on December 18, 2008 indicating that it considers the facility out of compliance with the testing schedule and reserves the right to enforcement, while asking for additional explanation as to the related causes. Due to changes in market demand, Furnace 5 has been idled. Northshore expects that upon restart it will demonstrate compliance with the required limits and will perform retesting as soon as Furnace 5 returns to normal operating conditions. Accordingly, at that time, Northshore will take appropriate steps to establish compliance with MPCA.

On March 27, 2008, United Taconite received a DSA, from the MPCA alleging various air emissions violations of the facility’s air permit limit conditions, reporting and testing requirements. The allegations generally stem from procedures put in place prior to 2004 when we first acquired our interest in the mine. The DSA requires the facility to install continuous emissions monitoring, evaluate compliance procedures, submit a

 

17


Table of Contents

plan to implement procedures to eliminate air deviations during the relevant time period, and proposes a civil penalty in an amount to be determined. While United Taconite does not agree with MPCA’s allegations, United Taconite and the MPCA continue discussions on the matter with the intent of working toward a mutual resolution.

North American Coal

In 1996 and 1997, two cases were brought alleging that dust from the Concord Preparation Plant in Alabama damaged properties in the area. In 2002, the parties entered into settlement agreements with the former owner in exchange for a lump sum payment and the agreement to implement remedial measures, however, the plaintiffs were not required to dismiss their claims. PinnOak was added to these cases in 2004 and 2006. The plaintiffs in these matters sought additional remediation measures. The parties have reached a settlement on an amendment to the 2002 agreement, which was approved by the court on December 11, 2008. The terms of the amendment provide that in exchange for the implementation of a one year (up to eighteen months) ambient air monitoring plan, plaintiffs agree to release and dismiss us from the lawsuit upon successful completion of the ambient air monitoring plan. If the ambient air monitoring plan is not successfully completed, the parties will revert to their respective positions under the 2002 settlement agreement. In addition to the two cases noted above, in 2004 approximately 160 individual plaintiffs brought an action against PinnOak asserting injuries arising from particulate emissions from the Concord Preparation Plant. We are seeking a summary judgment in this most recent matter based on the 2002 settlement agreement.

Pinnacle owns the closed West Virginia Maitland mine, which continues to discharge groundwater to Elkhorn Creek under terms of a NPDES permit issued by the West Virginia DEP. On April 30, 2008 the DEP renewed the permit and imposed more stringent effluent quality limitations for iron and aluminum. Current effluent iron concentrations sometimes exceed the new limitation. A permit appeal was filed with the West Virginia Environmental Quality Board regarding the reduced limitations and the absence of a compliance schedule in the permit. Pinnacle reached an agreement with the West Virginia DEP that has provided a compliance schedule for meeting the new limits. We believe Pinnacle will be able to achieve the new limits without any material costs or changes in operation.

Asia Pacific Iron Ore

Environmental issues and their management continued to be an important focus at our Asia Pacific Iron Ore operations throughout 2008. Mining operations proceeded without major environmental incidents, and implementation of management controls at the Koolyanobbing operations continued, including maintaining certification of our environmental management system to the ISO 14001 standard in 2008. Compliance with regulatory requirements was maintained across the Koolyanobbing operations. Annual environmental report audits and site inspections were undertaken by regulators throughout the year. No significant non-conformances were recorded, but a number of recommendations were made to ensure compliance with legislation, tenement conditions and industry best practice. The recommendations raised by the regulators will be investigated and addressed during 2009.

The environmental permitting program at the Koolyanobbing operations continued throughout 2008. Approvals were obtained for a waste dump expansion at Windarling and the A pit expansion at Koolyanobbing. Baseline studies were completed for the large J1 development at Mount Jackson, and the approval submissions were lodged with federal and state authorities. Baseline and impact assessment studies were completed for further developments of the A, B and C pits at Koolyanobbing.

In May 2007, the WAEPA released a report outlining the recommendations for a significant extension of the conservation estate in the area of the Koolyanobbing mining operations. The report recommended the conversion of much of the area to Class A conservation reserve. Some of the proposed A class reserves overlap with mining tenements granted to Portman (the “Overlapping Areas”). The WAEPA study has been submitted to the Minister for the Environment and Heritage. The report represents the view of the WAEPA and neither creates an obligation on the government to act nor affects the rights of Portman to operate under existing approvals. We continue to communicate with the government and the environmental agencies in a manner that indicates a

 

18


Table of Contents

willingness to work with all parties to achieve a sustainable outcome for conservation and resource development in the region. Portman originally received governmental approval to mine in the Overlapping Areas in June 2003. Since that time, we have met applicable environmental requirements. Although we are currently reviewing the study and the effects of the designation of the Overlapping Areas as A class reserves, such categorization may have a material effect on our operations. In late 2008 there was a change of government at the state level, and it is unknown at this time whether the Minister for the Environment and Heritage will accept the recommendations of the AEPA.

At the Cockatoo Island operations, the focus of environmental work was on obtaining environmental approvals for a Stage 3 extension of the embankment mining project. In addition to this extension, work continued on refining the overall closure plan for Cockatoo Island taking into account the proposed extension. The Stage 3 extension and closure plan were reviewed as a package by regulators and approved in August 2008 for both the extension and the closure plan. Activities within the closure plan not associated with the Stage 3 extension took place in 2008 and are scheduled to continue throughout 2009.

For additional information on our environmental matters, refer to Item 3. Legal Proceedings and NOTE 7 — ENVIRONMENTAL AND MINE CLOSURE OBLIGATIONS in Item 8.

Energy

Electricity

The Empire and Tilden mines receive electric power from WEPCO. Prior to 2008, Empire and Tilden were under special contracts with WEPCO for supply of electricity. Under these contracts, Empire and Tilden were afforded an energy price cap and certain power curtailment features. These contracts expired at the end of the 2007 calendar year. Prior to the termination of the contracts in 2007, WEPCO initiated a tariff rate case in which Empire and Tilden participated in order to establish a new tariff rate for each mine upon the termination of the contracts. The resulting settlement of the rate case, which was approved by the MPSC, created a new industrial tariff rate. Effective January 1, 2008, Tilden and Empire receive their electrical power from WEPCO under the new tariff rate. On January 31, 2008, WEPCO filed a new rate case, proposing an increase to the tariff rates that became effective on January 1, 2008. In February 2008, we filed a petition to intervene in the new rate case. The mines reached a settlement with WEPCO on October 20, 2008 regarding new rates to be implemented on January 1, 2009 and this settlement was approved by the MPSC on November 13, 2008.

Electric power for the Hibbing and United Taconite mines is supplied by MP. On September 16, 2008, the mines finalized new seven-year agreements with a term from November 1, 2008 through at least December 31, 2015. The agreements are being reviewed by the Minnesota Public Utilities Commission for final approval in early 2009.

Silver Bay Power Company, a wholly-owned subsidiary of ours, with a 115 megawatt power plant, provides the majority of Northshore’s energy requirements. Silver Bay Power has an interconnection agreement with MP for backup power. Silver Bay Power entered into an agreement to sell 40 megawatts of excess power capacity to Xcel Energy under a contract that extends to 2011. In March 2008, Northshore reactivated one of its furnaces resulting in a shortage of electrical power of approximately 10 megawatts. As a result, supplemental electric power is purchased by Northshore from MP under an agreement that is renewable yearly with one-year termination notice required. The contract expires on June 30, 2011, which coincides with the expiration of Silver Bay Power’s 40 megawatt sales agreement with Xcel Energy.

Wabush owns a portion of the Twin Falls Hydro Generation facility that provides power for Wabush’s mining operations in Newfoundland. Wabush has a 20-year agreement with Newfoundland Power, which continues until December 31, 2014. This agreement allows an interchange of water rights in return for the power needs for Wabush’s mining operations. The Wabush pelletizing operations in Quebec are served by Quebec Hydro on an annual contract.

The Oak Grove mine and Concord Preparation Plant are supplied electrical power by Alabama Power under a five-year contract which continues in effect until terminated by either party providing written notice to the other in accordance with applicable rules, regulations, and rate schedules. Rates of the contract are subject to change during the term of the contract as regulated by the Alabama Public Service Commission.

 

19


Table of Contents

Electrical power to the Pinnacle, Green Ridge No. 1, Green Ridge No. 2 mines and the Pinnacle Preparation Plant are supplied by the Appalachian Power Company under two contracts. The Indian Creek contract was revised in 2008 to include service under Appalachian Power’s lower cost Large Capacity Power Primary Schedule and is renewable on July 24, 2009 and the Pinnacle Creek contract is renewable on July 4, 2009. Both contracts specify the applicable rate schedule, minimum monthly charge and power capacity furnished. Rates, terms and conditions of the contracts are subject to the approval of the Public Service Commission of West Virginia.

Koolyanobbing and its associated satellite mines draw power from independent diesel fueled power stations and generators. Temporary diesel power generation capacity has been installed at the Koolyanobbing operations, allowing sufficient time for a detailed investigation into the viability of long-term options such as connecting into the Western Australian South West Interconnected System or provision of natural gas or dual fuel (natural gas and diesel) generating capacity. These options are not economic for the satellite mines, which will continue being powered by diesel generators.

Electrical supply on Cockatoo Island is diesel generated. The powerhouse adjacent to the processing plant powers the shiploader, fuel farm and the processing plant. The workshop and administration office is powered by a separate generator.

Sonoma receives its electricity from the public grid generated by local electric retailer Ergon Energy. In 2009, Sonoma plans to go to the contestable energy market and invite offers to supply electricity on a long-term basis.

Process Fuel

We have contracts providing for the transport of natural gas for our North American iron ore and coal operations. At North American Iron Ore, the Empire and Tilden mines have the capability of burning natural gas, coal, or to a lesser extent, oil. The Hibbing and Northshore mines have the capability to burn natural gas and oil. The United Taconite mine has the ability to burn coal, natural gas and coke breeze. Although all of the U.S. iron ore mines have the capability of burning natural gas, the pelletizing operations for the U.S. iron ore mines utilize alternate fuels when practicable. Wabush has the capability to burn oil and coke breeze. Our North American Coal operations use natural gas and coal to fire thermal dryers at both the Pinnacle Complex and Oak Grove mine.

We have performed geological, engineering and economic studies to explore viable natural gas prospects. We currently have an undivided 75 percent working interest with a net revenue interest of 60 percent in leases and leasehold improvements, options, farm-in arrangements and other interests covered by the leases, including wells, equipment and property located in Gray County, Kansas. This exploration and development arrangement allows us to participate in the costs to drill and develop the gas wells and the income that is generated as a result.

Renewafuel

We have a 70 percent controlling interest in Renewafuel. Founded in 2005, Renewafuel produces high-quality, dense fuel cubes made from renewable and consistently available components such as corn stalks, switch grass, grains, soybean and oat hulls, wood, and wood byproducts. This is a strategic investment that provides an opportunity to utilize a “green” solution for further reduction of emissions consistent with our objective to contain costs and enhance efficiencies in a socially responsible manner. In addition to the potential use of Renewafuel’s biofuel cubes in our production process, the cubes will be marketable to other organizations as a potential substitute for western coal and natural gas. During the second quarter of 2008, Renewafuel announced it would build a next-generation biomass fuel production facility near Marquette, Michigan in addition to the current facility located in Battle Creek, Michigan. The Battle Creek facility has the capacity to produce approximately 60,000 tons of biofuel annually. On January 28, 2009, Renewafuel received a draft air permit from MDEQ for the Marquette plant, a significant milestone in the permitting process. Projected to begin construction in the first quarter of 2009, the Marquette plant would have the annual capacity to produce 150,000 tons of high-energy, low-emission biofuel.

 

20


Table of Contents

Research and Development

We have been a leader in iron ore mining technology for more than 160 years. We operated some of the first mines on Michigan’s Marquette Iron Range and pioneered early open-pit and underground mining methods. From the first application of electrical power in Michigan’s underground mines to the use of today’s sophisticated computers and global positioning satellite systems, we have been a leader in the application of new technology to the centuries-old business of mineral extraction. Today, our engineering and technical staffs are engaged in full-time technical support of our operations and improvement of existing products.

As part of our efforts to develop alternative metallic products, we are developing, with Kobe Steel, a commercial-scale reduced iron plant, which will convert hematite into nearly pure iron in nugget form utilizing Kobe Steel’s ITmk3® technology. This innovative technology has the potential to open new markets by offering an economically competitive supply of iron material for electric arc furnaces.

North American Coal and Asia Pacific Iron Ore do not have any material research and development projects.

Employees

As of December 31, 2008, we had a total of 5,711 employees.

 

     North
American
Iron Ore (1)
   North
American
Coal
   Asia Pacific
Iron Ore
   Corporate &
Support
Services
   Total

Salaried

   925    271    126    258    1,580

Hourly

   3,391    740    —      —      4,131
                        

Total

   4,316    1,011    126    258    5,711
                        

 

(1) Includes our employees and the employees of the North American joint ventures.

Hourly employees at our Michigan and Minnesota iron ore mining operations, excluding Northshore, are represented by the USW. On October 6, 2008, the USW ratified a new four-year labor contract, which replaces the labor agreement that expired on September 1, 2008. The new agreement covers approximately 2,300 USW-represented workers at our Empire and Tilden mines in Michigan, and our United Taconite and Hibbing mines in Minnesota.

Hourly employees at Wabush are represented by the USW. Wabush and the USW entered into a collective bargaining agreement in October 2004 that expires on March 1, 2009.

Hourly production and maintenance employees at our North American Coal mines are represented by the UMWA. Each of these subsidiary companies entered into new collective bargaining agreements with the UMWA in March 2007 that expire on December 31, 2011. Those collective agreements are identical in all material respects to the NBCWA of 2007 between the UMWA and the Bituminous Coal Operators’ Association.

Employees at our Asia Pacific and Latin American operations are not represented under collective bargaining agreements.

As of December 31, 2008, 53 percent of our employees were covered by collective bargaining agreements.

Growth Strategy

We expect to grow our business and presence as an international mining company by continuing to expand both geographically and through the minerals that we mine and market. Recent investments in Australia and Latin America, as well as acquisitions in minerals outside of iron ore, such as metallurgical coal, illustrate the execution of this strategy.

For further information regarding our growth strategy, refer to “Growth Strategy and Strategic Transactions” included in Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations, of this Annual Report on Form 10-K.

 

21


Table of Contents

Available Information

Our headquarters are located at 200 Public Square, Cleveland, Ohio 44114-2315, and our telephone number is (216) 694-5700. We are subject to the reporting requirements of the Exchange Act and its rules and regulations. The Exchange Act requires us to file reports, proxy statements and other information with the SEC. Copies of these reports and other information can be read and copied at:

SEC Public Reference Room

100 F Street N.E.

Washington, D.C. 20549

Information on the operation of the Public Reference Room may be obtained by calling the SEC at 1-800-SEC-0330.

The SEC maintains a website that contains reports, proxy statements and other information regarding issuers that file electronically with the SEC. These materials may be obtained electronically by accessing the SEC’s home page at www.sec.gov.

We make available, free of charge on our website, our Annual Report on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K and amendments to these reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange Act, as soon as reasonably practicable after we electronically file these documents with, or furnish them to, the SEC. These documents are posted on our website at www.cliffsnaturalresources.com — under “Investors”.

We also make available, free of charge on our website, the charter of the Audit Committee, Board Affairs Committee, Compensation and Organization Committee and Finance Committee as well as the Corporate Governance Guidelines and the Code of Business Conduct & Ethics adopted by our Board of Directors. These documents are posted on our website at www.cliffsnaturalresources.com — under “Investors”, select the “Corporate Governance” link.

References to our website do not constitute incorporation by reference of the information contained on our website, and such information is not part of this Form 10-K.

Copies of the above referenced information will also be made available, free of charge, by calling (216) 694-5700 or upon written request to:

Cliffs Natural Resources Inc.

Investor Relations

200 Public Square

Cleveland, OH 44114-2315

 

22


Table of Contents

EXECUTIVE OFFICERS OF THE REGISTRANT

Set forth below are: (1) the names and ages of all executive and certain other officers of the Company at February 26, 2009, (2) all positions with the Company presently held by each such person and (3) the positions held by, and principal areas of responsibility of, each such person during the last five years.

 

Name

  

Position(s) Held

     Age  

Joseph A. Carrabba

   Chairman, President and Chief Executive Officer    56

Laurie Brlas

   Executive Vice President — Chief Financial Officer    51

Donald J. Gallagher

   President, North American Business Unit    56

William A. Brake, Jr.

   Executive Vice President — Human and Technical Resources    48

William R. Calfee

   Executive Vice President — Commercial, North American Iron Ore    62

William C. Boor

   Senior Vice President — Business Development    42

Duke D. Vetor

   Senior Vice President — North American Coal    50

George W. Hawk, Jr.

   General Counsel and Secretary    52

There is no family relationship between any of our executive officers, or between any of our executive officers and any of our directors. Officers are elected to serve until successors have been elected. All of the above named executive officers were elected effective on the dates listed below for each such officer.

Joseph A. Carrabba has been Chairman, President and Chief Executive Officer of Cliffs since May 8, 2007. Mr. Carrabba served as Cliffs’ President and Chief Executive Officer from September 2006 through May 8, 2007 and as Cliffs’ President and Chief Operating Officer from May 2005 to September 2006. Mr. Carrabba previously served as President and Chief Operating Officer of Diavik Diamond Mines, Inc. from April 2003 to May 2005, a subsidiary of Rio Tinto plc., an international mining group. Mr. Carrabba is a Director of Newmont Mining Corporation.

Laurie Brlas has served as Executive Vice President — Chief Financial Officer of Cliffs since March 2008. Ms. Brlas served as Cliffs’ Senior Vice President — Chief Financial Officer from October 2007 through March 2008. From December 2006 to October 2007, Ms. Brlas served as Senior Vice President — Chief Financial Officer and Treasurer of Cliffs. From April 2000 to December 2006, Ms. Brlas was Senior Vice President — Chief Financial Officer of STERIS Corporation. In addition, Ms. Brlas is a Director of Perrigo Company and Nova Chemicals.

Donald J. Gallagher has served as President, North American Business Unit of Cliffs since November 2007. From December 2006 to November 2007, Mr. Gallagher served as President, North American Iron Ore. From July 2006 to December 2006, Mr. Gallagher served as President, North American Iron Ore, and Acting Chief Financial Officer and Treasurer of Cliffs. From May 2005 to July 2006, Mr. Gallagher was Executive Vice President, Chief Financial Officer and Treasurer of Cliffs. From July 2003 to May 2005, Mr. Gallagher served as Senior Vice President, Chief Financial Officer and Treasurer of Cliffs.

William A. Brake, Jr. has served as Executive Vice President, Human and Technical Resources of Cliffs since November 2008, when Mr. Brake assumed responsibility for human resources and labor relations in addition to his previous responsibilities. From April 2007 until November 2008, Mr. Brake served as Executive Vice President, Cliffs Metallics and Chief Technical Officer. From January 2006 to August 2006, Mr. Brake was Executive Vice President — Operations of Mittal Steel USA and from March 2005 to January 2006, he served as Executive Vice President — Operations East at Mittal Steel USA. From March 2003 to March 2005, Mr. Brake was Vice President and General Manager of International Steel Group.

William R. Calfee has served as Executive Vice President — Commercial, North American Iron Ore of Cliffs since July 2006. From 1996 to July 2006, Mr. Calfee served as Executive Vice President — Commercial of Cliffs.

William C. Boor has served as Senior Vice President, Business Development of Cliffs since May 2007. Mr. Boor served as Executive Vice President — Strategy and Development at American Gypsum Co. (a subsidiary of Eagle Materials Inc.) from February 2005 to April 2007 and Senior Vice President — Corporate Development and Investor Relations at Eagle Materials Inc. from May 2002 to February 2005.

 

23


Table of Contents

Duke D. Vetor has served as Senior Vice President, North American Coal of Cliffs since November 2007. From July 2006 to November 2007, Mr. Vetor served as Vice President — Operations — North American Iron Ore of Cliffs. Mr. Vetor was General Manager of Safety and Operations Improvement of Cliffs from December 2005 to July 2006. From 2003 to November 2005, Mr. Vetor served as Vice President — Operations of Diavik Diamond Mines.

George W. Hawk, Jr. has served as General Counsel and Secretary of Cliffs since January 2005. Prior to that, Mr. Hawk served as Assistant General Counsel and Secretary of Cliffs from August 2003 to December 2004 and Assistant General Counsel of Cliffs from February 2003 to July 2003. From 1998 to 2003, Mr. Hawk was Deputy General Counsel of Lincoln Electric Holdings, Inc.

Item 1A.    Risk Factors.

The current global economic crisis has created uncertainty and could adversely affect our business.

The current global economic crisis has adversely affected our business and could impact our financial results. All of our customers have announced curtailments of production, which has adversely affected the demand for our iron ore and coal products. Continuation or worsening of the current economic conditions, a prolonged global, national or regional economic recession or other events that could produce major changes in demand patterns, could have a material adverse effect on our sales, margins and profitability. We are not able to predict the impact the current global economic crisis will have on our operations and the industry in general going forward.

Steel consumption has slowed globally, leading to excess global capacity, which could result in increasing competition within the steel industry and increased imports into the United States, our largest market, potentially lowering the demand for iron ore and coal.

The world price of iron ore and coal are strongly influenced by international demand. Production at Portman, which comprises our Asia Pacific Iron Ore segment, is fully committed to steel companies in China and Japan. In addition, approximately 80 percent of 2009 production at Sonoma is committed under supply agreements with customers in Asia, including China. If the economic growth rate in China slows for an extended period of time, which may be difficult to forecast, less steel would be used in construction and manufacturing, which would decrease demand for iron ore and coal. This could adversely impact the world iron ore and coal markets and our operations, specifically, at Portman and Sonoma. A slowing of the economic growth rate globally leading to overcapacity in the steelmaking industry could also result in greater exports of steel out of Eastern Europe, Asia and Latin America, which, if imported into North America, could decrease demand for domestically produced steel, thereby decreasing the demand for iron ore and coal supplied in North America.

China’s domestic crude steel production climbed approximately two percent in 2008 as compared to 2007. Based on the American Iron and Steel Institute’s Apparent Steel Supply (excluding semi-finished steel products), imports of steel into the United States constituted approximately 24 percent, 23 percent and 27 percent of the domestic steel market supply for 2008, 2007 and 2006, respectively. Further, production of steel by North American integrated steel manufacturers may also be replaced, to some extent, by production of substitute materials by other manufacturers. In the case of some product applications, North American steel manufacturers compete with manufacturers of other materials, including plastic, aluminum, graphite composites, ceramics, glass, wood and concrete. Most of our term supply agreements for the sale of iron ore products are requirements-based or provide for flexibility of volume above a minimum level. Reduced demand for and consumption of iron ore products by integrated steel producers have had and may continue to have a significant negative impact on our sales, margins and profitability.

Capacity expansions within the industry could lead to lower global iron ore and coal prices or impact our production.

The increased demand for iron ore and coal, particularly from China, has resulted in the major iron ore and metallurgical coal suppliers increasing their capacity. In the current economic environment, any increase in our competitors’ capacity could result in excess supply of iron ore and coal, resulting in increased downward pressure on prices. A decrease in pricing would adversely impact our sales, margins and profitability.

 

24


Table of Contents

The current global economic crisis has resulted in increasing downward pressure on prices for iron ore and metallurgical coal.

The current global economic crisis has resulted in a great deal of pressure from customers, particularly in China, for a roll back of the 2008 price increases for seaborne iron ore and metallurgical coal. The 2008 record price increase was driven by high demand for iron ore and coking coal, historically high levels of global steel production, and combined with production and logistics constraints for both iron ore and coking coal, resulted in tight supply conditions. With the current global economic crisis, none of these conditions exist in early 2009; and the market now is characterized by a collapse in steel demand and limited global demand for iron ore and coking coal. Reduced demand for iron ore and coking coal will likely result in decreased demand for the Company’s products and decreasing prices, resulting in lower revenue levels in 2009, and decreasing margins as a result of decreased production, adversely affecting our results of operations, financial condition and liquidity.

If steelmakers use methods other than blast furnace production to produce steel, or if their blast furnaces shut down or otherwise reduce production, the demand for our iron ore and coal products may decrease.

Demand for our iron ore and coal products is determined by the operating rates for the blast furnaces of steel companies. However, not all finished steel is produced by blast furnaces; finished steel also may be produced by other methods that do not require iron ore products. For example, steel “mini-mills,” which are steel recyclers, generally produce steel primarily by using scrap steel and other iron products, not iron ore pellets, in their electric furnaces. Production of steel by steel mini-mills was approximately 60 percent of North American total finished steel production in 2008. North American steel producers also can produce steel using imported iron ore or semi-finished steel products, which eliminates the need for domestic iron ore. Environmental restrictions on the use of blast furnaces also may reduce our customers’ use of their blast furnaces. Maintenance of blast furnaces can require substantial capital expenditures. Our customers may choose not to maintain their blast furnaces, and some of our customers may not have the resources necessary to adequately maintain their blast furnaces. If our customers use methods to produce steel that do not use iron ore and coal products, demand for our iron ore and coal products will decrease, which could adversely affect our sales, margins and profitability.

A substantial majority of our sales are made under term supply agreements, which are important to the stability and profitability of our operations.

In 2008, virtually all of our North American Iron Ore sales volume, the majority of our North American Coal sales, and virtually all of our Asia Pacific Iron Ore sales were sold under term supply agreements. For North American Coal, these agreements typically cover a twelve-month period and are typically renewed each year. The Asia Pacific Iron Ore contracts expire in 2012. Our North American Iron Ore contracts have an average remaining duration of six years. We cannot be certain that we will be able to renew or replace existing term supply agreements at the same volume levels, prices or with similar profit margins when they expire. A loss of sales to our existing customers could have a substantial negative impact on our sales, margins and profitability.

Our North American Iron Ore term supply agreements contain a number of price adjustment provisions, or price escalators, including adjustments based on general industrial inflation rates, the price of steel and the international price of iron ore pellets, among other factors, that allow us to adjust the prices under those agreements generally on an annual basis. Our price adjustment provisions are weighted and some are subject to annual collars, which limit our ability to raise prices to match international levels and fully capitalize on strong demand for iron ore. Most of our North American Iron Ore term supply agreements do not otherwise allow us to increase our prices and to directly pass through higher production costs to our customers. An inability to increase prices or pass along increased costs could adversely affect our margins and profitability.

In North America, we depend on a limited number of customers.

Five customers together accounted for more than 80 percent of our North American Iron Ore sales revenues (representing more than 50 percent of our overall revenues) measured as a percent of product revenue for each of the past three years. If one or more of these customers were to significantly reduce their purchases of products from us, or if we were unable to sell products to them on terms as favorable to us as the terms under our current

 

25


Table of Contents

term supply agreements, our North American sales, margins and profitability could suffer materially due to the high level of fixed costs and the high costs to idle or close mines. The majority of the iron ore we manage and produce is for our own account, and therefore we rely on sales to our joint venture partners and other third-party customers for most of our revenues.

Although we currently have adequate liquidity, if the current global economic crisis extends beyond 2009, we may have difficulty maintaining adequate liquidity.

Based on our current borrowing capacity and the actions we have taken in response to the global economic crisis to conserve cash, we have adequate liquidity and expect to fund our business obligations from available cash, current operations and borrowing under our current credit facilities. However, if the current economic crisis deepens into a long term downturn, it is possible that we will face liquidity issues that will negatively impact our cash flow or borrowing capacity. In such circumstances, we may be forced to access higher cost forms of capital.

The current global economic crisis may limit available capital.

We expect to grow our business and presence as an international mining company by continuing to expand both geographically and through the minerals that we mine and market. To execute on this strategy we will need to have access to the capital markets to finance acquisition and developmental mining properties. In the current global economic crisis access to capital to finance new projects and acquisitions is extremely limited. If we are unable to access the capital markets our ability to execute on our growth strategy will be negatively impacted.

Our ability to collect payments from our customers depends on their creditworthiness.

Our ability to receive payment for products sold and delivered to our customers depends on the creditworthiness of our customers. With respect to our North American Coal and Asia Pacific Iron Ore business units, payment is typically received as the products are shipped. However, in our North American Iron Ore business unit, generally, we deliver iron ore products to our customers’ facilities in advance of payment for those products. Our rationale for delivering iron ore products to customers in advance of payment for the product is to more closely relate timing of payment to consumption and to reduce our financial risk to customer insolvency, as title and risk of loss with respect to those products does not pass to the customer until payment for the pellets is received. Accordingly, there is typically a period of time in which pellets, for which we have reserved title, are within our customers’ control. Consolidations in some of the industries in which our customers operate have created larger customers, some of which are highly leveraged. These factors have caused some customers to be less profitable and increased our exposure to credit risk. Current credit markets are highly volatile, and some of our customers are highly leveraged. A significant adverse change in the financial and/or credit position of a customer could require us to assume greater credit risk relating to that customer and could limit our ability to collect receivables. Failure to receive payment from our customers for products that we have delivered could adversely affect our results of operations, financial condition and liquidity.

Mine closures entail substantial costs, and if we close one or more of our mines sooner than anticipated, our results of operations and financial condition may be significantly and adversely affected.

If we close any of our mines, our revenues would be reduced unless we were able to increase production at our other mines, which may not be possible. The closure of a mining operation involves significant fixed closure costs, including accelerated employment legacy costs, severance-related obligations, reclamation and other environmental costs, and the costs of terminating long-term obligations, including energy contracts and equipment leases. We base our assumptions regarding the life of our mines on detailed studies we perform from time to time, but those studies and assumptions are subject to uncertainties and estimates that may not be accurate. We recognize the costs of reclaiming open pits and shafts, stockpiles, tailings ponds, roads and other mining support areas based on the estimated mining life of our property. If we were to significantly reduce the estimated life of any of our mines, the mine-closure costs would be applied to a shorter period of production, which would increase production costs per ton produced and could significantly and adversely affect our results of operations and financial condition.

 

26


Table of Contents

A North American mine permanent closure could significantly increase and accelerate employment legacy costs, including our expense and funding costs for pension and other postretirement benefit obligations. A number of employees would be eligible for immediate retirement under special eligibility rules that apply upon a mine closure. All employees eligible for immediate retirement under the pension plans at the time of the permanent mine closure also would be eligible for postretirement health and life insurance benefits, thereby accelerating our obligation to provide these benefits. Certain mine closures would precipitate a pension closure liability significantly greater than an ongoing operation liability. Finally, a permanent mine closure could trigger severance-related obligations, which can equal up to eight weeks of pay per employee, depending on length of service. No employee entitled to an immediate pension upon closure of a mine is entitled to severance. As a result, the closure of one or more of our mines could adversely affect our financial condition and results of operations.

We rely on estimates of our recoverable reserves, which is complex due to geological characteristics of the properties and the number of assumptions made.

We regularly evaluate our North American iron ore and coal reserves based on revenues and costs and update them as required in accordance with SEC Industry Guide 7. Portman and Sonoma have published reserves which follow Joint Ore Reserves Code in Australia, which is similar to United States requirements. Changes to the reserve value to make them comply with SEC requirements have been made. There are numerous uncertainties inherent in estimating quantities of reserves of our mines, many of which have been in operation for several decades, including many factors beyond our control.

Estimates of reserves and future net cash flows necessarily depend upon a number of variable factors and assumptions, such as production capacity, effects of regulations by governmental agencies, future prices for iron ore and coal, future industry conditions and operating costs, severance and excise taxes, development costs and costs of extraction and reclamation, all of which may in fact vary considerably from actual results. For these reasons, estimates of the economically recoverable quantities of mineralized deposits attributable to any particular group of properties, classifications of such reserves based on risk of recovery and estimates of future net cash flows prepared by different engineers or by the same engineers at different times may vary substantially as the criteria change. Estimated ore and coal reserves could be affected by future industry conditions, geological conditions and ongoing mine planning. Actual production, revenues and expenditures with respect to our reserves will likely vary from estimates, and if such variances are material, our sales and profitability could be adversely affected.

We rely on our joint venture partners in our mines to meet their payment obligations and are subject to risks involving the acts or omissions of our joint venture partners when we are not the manager of the joint venture.

We co-own four of our six North American iron ore mines with various joint venture partners that are integrated steel producers or their subsidiaries, including ArcelorMittal USA, and U.S. Steel Canada Inc. (formerly Stelco Inc.), or U.S. Steel Canada. While we are the manager of each of the mines we co-own, we rely on our joint venture partners to make their required capital contributions and to pay for their share of the iron ore pellets that we produce. Most of our venture partners are also our customers. If one or more of our venture partners fail to perform their obligations, the remaining venturers, including ourselves, may be required to assume additional material obligations, including significant pension and postretirement health and life insurance benefit obligations. The premature closure of a mine due to the failure of a joint venture partner to perform its obligations could result in significant fixed mine-closure costs, including severance, employment legacy costs and other employment costs, reclamation and other environmental costs, and the costs of terminating long-term obligations, including energy contracts and equipment leases.

We cannot control the actions of our joint venture partners, especially when we have a minority interest in a joint venture and are not designated as the manager of the joint venture. Further, in spite of performing customary due diligence prior to entering into a joint venture, we cannot guaranty full disclosure of prior acts or omissions of the sellers or those with whom we enter into joint ventures. Such risks could have a material adverse effect on the business, results of operations or financial condition of our joint venture interests.

 

27


Table of Contents

Our expenditures for postretirement benefit and pension obligations could be materially higher than we have predicted if our underlying assumptions prove to be incorrect, if there are mine closures or our joint venture partners fail to perform their obligations that relate to employee pension plans.

We provide defined benefit pension plans and OPEB to eligible union and non-union employees, including our share of expense and funding obligations with respect to unconsolidated ventures. Our pension expense and our required contributions to our pension plans are directly affected by the value of plan assets, the projected and actual rate of return on plan assets and the actuarial assumptions we use to measure our defined benefit pension plan obligations, including the rate at which future obligations are discounted.

We cannot predict whether changing market or economic conditions such as the current economic crisis, regulatory changes or other factors will increase our pension expenses or our funding obligations, diverting funds we would otherwise apply to other uses.

We have calculated our unfunded pension and OPEB obligations based on a number of assumptions. If our assumptions do not materialize as expected, cash expenditures and costs that we incur could be materially higher. Moreover, we cannot be certain that regulatory changes will not increase our obligations to provide these or additional benefits. These obligations also may increase substantially in the event of adverse medical cost trends or unexpected rates of early retirement, particularly for bargaining unit retirees for whom there is currently no retiree healthcare cost cap. Early retirement rates likely would increase substantially in the event of a mine closure.

Our sales and competitive position depend on the ability to transport our products to our customers at competitive rates and in a timely manner.

Disruption of the lake freighter and rail transportation services because of weather-related problems, including ice and winter weather conditions on the Great Lakes, strikes, lock-outs or other events, could impair our ability to supply iron ore pellets to our customers at competitive rates or in a timely manner and, thus, could adversely affect our sales and profitability. Similarly, our coal operations depend on international freighter and rail transportation services, as well as the availability of dock capacity, and any disruptions to such could impair our ability to supply coal to our customers at competitive rates or in a timely manner and, thus, could adversely affect our sales and profitability. Further, reduced levels of government funding may result in a lesser level of dredging, particularly at Great Lakes ports. Less dredging results in lower water levels, which restricts the tonnage freighters can haul over the Great Lakes, resulting in higher freight rates.

Our Asia Pacific Iron Ore operations are in direct competition with the major world seaborne exporters of iron ore and our customers face higher transportation costs than most other Australian producers to ship our products to the Asian markets because of the location of our major shipping port on the south coast of Australia. Further, increases in transportation costs, decreased availability of ocean vessels or changes in such costs relative to transportation costs incurred by our competitors, could make our products less competitive, restrict our access to certain markets and have an adverse effect on our sales, margins and profitability.

Our operating expenses could increase significantly if the price of electrical power, fuel or other energy sources increases.

Operating expenses at all of our mining locations are sensitive to changes in electricity prices and fuel prices, including diesel fuel and natural gas prices. In our North American Iron Ore locations, for example, these items make up approximately 20 percent of our North American Iron Ore operating costs. Prices for electricity, natural gas and fuel oils can fluctuate widely with availability and demand levels from other users. During periods of peak usage, supplies of energy may be curtailed and we may not be able to purchase them at historical rates. While we have some long-term contracts with electrical suppliers, we are exposed to fluctuations in energy costs that can affect our production costs. We enter into forward fixed-price supply contracts for natural gas and diesel fuel for use in our operations. Those contracts are of limited duration and do not cover all of our fuel needs, and price increases in fuel costs could cause our profitability to decrease significantly.

 

28


Table of Contents

Natural disasters, weather conditions, disruption of energy, unanticipated geological conditions, equipment failures, and other unexpected events may lead our customers, our suppliers, or our facilities to curtail production or shut down their operations.

Operating levels within the industry are subject to unexpected conditions and events that are beyond the industry’s control. Those events could cause industry members or their suppliers to curtail production or shut down a portion or all of their operations, which could reduce the demand for our iron ore and coal products, and could adversely affect our sales, margins, and profitability.

For example, in January of 2008, one of our customers provided us with a force majeure letter due to a fire on the smaller of its two operating furnaces. In February 2007, severe weather conditions caused significant ice buildup in the basin supplying water to the Hibbing facility tailings basin. This caused a production shutdown that lowered first quarter production output. In August 2007 and March 2008, production at Pinnacle slowed as a result of sandstone intrusions encountered within the coal panel being mined at the time, spreading fixed costs over less production than planned.

Interruptions in production capabilities will inevitably increase our production costs and reduce our profitability. We do not have meaningful excess capacity for current production needs, and we are not able to quickly increase production at one mine to offset an interruption in production at another mine.

A portion of our production costs are fixed regardless of current operating levels. As noted, our operating levels are subject to conditions beyond our control that can delay deliveries or increase the cost of mining at particular mines for varying lengths of time. These conditions include weather conditions (for example, extreme winter weather, floods and availability of process water due to drought) and natural disasters, pit wall failures, unanticipated geological conditions, including variations in the amount of rock and soil overlying the deposits of iron ore and coal, variations in rock and other natural materials and variations in geologic conditions and ore processing changes.

The manufacturing processes that take place in our mining operations, as well as in our processing facilities, depend on critical pieces of equipment. This equipment may, on occasion, be out of service because of unanticipated failures. In addition, many of our mines and processing facilities have been in operation for several decades, and the equipment is aged. In the future, we may experience additional material plant shutdowns or periods of reduced production because of equipment failures. Further, remediation of any interruption in production capability may require us to make large capital expenditures that could have a negative effect on our profitability and cash flows. Our business interruption insurance would not cover all of the lost revenues associated with equipment failures. Longer-term business disruptions could result in a loss of customers, which could adversely affect our future sales levels, and therefore our profitability.

Regarding the impact of unexpected events happening to our suppliers, many of our mines are dependent on one source for electric power and for natural gas. For example, Minnesota Power, Inc. is the sole supplier of electric power to our Hibbing and United Taconite mines; WEPCO is the sole supplier of electric power to our Tilden and Empire mines; and our Northshore mine is largely dependent on our wholly-owned power facility for its electrical supply. A significant interruption in service from our energy suppliers due to terrorism, weather conditions, natural disasters, or any other cause can result in substantial losses that may not be fully recoverable, either from our business interruption insurance or responsible third parties.

We are subject to extensive governmental regulation, which imposes, and will continue to impose, significant costs and liabilities on us, and future regulation could increase those costs and liabilities or limit our ability to produce iron ore and coal products.

We are subject to various federal, provincial, state and local laws and regulations in each jurisdiction in which we have operations on matters such as employee health and safety, air quality, water pollution, plant and wildlife protection, reclamation and restoration of mining properties, the discharge of materials into the environment, and the effects that mining has on groundwater quality and availability. Numerous governmental permits and approvals are required for our operations. We cannot be certain that we have been or will be at all times in complete compliance with such laws, regulations and permits. If we violate or fail to comply with these laws, regulations or permits, we could be fined or otherwise sanctioned by regulators.

 

29


Table of Contents

Prior to commencement of mining, we must submit to and obtain approval from the appropriate regulatory authority of plans showing where and how mining and reclamation operations are to occur. These plans must include information such as the location of mining areas, stockpiles, surface waters, haul roads, tailings basins and drainage from mining operations. All requirements imposed by any such authority may be costly and time-consuming and may delay commencement or continuation of exploration or production operations. In addition, new legislation and regulations and orders, including proposals related to climate change and protection of the environment, to which we would be subject or that would further regulate and tax our customers, namely the North American integrated steel producer customers, may also require us or our customers to reduce or otherwise change operations significantly or incur additional costs. Such new legislation, regulations or orders (if enacted) could have a material adverse effect on our business, results of operations, financial condition or profitability. For example, our U.S. operations are subject to MACT emissions standards for particulate matter promulgated by the EPA under the Clean Air Act effective October 31, 2006. The EPA’s decision not to regulate emissions of mercury or asbestos in the MACT Rule is the subject of a court remand, and the outcome cannot be predicted.

Further, we are subject to a variety of potential liability exposures arising at certain sites where we do not currently conduct operations. These sites include sites where we formerly conducted iron ore mining or processing or other operations, inactive sites that we currently own, predecessor sites, acquired sites, leased land sites and third-party waste disposal sites. We may be named as a responsible party at other sites in the future and we cannot be certain that the costs associated with these additional sites will not be material.

We also could be held liable for any and all consequences arising out of human exposure to hazardous substances used, released or disposed of by us or other environmental damage, including damage to natural resources. In particular, we and certain of our subsidiaries are involved in various claims relating to the exposure of asbestos and silica to seamen who sailed on the Great Lakes vessels formerly owned and operated by certain of our subsidiaries. The full impact of these claims, as well as whether insurance coverage will be sufficient and whether other defendants named in these claims will be able to fund any costs arising out of these claims, continues to be unknown.

Underground mining is subject to increased safety regulation and may require us to incur additional cost.

Recent mine disasters have led to the enactment and consideration of significant new federal and state laws and regulations relating to safety in underground coal mines. These laws and regulations include requirements for constructing and maintaining caches for the storage of additional self-contained self rescuers throughout underground mines; installing rescue chambers in underground mines; constant tracking of and communication with personnel in the mines; installing cable lifelines from the mine portal to all sections of the mine to assist in emergency escape; submission and approval of emergency response plans; and new and additional safety training. Additionally, new requirements for the prompt reporting of accidents and increased fines and penalties for violations of these and existing regulations have been implemented. These new laws and regulations may cause us to incur substantial additional costs, which may adversely impact our operating performance.

Coal mining is complex due to geological characteristics of the region.

The geological characteristics of coal reserves, such as depth of overburden and coal seam thickness, make them complex and costly to mine. As mines become depleted, replacement reserves may not be available when required or, if available, may not be capable of being mined at costs comparable to those characteristic of the depleting mines. These factors could materially adversely affect the mining operations and cost structures of, and customers’ ability to use coal produced.

Our profitability could be negatively affected if we fail to maintain satisfactory labor relations.

The USW represents all hourly employees at our North American Iron Ore locations except for Northshore. The UMWA represents hourly employees at our North American Coal locations. We have entered into an agreement with the USW on a new four-year labor contract to replace the labor agreement that expired on September 1, 2008 and that will cover approximately 2,300 USW-represented workers at our Empire and Tilden mines in Michigan, and our United Taconite and Hibbing mines in Minnesota. A five-year agreement runs until

 

30


Table of Contents

March 1, 2009 with our Canadian work force. The current UMWA agreement runs through 2011 at our coal locations. Hourly employees at the railroads we own that transport products among our facilities are represented by multiple unions with labor agreements that expire at various dates. If the collective bargaining agreements relating to the employees at our mines or railroads are not successfully renegotiated prior to their expiration, we could face work stoppages or labor strikes.

We may encounter labor shortages for critical operational positions, which could affect our ability to produce our products.

Prior to the current global economic crisis, the global mining industry was facing a critical shortage of essential skilled employees. Competition for the available workers was limiting our ability to attract and retain employees prior to the global economic crisis.

Despite the current economic downturn, we are predicting a long term shortage of skilled workers for the mining industry. At many of our mining locations, many of our mining operational employees are approaching retirement age. As these experienced employees retire, we may have difficulty replacing them at competitive wages. As a result, wages are increasing to address the turnover. In addition, when the global economy recovers, we will again be under increasing pressure to retain our existing skilled workers, also resulting in higher wages.

Our profitability could be affected by the failure of outside contractors to perform.

Portman and Sonoma use contractors to handle many of the operational phases of their mining and processing operations and therefore are subject to the performance of outside companies on key production areas.

We may be unable to successfully identify, acquire and integrate strategic acquisition candidates.

Our ability to grow successfully through acquisitions depends upon our ability to identify, negotiate, complete and integrate suitable acquisitions and to obtain necessary financing. It is possible that we will be unable to successfully complete potential acquisitions. In addition, the costs of acquiring other businesses could increase if competition for acquisition candidates increases. Additionally, the success of an acquisition is subject to other risks and uncertainties, including our ability to realize operating efficiencies expected from an acquisition, the size or quality of the resource, delays in realizing the benefits of an acquisition, difficulties in retaining key employees, customers or suppliers of the acquired businesses, difficulties in maintaining uniform controls, procedures, standards and policies throughout acquired companies, the risks associated with the assumption of contingent or undisclosed liabilities of acquisition targets, the impact of changes to our allocation of purchase price, and the ability to generate future cash flows or the availability of financing.

We are subject to risks involving operations in multiple countries.

We have a strategy to broaden our scope as a supplier of iron ore and other raw materials to the global integrated steel industry. As we expand beyond our traditional North American base business, we will be subject to additional risks beyond those risks relating to our North American operations, such as currency fluctuations; legal and tax limitations on our ability to repatriate earnings in a tax-efficient manner; potential negative international impacts resulting from U.S. foreign and domestic policies, including government embargoes or foreign trade restrictions; the imposition of duties, tariffs, import and export controls and other trade barriers impacting the seaborne iron ore and coal markets; difficulties in staffing and managing multi-national operations; and uncertainties in the enforcement of legal rights and remedies in multiple jurisdictions. If we are unable to manage successfully the risks associated with expanding our global business, these risks could have a material adverse effect on our business, results of operations or financial condition.

We are subject to a variety of market risks.

Market risks include those caused by changes in the value of equity investments, changes in commodity prices, interest rates and foreign currency exchange rates. We have established policies and procedures to manage such risks, however certain risks are beyond our control.

 

31


Table of Contents

Item 1B.    Unresolved Staff Comments.

We have no unresolved comments from the SEC.

Item 2.    Properties.

The following map shows the locations of our operations:

LOGO

Mine Facilities and Equipment.    Each of the North American Iron Ore mines has crushing, concentrating, and pelletizing facilities. There are crushing and screening facilities at Koolyanobbing and Cockatoo Island. North American Coal mines have preparation, processing, and load-out facilities, with the Pinnacle and Green Ridge mines sharing facilities. The facilities at each site are in satisfactory condition, although they require routine capital and maintenance expenditures on an ongoing basis. Certain mine equipment generally is powered by electricity, diesel fuel or gasoline. Our share of the total cost of the property, plant and equipment, net of applicable accumulated amortization and depreciation as of December 31, 2008, for each of the mines is set forth in the chart below.

 

     (In Millions)  

Mine Location

   Historical Cost of Mine
Plant and Equipment,
Net of Applicable
Accumulated Amortization and
Depreciation (Cliffs’ Share)
 

Empire

   $ 30.5 (1)

Tilden

     159.6 (2)

Hibbing

     13.2  

Northshore

     109.5  

United Taconite

     77.4  

Wabush

     15.2  

Pinnacle

     524.3 (5)

Oak Grove

     244.3  

Sonoma

     100.8 (6)

Cockatoo Island

     —   (4)

Koolyanobbing

     718.6  

Amapá

     —   (3)

 

(1) Includes capitalized financing costs of $3.2 million, net of accumulated amortization. Our consolidated net book value related to Empire is $0 as of December 31, 2008, based upon an impairment charge recorded in 2001.

 

32


Table of Contents
(2) Includes capitalized financing costs of $11.2 million, net of accumulated amortization.

 

(3) The mine is in the pre-production stage.

 

(4) Cockatoo Island plant and equipment is fully amortized.

 

(5) Includes capitalized financing costs of $0.7 million, net of accumulated amortization.

 

(6) Includes capitalized financing costs of $1.8 million, net of accumulated amortization.

North American Iron Ore

We directly or indirectly own and operate interests in the following six North American iron ore mines:

Empire mine

The Empire mine is located on the Marquette Iron Range in Michigan’s Upper Peninsula approximately 15 miles west-southwest of Marquette, Michigan. The mine has been in operation since 1963. Over the past five years, the Empire mine has produced between 4.6 million and 5.4 million tons of iron ore pellets annually.

We own 79.0 percent of Empire, and a subsidiary of ArcelorMittal USA has retained the remaining 21 percent ownership in Empire with limited rights and obligations, which it has a unilateral right to put to us at any time subsequent to the end of 2007. This right has not been exercised. We own directly approximately one-half of the remaining ore reserves at the Empire mine and lease them to Empire. A subsidiary of ours leases the balance of the Empire reserves from other owners of such reserves and subleases them to Empire.

Tilden mine

The Tilden mine is located on the Marquette Iron Range in Michigan’s Upper Peninsula approximately five miles south of Ishpeming, Michigan. The Tilden mine has been in operation since 1974. Over the past five years, the Tilden mine has produced between 6.9 million and 7.9 million tons of iron ore pellets annually.

We own 85 percent of Tilden, with the remaining minority interest owned by U.S. Steel Canada. Each partner takes its share of production pro rata; however, provisions in the partnership agreement allow additional or reduced production to be delivered under certain circumstances. We own all of the ore reserves at the Tilden mine and lease them to Tilden.

The Empire and Tilden mines are located adjacent to each other. The logistical benefits include a consolidated transportation system, more efficient employee and equipment operating schedules, reduction in redundant facilities and workforce and best practices sharing.

Hibbing mine

The Hibbing mine is located in the center of Minnesota’s Mesabi Iron Range and is approximately ten miles north of Hibbing, Minnesota and five miles west of Chisholm, Minnesota. The Hibbing mine has been in operation since 1976. Over the past five years, the Hibbing mine has produced between 7.4 million and 8.5 million tons of iron ore pellets annually.

We own 23.0 percent of Hibbing, ArcelorMittal USA has a 62.3 percent interest, and U.S. Steel Canada has a 14.7 percent interest. Each partner takes its share of production pro rata; however, provisions in the joint venture agreement allow additional or reduced production to be delivered under certain circumstances.

Northshore mine

The Northshore mine is located in northeastern Minnesota, approximately two miles south of Babbitt, Minnesota on the northeastern end of the Mesabi Iron Range. Northshore’s processing facilities are located in Silver Bay, Minnesota, near Lake Superior. The Northshore mine has been in continuous operation since 1990. Over the past five years, the Northshore mine has produced between 4.8 million and 5.5 million tons of iron ore pellets annually.

 

33


Table of Contents

The Northshore mine began production under our management and ownership on October 1, 1994. We own 100 percent of the mine.

United Taconite mine

The United Taconite mine is located on Minnesota’s Mesabi Iron Range in and around the city of Eveleth, Minnesota. The United Taconite concentrator and pelletizing facilities are located 10 miles south of the mine, near the town of Forbes, Minnesota. The mine has been operating since 1965. Over the past five years, the United Taconite mine has produced between 1.6 million and 5.3 million tons of iron ore pellets annually.

On July 11, 2008, we signed and closed on the acquisition of the remaining 30 percent interest in United Taconite, with an effective date of July 1, 2008. Upon consummation of the purchase, our ownership interest in United Taconite increased from 70 percent to 100 percent.

Wabush mine

The Wabush mine and concentrator are located in Wabush, Labrador, Newfoundland, and the pellet plant is located in Pointe Noire, Quebec, Canada. The Wabush mine has been in operation since 1965. Over the past five years, the Wabush mine has produced between 3.8 million and 5.2 million tons of iron ore pellets annually. We own 26.8 percent of Wabush, Dofasco has a 28.6 percent interest and U.S. Steel Canada has a 44.6 percent interest.

North American Coal

We directly own and operate the following two North American coal mining complexes:

Pinnacle Complex

The Pinnacle Complex includes the Pinnacle and Green Ridge mines and is located approximately 30 miles southwest of Beckley, West Virginia. The Pinnacle mine has been in operation since 1969. Over the past five years, the Pinnacle mine has produced between 1.4 million and 2.5 million tons of coal annually. The Green Ridge mine has been in operation since 2004 and has produced between 0.3 million and 0.5 million tons of coal annually.

Oak Grove mine

The Oak Grove mine is located approximately 25 miles southwest of Birmingham, Alabama. The mine has been in operation since 1972. Over the past five years, the Oak Grove mine has produced between 1.0 million and 1.7 million tons of coal annually.

Asia Pacific Iron Ore

Koolyanobbing

The Koolyanobbing operations are located 425 kilometers east of Perth and approximately 50 kilometers northeast of the town of Southern Cross. Koolyanobbing produces lump and fine iron ore. An expansion program was completed in 2006 to increase capacity from six to eight million tonnes per annum. The expansion was primarily driven by the development of iron ore resources at Mount Jackson and Windarling, located 80 kilometers and 100 kilometers north of the existing Koolyanobbing operations, respectively. Over the past five years, the Koolyanobbing operation has produced between 4.9 million and 7.6 million tonnes annually.

Cockatoo Island

The Cockatoo Island operation is located six kilometers to the west of Yampi Peninsula, in the Buccaneer Archipelago, and 140 kilometers north of Derby in the West Kimberley region of Western Australia. The island has been mined for iron ore since 1951, with a break in operations between 1985 and 1993. Over the past five years, Cockatoo Island has produced between 0.6 million and 1.4 million tonnes annually.

 

34


Table of Contents

Portman commenced a beneficiation project in 1993 that was completed in mid-2000. Portman owns a 50 percent interest in this joint venture to mine remnant iron ore deposits. Mining from this phase of the operation commenced in late 2000. In 2008, Cockatoo Island production began to reduce, as the second stage of the seawall reserves were exhausted. Construction on a necessary extension of the existing seawall commenced in the third quarter 2008, with production anticipated to restart by the end of the second quarter 2009. This extension is expected to extend production for approximately two additional years, through June 2011. Ore is hauled by haul truck to the stockpiles, crushed and screened and then transferred by conveyor to the shiploader.

Transportation

North American Iron Ore

Two railroads, one of which is wholly-owned by us, link the Empire and Tilden mines with Lake Michigan at the loading port of Escanaba, Michigan and with the Lake Superior loading port of Marquette, Michigan. From the Mesabi Range, Hibbing pellets are transported by rail to a shiploading port at Superior, Wisconsin. United Taconite pellets are shipped by railroad to the port of Duluth, Minnesota. At Northshore, crude ore is shipped by a wholly-owned railroad from the mine to processing and dock facilities at Silver Bay, Minnesota. In Canada, there is an open-pit mine and concentrator at Wabush, Labrador, Newfoundland and a pellet plant and dock facility at Pointe Noire, Quebec. At the Wabush mine, concentrates are shipped by rail from the Scully mine at Wabush to Pointe Noire where they are pelletized for shipment via vessel within Canada, to the United States and other international destinations or shipped as concentrates for sinter feed.

North American Coal

Our coal production is shipped within the U.S. by rail or barge. Coal for international customers is shipped through the port of Mobile, Alabama or Newport News, Virginia.

Asia Pacific Iron Ore

All of the ore mined at the Koolyanobbing operations is transported by rail to the Port of Esperance, 575 kilometers to the south for shipment to Asian customers. Direct ship premium fines mined at Cockatoo Island are loaded at a local dock. On July 17, 2008, Portman entered into an agreement to upgrade the rail line related to our operations in Asia Pacific. The upgrade is being performed to mitigate the risk of derailment and reduce service disruptions by providing a more robust infrastructure. The improvements include the replacement of 120 kilometers of rail and associated parts. As a result, we have incurred a purchase commitment of approximately $39 million for maintenance and improvements to the rail structure. The project is expected to be completed by the end of the first quarter in 2010.

Internal Control Over Reserve Estimation

We have a corporate policy relating to internal control and procedures with respect to auditing and estimating mineral reserves. The procedures include the calculation of mineral reserves at each mine by mining engineers and geologists under the direction of our Chief Mining Engineer. Our General Manager of Resource Technology compiles, reviews, and submits the calculations to the Corporate Accounting department, where the disclosures for our annual and quarterly reports are prepared based on those calculations. The draft disclosure is submitted to our General Manager of Resource Technology for further review and approval. The draft disclosures are then reviewed and approved by our Chief Financial Officer and Chief Executive Officer before inclusion in our annual and quarterly reports. Additionally, the long-range mine planning and mineral reserve estimates are reviewed annually by our Audit Committee. Furthermore, all changes to mineral reserve estimates, other than those due to production, are documented by our General Manager of Resource Technology and are submitted to our President and Chief Executive Officer for review and approval. Finally, we perform periodic reviews of long-range mine plans and mineral reserve estimates at mine staff meetings and senior management meetings.

 

35


Table of Contents

Operations

In North America, we produced 22.9 million, 21.8 million and 20.8 million long tons of iron ore pellets in 2008, 2007 and 2006, respectively, for our account and 12.3 million, 12.8 million and 12.8 million long tons, respectively, on behalf of the steel company owners of the mines. We also produced 3.5 million and 1.1 million short tons of coal in North America in 2008 and 2007, respectively, representing our volume since the acquisition of PinnOak on July 31, 2007. In Australia, we produced 7.7 million tonnes, 8.4 million tonnes and 7.7 million tonnes in 2008, 2007 and 2006, respectively. Refer to Production and Sales Volume included in Item 7 — Management’s Discussion and Analysis of Financial Condition and Results of Operations, for further information.

Our business is subject to a number of operational factors that can affect our future profitability. A more detailed description of these risks is included in Item 1A. Risk Factors.

Mine Capacity and Ore Reserves

Reserves are defined by SEC Industry Standard Guide 7 as that part of a mineral deposit that could be economically and legally extracted and produced at the time of the reserve determination. All reserves are classified as proven or probable and are supported by life-of-mine plans.

Iron Ore Reserves

Ore reserve estimates for our iron ore mines as of December 31, 2008 were estimated from fully-designed open pits developed using three-dimensional modeling techniques. These fully designed pits incorporate design slopes, practical mining shapes and access ramps to assure the accuracy of our reserve estimates. The following tables reflect expected current annual capacity and economic ore reserves for our North American and Asia Pacific iron ore mines as of December 31, 2008.

North American Iron Ore

 

Mine

  Iron Ore
Mineralization
  Current
Annual
Capacity
  Mineral Reserves (2) (3)   Mineral
Rights
    Method of
Reserve
Estimation
  Operating
Since
  Infrastructure
      Current Year   Previous
Year
       
      Proven   Probable   Total          
              Owned     Leased        
        Tons in millions (1)                        

Empire

  Negaunee Iron
Formation
(Magnetite)
  5.5   33   —     33   10   53 %   47 %   Geologic -
Block Model
  1963   Mine, Concentrator,
Pelletizer

Tilden

  Negaunee Iron
Formation
(Hematite,
Magnetite)
  8.0   219   61   280   252   100 %   0 %   Geologic -
Block Model
  1974   Mine, Concentrator,
Pelletizer, Railroad

Hibbing Taconite

  Biwabik Iron
Formation
(Magnetite)
  8.0   104   10   114   145   3 %   97 %   Geologic -
Block Model
  1976   Mine, Concentrator,
Pelletizer

Northshore (4)

  Biwabik Iron
Formation
(Magnetite)
  5.7   298   10   308   313   0 %   100 %   Geologic -
Block Model
  1989   Mine, Concentrator,
Pelletizer, Railroad

United Taconite

  Biwabik Iron
Formation
(Magnetite)
  5.4   128   16   144   149   0 %   100 %   Geologic -
Block Model
  1965   Mine, Concentrator,
Pelletizer

Wabush

  Sokoman Iron
Formation
(Hematite)
  5.5   75   —     75   39   0 %   100 %   Geologic -
Block Model
  1965   Mine, Concentrator,
Pelletizer, Railroad
                               
  Total   38.1   857   97   954   908          

 

(1) Tons are long tons of 2,240 pounds.

 

(2) Estimated standard equivalent pellets, including both proven and probable reserves based on life-of-mine operating schedules.

 

(3) We regularly evaluate our reserve estimates and update them in accordance with SEC Industry Guide 7.

 

(4) Northshore annual capacity increased in 2008 from 4.8 million through reactivation of idled concentrating and pelletizing plant sections.

 

36


Table of Contents

In 2008, there were no changes in reserve estimates at Northshore or United Taconite, except for production.

New economic reserve analyses were performed at Empire, Tilden, Hibbing and Wabush in 2008. Each of the new reserve analyses incorporate updates to both iron ore pellet pricing and operating costs. Changes in the reserve estimates are as follows:

 

   

Empire – Pellet reserves are increased by 26 million tons net of 2008 production. The increased reserves are obtained by an additional pit pushback.

 

   

Tilden – Pellet reserves are increased by 35 million tons net of 2008 production. The increased reserves are obtained by an additional pit pushback of the hematite main pit.

 

   

Hibbing – Pellet reserves are decreased by 23 million tons net of 2008 production. The decreased reserves are due to the inability of life of mine scheduling to accommodate all low recovery ores while maintaining an 8.0 million ton annual pellet production rate. The previous ore reserve estimate for Hibbing Taconite was based on a 7.8 million ton operating rate that allowed maximum utilization of these ores.

 

   

Wabush – Pellet reserves were increased by 40 million tons net of 2008 production. The increased reserves are obtained by optimizing manganese cut-off grades for pellet specifications and operational improvements in pit dewatering allowing for deeper pit designs.

Asia Pacific Iron Ore

 

    Iron Ore
Mineralization
  Current
Annual
Capacity
  Mineral Reserves (2) (3)   Mineral
Rights
    Method of
Reserve

Estimation
   
        Current Year   Previous
Year
           

Mine

      Proven   Probable   Total     Owned     Leased       Operating
Since
 

Infrastructure

        Tonnes in million (1)                        

Koolyanobbing (4)

  Banded Iron
Formations
Southern
Cross Terrane
Yilgarn Mineral
Field (Hematite,
Goethite)
  8.2   6.7   83.8   90.5   95.1   0 %   100 %   Geologic -
Block Model
  1994   Mine, Road Train Haulage, Crushing- Screening Plant

Cockatoo Island JV (5,6)

  Sandstone Yampi
Formation
Kimberley
Mineral Field
(Hematite)
  1.2   —     2.3   2.3   0.5   0 %   100 %   Geologic -
Block Model
  1994  

Mine,

Crushing-Screening Plant, Shiploader

                                 
  Total   9.4   6.7   86.1   92.8   95.6          

 

(1) Metric tons of 2,205 pounds.

 

(2) Reported ore reserves restricted to proven and probable tonnages based on life of mine operating schedules. 6.7 million tonnes of the Koolyanobbing reserves are sourced from current stockpiles.

 

(3) Asia Pacific Iron Ore’s reserve estimates are regularly updated in accordance with SEC Industry Guide 7 and the 2004 Edition of the JORC Code.

 

(4) Rail and plant upgrades in 2008 increase the annual capacity to 8.2 million tonnes for 2009.

 

(5) Asia Pacific Iron Ore has a 50% interest in the Cockatoo Island joint venture. Reserves reported at 100% and represent the Stage 3 Seawall extension project area.

 

(6) The Cockatoo Stage 3 Seawall extension is scheduled for completion in July 2009 with first shipment from the restarted operation scheduled for the same month.

Net of 2008 mine depletion, Koolyanobbing ore reserves have increased by 3 million tonnes. The increase is related to mine planning optimization and conversion of inferred mineralization to indicated resources enabling their utilization in economic reserve analyses.

During 2008 the Cockatoo Island Stage 2 seawall embankment project reserves were exhausted. A Stage 3 extension of the seawall embankment commenced in 2008 which will provide access to an additional 2.3 million tonnes of premium high grade iron ore fines for the joint venture. This extension is expected to extend production for approximately two additional years, through June 2011.

 

37


Table of Contents

Coal Reserves

North American Coal

Coal reserve estimates for our North American underground coal mines as of December 31, 2008 were estimated using three-dimensional modeling techniques, coupled with mine plan designs. A complete re-estimation of the moist, recoverable coal reserves was completed subsequent to the 2007 acquisition. The following table reflects expected current annual capacities and economically recoverable reserves for our North American coal mines as of December 31, 2008.

 

Mine (2)

  Category (3)   Current
Annual
Capacity
  Proven and Probable
Reserves
  Mineral Rights     Method of
Reserve
Estimation
  Infrastructure
      In-place   Moist
Recoverable
  Owned     Leased      
        Tons in Millions (1)                    

Pinnacle Complex

    4.0       0 %   100 %   Geologic -   Mine, Preparation

Pocahontas No 3

  Assigned     121.9   60.6       Block Model   Plant, Load-out

Pocahontas No 4

  Unassinged     32.8   11.1        

Oak Grove

    2.5       0 %   100 %   Geologic -   Mine, Preparation

Blue Creek Seam

  Assigned     92.9   48.4       Block Model   Plant, Load-out
                     

Total

    6.5   247.6   120.1        
                     

 

(1) Short tons of 2,000 pounds.

 

(2) All coal extracted by underground mining using longwall and continuous miner equipment.

 

(3) Assigned reserves represent coal reserves that can be mined without a significant capital expenditure for mine development, whereas unassigned reserves will require significant capital expenditures to mine the reserves.

All recoverable coal reserves at our North American operations are high quality, low volatile, metallurgical grade coal. The following table presents the coal quality at our North American coal mines.

 

Mine

   Coal Type    Moist Recoverable
Reserves (1)
Proven & Probable
   Sulfur
Content%
   As Received
Btu/lb

Pinnacle Complex

           

Pocahontas No 3

   Metallurgical    60.6    0.76    14,000

Pocahontas No 4

   Metallurgical    11.1    0.60    14,000

Oak Grove

           

Blue Creek Seam

   Metallurgical    48.4    0.53    13,300
             

Total

      120.1      
             

 

(1) In millions of short tons of 2,000 pounds.

Asia Pacific Coal

The coal reserve estimate for our Asia Pacific coal mine as of December 31, 2008 is based on a JORC-compliant resource estimate. An optimized pit design for an initial 10-year mine operating schedule was generated supporting the reserve estimate.

 

38


Table of Contents

The following table reflects expected current annual capacity and economically recoverable reserves for the Sonoma Project:

 

Mine (2)

  Category (3)   Current
Annual
Capacity (4)
  Proven and Probable   Mineral Rights     Method of
Reserve
Estimation
  Infrastructure
      In-place   Moist Recoverable   Owned     Leased      
        Tonnes in Millions (1)                    

Sonoma

               

Moranbah Coal Measures B, C and E Seams

  Assigned   4.0   43.3   25.3   0 %   100 %   Geologic -
Block Model
  Mine, Preparation,
Plant, Load-out

 

(1) Metric tons of 2,205 pounds. In-place coal at 8 percent moisture, recoverable clean coal at 9 percent moisture. Reserves listed on 100 percent basis. Cliffs Natural Resources has an effective 45 percent interest in the joint venture.

 

(2) All coal is extracted by conventional surface mining techniques.

 

(3) Assigned reserves represent coal reserves that can be mined without a significant capital expenditure for mine development, whereas unassigned reserves will require significant capital expenditures to mine the reserves.

 

(4) Annual capacity increased from 3.0 million tonnes with completion of coal preparation plant installations.

An increase in Sonoma coal reserves of 1 million tonnes net of 2008 production is due to updated yield assumptions from 2008 upgrades to the coal preparation plant and operating results.

The Sonoma Project’s recoverable coal reserves are primarily metallurgical grade coal (standard coking coal plus low volatile coal for pulverized coal injection) with lesser steam coal. Sonoma coal quality is presented in the following table.

 

Mine

  

Coal Type (2)

   Moist Recoverable Reserves
Proven & Probable (1)
   Sulfur
Content %
   As Received
Btu/lb

Sonoma

           
   Metallurgical    11.2    0.48    13,800
   Steam    14.1    0.55    10,800
             

Total

      25.3      

 

(1) In million of metric tons of 2,205 pounds. In-place coal at 8 percent moisture, recoverable clean coal at 9 percent moisture. Reserves listed on 100% basis. Cliffs Natural Resources has an effective 45 percent interest in the Joint Venture.

 

(2) Sonoma steam coal recoverable reserves meet US compliance standards as defined by Phase II of the Clean Air Act as coal having sulfur dioxide content of 1.2 pounds or less per million Btu.

General Information about the Mines

Leases.    Mining is conducted on multiple mineral leases having varying expiration dates. Mining leases are routinely renegotiated and renewed as they approach their respective expiration dates.

Exploration and Development.    All iron ore mining operations are open-pit mines that are in production. Additional pit development is underway at each mine as required by long-range mine plans. At our North American Iron Ore mines, drilling programs are conducted periodically for the purpose of refining guidance related to ongoing operations.

The Biwabik, Negaunee, and Wabush Iron Formations are classified as Lake Superior type iron-formations that formed under similar sedimentary conditions in shallow marine basins approximately two billion years ago. Magnetite and hematite are the predominant iron oxide ore minerals present, with lesser amounts of goethite and limonite. Chert is the predominant waste mineral present, with lesser amounts of silicate and carbonate minerals. The ore minerals liberate from the waste minerals upon fine grinding.

All North American Coal mine operations are underground mines that are in production. Drilling programs are conducted periodically for the purpose of refining guidance related to ongoing operations. The Pocahontas No 3 and Blue Creek Coal Seams are Pennsylvanian Age low ash, high quality coals.

 

39


Table of Contents

At Koolyanobbing, an exploration program targeting extensions to the iron ore resource base as well as regional exploration targets in the Yilgarn Mineral Field was active in 2007 and continued in 2008. At Cockatoo Island, feasibility studies have been completed for a below-sea-level eastward mine pit extension. The Stage 3 extension was reviewed by the regulators and approved in August 2008. Construction on a necessary extension of the existing seawall commenced in the third quarter 2008, with production anticipated to restart by the end of the second quarter 2009. This extension is expected to extend production for approximately two additional years, through June 2011.

The mineralization at the Koolyanobbing operations is predominantly hematite and goethite replacements in greenstone-hosted banded iron-formations. Individual deposits tend to be small with complex ore-waste contact relationships. The Koolyanobbing operations reserves are derived from 15 separate mineral deposits distributed over a 100-kilometer operating radius. The mineralization at Cockatoo Island is predominantly soft, hematite-rich sandstone that produces premium high grade, low impurity direct shipping fines.

An exploration program providing geologic definition of the hematite mineralization at Amapá is ongoing. Mineralized material at the Amapá mine is predominantly hematite occurring in weathered and leached greenstone-hosted banded iron-formation of the Archean Vila Nova Group. Variable degrees of leaching generate soft hematite mineralization suitable for either sinter feed production via crushing and gravity separation or pelletizing feed production via grinding and flotation.

In Australia, the Sonoma mine operation is an open-cut mine located in the northern section of Queensland’s Bowen Basin. A mix of high quality metallurgical coal and thermal coal is recovered from the B and C seams of the Permian Mooranbah Coal Measures.

Geologic models are developed for all mines to define the major ore and waste rock types. Computerized block models are then constructed that include all relevant geologic and metallurgical data. These are used to generate grade and tonnage estimates, followed by detailed mine design and life of mine operating schedules.

Item 3.    Legal Proceedings.

Alabama Dust Litigation.    In 1996 and 1997, two cases (White, et al. v. USX Corporation, et al., and Weekley, et al. v. USX Corporation, et al.) were brought alleging that dust from the Concord Coal Preparation Plant damaged properties in the area. In 2002, the parties entered into settlement agreements with the former owner in exchange for a lump sum payment and the agreement to implement remedial measures. However, the plaintiffs were not required to dismiss their claims. PinnOak was added to these cases in 2004 and 2006. The plaintiffs in both these matters sought additional remediation measures, and we opposed that request. The parties have reached agreement on an amendment to the 2002 settlement of the White matter, which on December 11, 2008, was approved by the court. The terms of the amendment provide that in exchange for an immaterial amount as payment for attorneys’ fees and costs and the implementation of a one year ambient air monitoring plan, which could lengthen to 18 months under certain circumstances, plaintiffs agreed to release and dismiss us from the lawsuit upon successful completion of the ambient air monitoring plan. If the ambient air monitoring plan is not successfully completed, the parties will revert to their respective positions under the 2002 settlement agreement. The Weekley case is currently pending before the Supreme Court of Alabama on a petition for writ of mandamus, arguing that the case should be dismissed in light of the White class action settlement. In addition to the two cases noted above, in 2004 approximately 160 individual plaintiffs brought an action against PinnOak asserting injuries arising from particulate emissions from the Concord Preparation Plant. We are seeking a summary judgment in this most recent matter because it had previously been concluded under the 2002 settlement agreement.

In 2006, in Gamble, et al. v. PinnOak Resources, LLC, et al., 13 plaintiffs brought an action against PinnOak related to the operation of the Concord Coal Preparation Plant. These plaintiffs asserted that dangerous levels of coal dust emissions had been allowed to accumulate at that facility. We denied this allegation, and on April 15, 2008, the United States District Court for the Northern District of Alabama, Southern Division, dismissed the case without prejudice for lack of standing on the part of the plaintiffs.

 

40


Table of Contents

American Steamship Litigation.    One of our subsidiaries, Cliffs Sales Company, currently contracts with American Steamship Company, or ASC, for the transportation of iron ore pellets from various ports on the Great Lakes to a blast furnace ore dock in Cleveland, Ohio. There are nine years remaining on that contract and we filed suit against ASC on February 21, 2007 alleging breach of contract and unjust enrichment claims for damages in connection with overcharges by ASC for fuel adjustments. We also requested declaratory relief for the fuel adjustment provisions of the contract as well as with respect to ASC’s obligation to shuttle iron ore. On May 18, 2007, ASC filed its own action against Cliffs Sales Company and adding Northshore Mining Company and Oglebay Norton Marine Services Company, LLC, as parties. ASC requested declaratory relief stating that its fuel adjustment charges were proper and that it had no obligation to shuttle iron ore during the winter. ASC also requested damages in connection with an alleged anticipatory breach of the contract based on our breach of contract claims. Both cases were consolidated for purposes of discovery. On May 20, 2008, a jury returned a verdict in favor of Cliffs Sales Company with respect to overcharges for fuel adjustments. The jury awarded Cliffs Sales Company damages totaling $3.7 million. It was determined that Oglebay Norton was responsible for $1.7 million of the damages and ASC was responsible for the remaining $2.0 million of damages to us. The jury stated that ASC could only charge an additional half cent fuel surcharge on shuttles to a blast furnace ore dock in Cleveland, Ohio when the ore was delivered to Cleveland Bulk Terminal by a non-ASC vessel. The jury found against Cliffs Sales Company finding that ASC was not obligated to provide winter shuttle service. Cliffs Sales Company filed a motion for the payment of interest on the amounts due to Cliffs Sales Company, as well as for our costs for trying. ASC and Oglebay Norton’s motions for new trial and for judgment as a matter of law were denied. ASC and Oglebay Norton have both agreed not to file an appeal. In the fourth quarter of 2008, we recorded and received payment for the $3.7 million of damages.

ArcelorMittal Arbitrations.    On March 18, 2008, ArcelorMittal filed two demands for arbitration with the AAA with respect to the March 1, 2007 Umbrella Agreement between ArcelorMittal and some of our operations. In one demand for arbitration, ArcelorMittal alleged that we had breached the Umbrella Agreement by refusing to honor ArcelorMittal’s attempt to revise its 2008 nomination for an additional 1,450,000 gross tons of iron ore pellets for export to ArcelorMittal facilities located outside of the United States. In the other demand for arbitration, ArcelorMittal requested a ruling from the AAA that, under the terms of the Umbrella Agreement, ArcelorMittal may transfer iron ore pellets purchased in 2009 and 2010 under the Umbrella Agreement to any iron and steel making facility owned directly or indirectly by Mittal Steel Company N.V.

On December 23, 2008, the arbitration panel ruled on both arbitrations. The arbitration panel ruled in our favor in the first arbitration, ruling that we did not breach the Umbrella Agreement with respect to ArcelorMittal’s attempt to revise their 2008 nomination. In the second arbitration, the arbitration panel ruled in ArcelorMittal’s favor, ruling that ArcelorMittal may transfer iron ore pellets purchased in 2009 and 2010 under the Umbrella Agreement to any iron and steel making facility owned directly or indirectly by Mittal Steel Company N.V.

Maritime Asbestos Litigation.    As previously disclosed, The Cleveland-Cliffs Iron Company and/or The Cleveland-Cliffs Steamship Company have been named defendants in 484 actions brought from 1986 to date by former seamen in which the plaintiffs claim damages under federal law for illnesses allegedly suffered as the result of exposure to airborne asbestos fibers while serving as crew members aboard the vessels previously owned or managed by our entities until the mid-1980s. All of these actions have been consolidated into multidistrict proceedings in the Eastern District of Pennsylvania, whose docket now includes a total of over 30,000 maritime cases filed by seamen against ship-owners and other defendants. All of these cases have been dismissed without prejudice, but can be reinstated upon application by plaintiffs’ counsel. The claims against our entities are insured in amounts that vary by policy year; however, the manner in which these retentions will be applied remains uncertain. Our entities continue to vigorously contest these claims and have made no settlements on them.

M.M. Silta, Inc. v. Cleveland-Cliffs Inc et al.    In August 2006, M.M. Silta, Inc., or Silta, sued Cliffs and two of its subsidiaries, Cliffs Mining Company and Cliffs Erie, L.L.C., or Cliffs Erie, for breach of two separate contracts entered into between Silta and Cliffs Erie. Silta alleged that Cliffs Erie had breached both a reclamation services agreement, pursuant to which Silta recovered, screened and loaded recovered iron ore pellets, chips and fines from the ore yard at the former LTVSMC, and a breaker sales agreement, pursuant to which Silta purchased

 

41


Table of Contents

for scrap certain circuit breakers located in the processing plant at the former LTVSMC. This dispute went to trial in March 2008. On March 13, 2008, a jury ruled in favor of Cliffs in connection with the alleged breach of the reclamation services agreement and in favor of Silta on the alleged breach of the breaker sales agreement, awarding Silta $6.8 million. Cliffs filed a motion with the trial court for judgment as a matter of law and a motion for a new trial, both of which were denied by the trial court. A notice of appeal was filed, but no briefs have been filed to date.

Northshore Air Permit Matters.    On December 16, 2006, Northshore submitted an application to the MPCA for an administrative amendment to its air pollution operating permit. The proposed amendment requested the deletion of a term in the air permit that was derived from a court case brought against the Silver Bay taconite operations in 1972. The permit term incorporated elements of the court-ordered requirement to reduce fiber emissions to below a medically significant level by installing controls that would be deemed adequate if the fiber levels in Silver Bay were below those of a “control city such as St. Paul”. We requested deletion of this “control city” permit requirement on the grounds that the court-ordered requirements had been satisfied more than 20 years ago and should no longer be included in the permit. The MPCA denied our application on February 23, 2007. We appealed the denial to the Minnesota Court of Appeals. The court of appeals ruled in MPCA’s favor. Subsequent to the court of appeals’ ruling, Northshore filed a major permit amendment on August 28, 2008 to remove the control city requirement from its permit. The permit amendment is currently pending.

Subsequent to the filing of the major permit amendment, the MPCA alleged that Northshore was in violation of the control city standard based on new data that the MPCA collected showing that current fiber levels in St. Paul were lower than in Silver Bay for a period in 2007. Northshore filed a motion with the U.S. District Court for the District of Minnesota to re-open the original Reserve Mining case, requesting that the court declare the control city standard satisfied and the court’s injunction voided, or if the control city standard remained in effect, clarify that it was a fixed standard set at the 1980 level rather than a moving standard, referred to as the federal suit. Shortly thereafter, the Save Lake Superior Association and the Sierra Club filed a lawsuit in U.S. District Court for the District of Minnesota with respect to alleged violations of the control city standard, referred to as the citizens’ suit. On September 20, 2007, the court granted Northshore’s motion to stay the citizen’s suit pending resolution of the federal suit. A joint stipulation for dismissal with prejudice of the citizens’ suit is pending before the court.

The court entered an order in the federal suit on December 21, 2007, concluding that the 1975 federal court injunction from the case no longer had any force or effect. However, the court’s order also stated that the control city standard was a state permit requirement that can only be addressed in state court. While the determination that the 1975 federal injunction no longer has any effect is favorable, Northshore is currently analyzing the implications of the federal court order with respect to Northshore’s operating permit and pending state appeal. On February 19, 2008, Northshore filed an appeal of certain aspects of the federal court’s order.

On July 28, 2008, the MPCA issued a NOV to Northshore alleging violations related to the control city standard for the period of March 2006 through October 2007, specifically with respect to MPCA’s interpretation of the control city standard’s emission limits and related monitoring and reporting requirements. The NOV states that Northshore has been in compliance with MPCA’s interpretation of the standard since October 2007, but requires corrective actions relating to operating and maintaining facilities of treatment and control to remain in compliance. Although the NOV does not seek civil penalties, it contains various requests for information and reserves the right for MPCA to take further action. Northshore disputes the allegations contained in the NOV and is currently assessing its legal and administrative options.

Northshore filed a major permit amendment on August 28, 2008 requesting the removal of all fiber-related provisions from Northshore’s air permit and proposing that Northshore install additional particulate controls. MPCA issued a “Findings of Fact, Conclusions of Law and Order” on November 25, 2008 declaring that Northshore’s request to remove the “Control City Standard” from its permit constitutes a “project” for which an EAW must be completed. MPCA also stated that it was ceasing all other work on the permit, including its own efforts to create a replacement standard, until the environmental review process was complete. Northshore had 30 days from the date it received the MPCA’s Order in which to challenge these determinations through a Declaratory Judgment, which it has done.

 

42


Table of Contents

Additionally, in October 2008, Northshore received the final results of the International Symposium on the Health Hazard Evaluation of Fibrous Particles Associated with Taconite and the Adjacent Duluth Complex. The peer-reviewed study concluded that there are no significant health effects related to fibers from Northshore.

Northshore filed an action to challenge the MPCA’s requirement for an EAW in Minnesota State District Court, which is currently pending. If either our appeal is unsuccessful or if we are unable to negotiate an acceptable compliance schedule, Northshore could be subject to future enforcement actions with respect to its Title V operating permit if we are unable to meet the permit requirements as interpreted by MPCA.

Additionally, as part of Northshore’s permitting of the restart of Furnace 5, Northshore is required to certify compliance with air emission standards within 180 days of operation. During the scheduled compliance testing for Furnace 5, Northshore experienced abnormal operating difficulties and was thereby unable to certify compliance. Northshore received a Notice of Noncompliance from MPCA on December 18, 2008 indicating it considers the facility out of compliance with the testing schedule and reserves the right to enforcement, while asking for additional explanation as to the related causes. Due to changes in market demand, Furnace 5 has been idled. Northshore expects that upon restart it will demonstrate compliance with the required limits and will perform retesting as soon as Furnace 5 returns to normal operating conditions. Accordingly, at that time, Northshore will take appropriate steps to establish compliance with MPCA.

Republic Arbitration.    On October 1, 2006, we entered into an agreement for the sale of pellets with Republic Engineered Products, Inc. (“Republic”). Pursuant to that agreement Republic was required to purchase a percentage of its iron ore requirements from us. Republic is required to provide us with a firm nomination by a certain date each year. As of the end of 2008 Republic had failed to take delivery and pay for a portion of the gross tons remaining from its 2008 nomination. After several failed attempts at negotiating a workout agreement, we filed a Demand for Arbitration on February 2, 2009 for a total of $30.7 million plus interest, commencing December 31, 2008.

The Rio Tinto Mine Site.    The Rio Tinto Mine Site is a historic underground copper mine located near Mountain City, Nevada, where tailings were placed in Mill Creek, a tributary to the Owyhee River. Site investigation and remediation work is being conducted in accordance with a Consent Order between the Nevada DEP and the RTWG composed of Cliffs, Atlantic Richfield Company, Teck Cominco American Incorporated, and E. I. du Pont de Nemours and Company. The Consent Order provides for technical review by the U.S. Department of the Interior Bureau of Indian Affairs, the U.S. Fish & Wildlife Service, U.S. Department of Agriculture Forest Service, the NDEP and the Shoshone-Paiute Tribes of the Duck Valley Reservation (collectively, “Rio Tinto Trustees”). The Consent Order is currently projected to continue with the objective of supporting the selection of the final remedy for the site. Costs are shared pursuant to the terms of a Participation Agreement between the parties of the RTWG, who have reserved the right to renegotiate any future participation or cost sharing following the completion of the Consent Order.

The Rio Tinto Trustees have made available for public comment their plans for the assessment of NRD. The RTWG commented on the plans and also are in discussions with the Rio Tinto Trustees informally about those plans. The notice of plan availability is a step in the damage assessment process. The studies presented in the plan may lead to a NRD claim under CERCLA. There is no monetized NRD claim at this time.

During 2006, the focus of the RTWG was on development of alternatives for remediation of the mine site. A draft of an alternatives study was reviewed with NDEP, the EPA and the Rio Tinto Trustees and the alternatives have essentially been reduced to the following: (1) tailings stabilization and long-term water treatment; and (2) removal of the tailings. As of December 31, 2008, the estimated costs of the available remediation alternatives currently range from approximately $10.0 million to $30.5 million. In recognition of the potential for an NRD claim, the parties are actively pursuing a global settlement that would include the EPA and encompass both the remedial action and the NRD issues. In 2008, the RTWG parties met for formal mediation on two occasions to resolve differences over the allocation of any negotiated remedy. The mediation resulted in substantial progress, and the members of the RTWG are still negotiating an allocation. Additionally, the RTWG and RTAG met most recently in December 2008 to discuss appropriate terms for a global settlement based on the latest investigation results. While a global settlement has not been finalized, we expect an agreement will be reached in 2009. We have increased our reserve most recently in 2008 by $5.2 million to reflect revised cleanup

 

43


Table of Contents

estimates and cost allocation associated with our anticipated share of the eventual remediation costs based on a consideration of the various remedial measures and related cost estimates The expense was included in Selling, general and administrative expenses on the Statements of Consolidated Operations.

United Taconite Air Emissions Matter.    On March 27, 2008, United Taconite received a DSA from the MPCA alleging various air emissions violations of the facility’s air permit limit conditions, reporting and testing requirements. The allegations generally stem from procedures put in place prior to 2004 when Cliffs first acquired its interest in the mine. The DSA requires the facility to install continuous emissions monitoring, evaluate compliance procedures, submit a plan to implement procedures to eliminate air deviations during the relevant time period, and proposes a civil penalty in an amount to be determined. While United Taconite does not agree with MPCA’s allegations, United Taconite and the MPCA continue discussions on the matter with the intent of working toward a mutual resolution.

Wabush Litigation.    We have been named, along with two of our wholly owned subsidiaries, Cliffs Mining Company and Wabush Iron Co. Limited, as defendants, along with U. S. Steel Canada Inc. (formerly Stelco Inc.), HLE Mining Limited Partnership and HLE Mining GP Inc. (collectively, “U. S. Steel”), in an action brought before the Ontario Superior Court of Justice by Dofasco. The action pertains to a contemplated transaction whereby Dofasco and/or certain of its affiliates would purchase our ownership interests and those of U. S. Steel in Wabush. After six months of negotiations with no definitive agreements reached, both we and U. S. Steel determined to withdraw from negotiations and retain our respective ownership interests in Wabush. Notice of the withdrawal was delivered to Dofasco on March 3, 2008.

On March 20, 2008, Dofasco commenced this action against both Cliffs and U.S. Steel in the Ontario Superior Court of Justice. Dofasco’s statement of claim demands specific performance of an alleged binding contract for Cliffs and U.S. Steel to sell their respective interests in Wabush with equitable compensation in the amount of C$427 million or, in the alternative, general damages in the amount of C$1.8 billion. On May 14, 2008 U.S. Steel filed a Notice of Motion to dismiss the action. We filed an identical Notice of Motion on May 15, 2008. A two day hearing was held on our respective motions on June 23 and 24, 2008. On November 5, 2008, the court ruled on both motions, granting U.S. Steel’s motion and denying ours. We filed a Notice of Motion seeking leave to appeal the court’s decision on November 11, 2008. Dofasco did not appeal the dismissal of U.S. Steel from the litigation. Oral argument on our Notice of Motion seeking leave to appeal has been scheduled for May 27, 2009. We strongly disagree with Dofasco’s allegations and intend to defend this case vigorously.

West Virginia Flood Litigation.    As of February 2008, Cliffs’ Pinnacle Mining Company has been named as a defendant in six lawsuits brought against over 60 defendants who were allegedly involved in land disturbing activities, primarily mining or logging, in Wyoming County, West Virginia. In each case the plaintiffs allege that these activities in Wyoming County resulted in flooding on or after July 8, 2001. The plaintiffs seek a permanent injunction and unstated personal and property damages under a number of legal theories. We are currently investigating these cases. We intend to defend these cases vigorously.

 

44


Table of Contents

Item 4.    Submission of Matters to a Vote of Security Holders.

Control Share Acquisition Special Meeting

On August 14, 2008, we received from Harbinger an “acquiring person statement”. Upon receipt of the acquiring person statement, we were required under Ohio law to convene a special meeting of shareholders for the sole purpose of considering and voting on whether to authorize pursuant to Section 1701.831 of the Ohio Revised Code, the control share acquisition of our common shares by Harbinger pursuant to the acquiring person statement. Harbinger’s proposal asked our shareholders to allow Harbinger to acquire more than one-fifth but less than one-third of our outstanding common shares.

Under Ohio law an affirmative vote of the holders of a majority of the portion of the voting power entitled to vote in the election of our directors (the “First Majority Approval”) and the affirmative vote of the holders of a majority of the portion of the voting power entitled to vote in the election of our directors, excluding the voting power of “interested shares” as defined in Chapter 1704 of the Ohio Revised Code (the “Second Majority Approval”) were required for the passage of the control share acquisition proposal.

The special meeting was held on October 3, 2008. At the special meeting 78,911,275 shares were represented in person or by proxy at the meeting, reflecting a total turnout of nearly 74 percent of all outstanding shares. With respect to the required First Majority Approval, 51,266,469, or 65 percent of the votes represented at the special meeting, voted against Harbinger’s proposal; 27,092,710 voted for and 552,096 abstained.

With respect to the required Second Majority Approval, or shares voted by holders other than Harbinger, its equity-swap counter parties and other “interested” shareholders, 46,292,356, or 82 percent of the eligible votes represented, voted against Harbinger’s proposal; 10,020,859 voted for and 380,561 abstained.

 

45


Table of Contents

PART II

 

Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities.

Stock Exchange Information

Our Common Shares (ticker symbol CLF) are listed on the New York Stock Exchange and the Chicago Stock Exchange.

Common Share Price Performance and Dividends

 

     2008    2007
     High    Low    Dividends    High    Low    Dividends

First Quarter

   $ 63.89    $ 38.63    $ 0.0875    $ 32.42    $ 23.00    $ 0.0625

Second Quarter

     121.95      57.32      0.0875      46.03      32.10      0.0625

Third Quarter

     118.10      42.16      0.0875      45.00      28.20      0.0625

Fourth Quarter

     53.30      13.73      0.0875      53.15      36.75      0.0625
                         

Year

     121.95      13.73    $ 0.3500      53.15      23.00    $ 0.2500
                         

At February 23, 2009, we had 1,520 shareholders of record.

Shareholder Return Performance

The following graph shows changes over the past five-year period in the value of $100 invested in: (1) Cliffs’ Common Shares; (2) S&P Stock Index; (3) S&P Steel Group Index; and (4) S&P Mid Cap 400 Index. The values of each investment are based on price change plus reinvestment of all dividends.

LOGO

 

46


Table of Contents
         Dec-2003   Dec-2004   Dec-2005   Dec-2006   Dec-2007   Dec-2008

CLIFFS NATURAL RESOURCES INC.

   Return%     103.83   71.91   10.29   110.09   -48.84
   Cum $   100.00   203.83   350.39   386.44   811.88   415.37

S&P 500 Index Total Returns

   Return%     10.87   4.89   15.79   5.42   -36.99
   Cum $   100.00   110.87   116.30   134.66   141.96   89.45

S&P 500 Steel Index

   Return%     59.88   21.91   77.12   20.15   -51.96
   Cum $   100.00   159.88   194.91   345.23   414.80   199.25

S&P MidCap 400 Index

   Return%     16.47   12.55   10.31   7.97   -36.24
   Cum $   100.00   116.47   131.09   144.61   156.14   99.55

Unregistered Sales of Equity Securities and Use of Proceeds

Pursuant to our VNQDC Plan, we sold a total of 300 common shares, par value $0.125 per share, of Cliffs Natural Resources Inc. (“Common Shares”) for an aggregate consideration of $7,273.77 to the Trustee of the Trust maintained under the VNQDC Plan. These sales were made in reliance on Rule 506 of Regulation D under the Securities Act of 1933 pursuant to an election made by three mine managers under the VNQDC Plan. Due to an administrative oversight, the sale of 18 Common Shares in August, 2008, is being reported in the fourth quarter. The following transactions occurred:

 

Date

   Shares (#)    Price per
Share ($)
   Total Purchase
Price ($)

08/5/2008

   18    95.00    1,709.91

11/17/2008

   36    19.73    710.28

11/15/2008

   246    19.73    256.49

Issuer Purchases of Equity Securities

 

Period

   Total
Number of
Shares
(or Units)
Purchased
    Average
Price Paid
per Share

(or Unit) $
   Total Number of
Shares
(or Units)
Purchased as
Part of Publicly
Announced
Plans or
Programs (1)
   Maximum
Number

(or Approximate
Dollar Value)

of Shares
(or Units) that
May Yet be
Purchased
Under the Plans
or Programs

October 1 — 31, 2008

   —       —      —      1,247,700

November 1 — 30, 2008

   654 (2)   23.24    —      1,247,700

December 1 — 31, 2008

   13,879 (3)   26.49    —      1,247,700
              

Total

   14,533     26.34    —      1,247,700

 

(1) On July 11, 2006, we received the approval by the Board of Directors to repurchase up to an aggregate of four million outstanding Common Shares. There were no repurchases in the fourth quarter under this program.

 

(2) On November 11, 2008, the Company acquired 654 Common Shares pursuant to a scheduled distribution election from a VNQDC Plan participant. The shares were repurchased by the Company to satisfy the tax withholding obligation of that participant pursuant to the distribution.

 

(3) On December 19, 2008, the Company acquired 13,879 Common Shares from an employee in connection with the lapsing of restrictions on certain shares. The shares were repurchased to satisfy the tax withholding obligations pursuant to the 1992 Incentive Equity Plan.

 

47


Table of Contents
Item 6. Selected Financial Data.

Summary of Financial and Other Statistical Data

Cliffs Natural Resources Inc. and Subsidiaries

 

    2008 (a)     2007 (b)     2006     2005 (a)     2004  

Financial data (in millions, except per share amounts and employees)

         

Revenue from product sales and services

  $ 3,609.1     $ 2,275.2     $ 1,921.7     $ 1,739.5     $ 1,203.1  

Cost of goods sold and operating expenses

    (2,449.4 )     (1,813.2 )     (1,507.7 )     (1,350.5 )     (1,053.6 )

Other operating expense

    (220.8 )     (80.4 )     (48.3 )     (32.5 )     (31.9 )
                                       

Operating income

    938.9       381.6       365.7       356.5       117.6  

Income from continuing operations

    515.8       269.8       279.8       273.2       320.2  

Income (loss) from discontinued operations

    —         0.2       0.3       (0.8 )     3.4  
                                       

Income before cumulative effect of accounting changes

    515.8       270.0       280.1       272.4       323.6  

Cumulative effect of accounting changes (c)

    —         —         —         5.2       —    
                                       

Net income

    515.8       270.0       280.1       277.6       323.6  

Preferred stock dividends

    (1.1 )     (5.2 )     (5.6 )     (5.6 )     (5.3 )
                                       

Income applicable to common shares

    514.7       264.8       274.5       272.0       318.3  

Earnings (loss) per common share — basic (d) (e) (f)

         

Continuing operations

    5.07       3.19       3.26       3.08       3.70  

Discontinued operations

    —         —         —         (0.01 )     0.04  

Cumulative effect of accounting changes

    —         —         —         0.06       —    
                                       

Earnings per common share

    5.07       3.19       3.26       3.13       3.74  

Earnings (loss) per common share — diluted (d) (e) (f)

         

Continuing operations

    4.76       2.57       2.60       2.46       2.92  

Discontinued operations

    —         —         —         (0.01 )     0.03  

Cumulative effect of accounting changes

    —         —         —         0.05       —    
                                       

Earnings per common share — diluted (d) (e) (f)

    4.76       2.57       2.60       2.50       2.95  

Total assets

    4,111.1       3,075.8       1,939.7       1,746.7       1,232.3  

Long-term obligations

    580.2       490.9       47.2       49.6       9.1  

Net cash from (used by) operating activities

    853.2       288.9       428.5       514.6       (141.4 )

Redeemable cumulative convertible perpetual preferred stock

    0.2       134.7       172.3       172.5       172.5  

Distributions to preferred shareholders cash dividends

    1.1       5.5       5.6       5.6       5.3  

Distributions to common shareholders cash dividends

         

- Per share (d) (e) (f)

    0.35       0.25       0.24       0.15       0.03  

- Total

    36.1       20.9       20.2       13.1       2.2  

Repurchases of common shares

    —         2.2       121.5       —         6.5  

Iron ore and coal production and sales statistics

         

(tons in millions - North America; tonnes in millions - Asia-Pacific)

         

Production tonnage - North American iron ore

    35.2       34.6       33.6       35.9       34.4  

- North American coal

    3.5       1.1       —         —         —    

- Asia-Pacific iron ore

    7.7       8.4       7.7       5.2       —    

Production tonnage — North American iron ore (Cliffs’ share)

    22.9       21.8       20.8       22.1       21.7  

Sales tonnage - North American iron ore

    22.7       22.3       20.4       22.3       22.6  

- North American coal

    3.2       1.2       —         —         —    

- Asia-Pacific iron ore

    7.8       8.1       7.4       4.9       —    

Common shares outstanding (millions) (d) (e)

         

- Average for year

    101.5       83.0       84.1       86.9       85.2  

- At year-end

    113.5       87.2       81.8       87.6       86.4  

 

48


Table of Contents

 

(a) On April 19, 2005, we completed the acquisition of 80.4 percent of Portman, an iron ore mining company in Australia. Results for 2005 include Portman’s results since the acquisition. On May 21, 2008, Portman authorized a tender offer to repurchase shares, and as a result, our ownership interest in Portman increased from 80.4 percent to 85.2 percent on June 24, 2008. On September 10, 2008, we announced an off-market takeover offer to acquire the remaining shares in Portman, which closed on November 3, 2008. We subsequently proceeded with a compulsory acquisition of the remaining shares and have full ownership of Portman as of December 31, 2008. Results for 2008 reflect the increase in our ownership of Portman since the date of each step acquisition.

 

(b) On July 31, 2007, we completed the acquisition of Cliffs North American Coal LLC (formerly PinnOak), a producer of high-quality, low-volatile metallurgical coal. Results for 2007 include PinnOak’s results since the acquisition.

 

(c) Effective January 1, 2005, we adopted Emerging Issues Task Force, or EITF, 04-6, “Accounting for Stripping Costs Incurred during Production in the Mining Industry”.

 

(d) On March 11, 2008, our board of directors declared a two-for-one stock split of our common shares. The record date for the stock split was May 1, 2008 with a distribution date of May 15, 2008. Accordingly, all common shares and per share amounts for all periods presented have been adjusted retroactively to reflect the stock split.

 

(e) On May 9, 2006, our board of directors approved a two-for-one stock split of our common shares. The record date for the stock split was June 15, 2006 with a distribution date of June 30, 2006. Accordingly, all common shares and per share amounts for all periods presented have been adjusted retroactively to reflect the stock split.

 

(f) On November 9, 2004, our board of directors approved a two-for-one stock split of our common shares. The record date for the stock split was December 15, 2004, with a distribution date of December 31, 2004. Accordingly, all common shares and per share amounts for all periods presented have been adjusted retroactively to reflect the stock split.

 

49


Table of Contents
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.

Overview

Cliffs Natural Resources Inc. traces its corporate history back to 1847. Today, we are an international mining and natural resources company. We are the largest producer of iron ore pellets in North America, a major supplier of direct-shipping lump and fines iron ore out of Australia, and a significant producer of metallurgical coal. Our company is organized according to product category and geographic location: North American Iron Ore, North American Coal, Asia Pacific Iron Ore, Asia Pacific Coal and Latin American Iron Ore.

In North America, we operate six iron ore mines in Michigan, Minnesota and Eastern Canada, and two coking coal mine complexes located in West Virginia and Alabama. Our Asia Pacific operations include full ownership of Portman, which is comprised of two iron ore mining complexes in Western Australia, serving the Asian iron ore markets with direct-shipping fines and lump ore, and a 45 percent economic interest in Sonoma, a coking and thermal coal mine located in Queensland, Australia. In Latin America, we have a 30 percent interest in Amapá, a Brazilian iron ore project, as well as a number of smaller greenfield projects not yet in production.

Over recent years, we have been executing a strategy designed to achieve scale in the mining industry and focused on serving the world’s largest and fastest growing steel markets.

Safety remains the No. 1 priority within our Company. Our North American Iron Ore segment had a total reportable incident rate, as defined by MSHA, of 2.29 in 2008, compared with the prior year result of 1.93. Our North American Coal operations had a total reportable incident rate of 8.44 compared with a rate of 6.66 in 2007. Although the total reportable injury rates in North America were slightly unfavorable, other recognized safety measures showed marked improvements from 2007. Our North American Iron Ore segment finished the year with a 13 percent decline in the all injury frequency rate from 2007, and our North American Coal segment recorded a 20 percent decline in injury severity rates from the prior year. We have developed close collaboration between our North American segments to drive further improvements in our safety results.

At our Asia Pacific Iron Ore operations, Koolyanobbing’s total reportable incident rate for 2008 was 2.50, compared with the 2007 result of 0.83. Cockatoo Island reported a total reportable incident rate of 6.12 in 2008 compared with 2.61 in 2007. Asia Pacific Iron Ore safety statistics include employees and contractors.

We continued to deliver strong financial performance in 2008 while continuing to execute on our strategic plan, which includes consolidating minority positions, exploring external and organic growth opportunities, and striving for operational excellence in each of our business segments. Consolidated revenues for 2008 increased to $3.6 billion, with net income of $4.76 per diluted share. This compares with revenues of $2.3 billion and net income of $2.57 per diluted share in 2007.

Global crude steel growth, a significant driver of our business was down approximately two percent from 2007 with supply and demand of steel raw materials extremely tight. Worldwide demand for metallurgical coal increased throughout most of 2008 as supply-side constraints, including flooding in the Bowen Basin, a major coal producing area of Australia, port congestion, and production problems at large mines in the United States continue to place upward pressure on pricing.

However, the current volatility and uncertainty in global markets, coupled with the slowdown in the world’s major economies, has had a significant impact on commodity prices. The mining industry has seen a reduction in high cost operations, and the credit environment is expected to limit the funding and expansion capabilities of many mining companies. Based on these economic conditions, we continue to evaluate and assess our capital expenditures, in order to ensure we are positioned to face the challenges and uncertainties associated with the current environment. We reacted quickly to align production with lower demand for steel and steelmaking materials entering the fourth quarter of 2008. While remaining attuned to current macroeconomic challenges, we continue to seek low-risk expansion opportunities and, at the same time, position ourselves to weather any difficult times that lie ahead.

Results in 2008 were also impacted by considerable volatility in foreign currency exchange rates, which resulted in significant changes in the fair value of our derivative instruments. In particular, we use derivative financial instruments to reduce the volatility attributable to changes in Australian and United States currency

 

50


Table of Contents

fluctuations related to our operations in Asia Pacific. We recorded unrealized losses of $188.2 million in our Statement of Consolidated Operations in 2008 as a result of substantial declines in the spot rates related to the depreciation of the Australian dollar relative to the United States dollar during the year.

We are engaged with expanding our leadership position in the industry by focusing on high product quality, technical excellence, superior relationships with our customers and partners and improved operational efficiency through cost saving initiatives. We operate a fully-equipped research and development facility in Ishpeming, Michigan. Our research and development group is staffed with experienced engineers and scientists and is organized to support the geological interpretation, process mineralogy, mine engineering, mineral processing, pyrometallurgy, advanced process control and analytical service disciplines. Our research and development group is also utilized by iron ore pellet customers for laboratory testing and simulation of blast furnace conditions.

Segments

We organize our business according to product category and geographic location: North American Iron Ore, North American Coal, Asia Pacific Iron Ore, Asia Pacific Coal and Latin American Iron Ore. The North American Iron Ore segment is comprised of our interests in six North American mines that provide iron ore to the integrated steel industry. The North American Coal segment is comprised of our two North American coking coal mining complexes that provide metallurgical coal to the integrated steel industry. The Asia Pacific Iron Ore segment, which is comprised of Portman, is located in Western Australia and provides iron ore to steel producers in China and Japan. There are no intersegment revenues.

The Asia Pacific Coal operating segment is comprised of our 45 percent economic interest in Sonoma, located in Queensland, Australia, which is in the early stages of production. The Latin American Iron Ore operating segment is comprised of our 30 percent Amapá interest in Brazil, which is also in the early stages of production. As a result, the Asia Pacific Coal and Latin American Iron Ore operating segments do not meet reportable segment disclosure requirements and therefore are not separately reported.

All North American business segments are headquartered in Cleveland, Ohio. Offices in Duluth, Minnesota, have shared services groups supporting the North American business segments. Our Technology Group is located in Ishpeming, Michigan. Our Asia Pacific headquarters are located in Perth, Australia, and our Latin American headquarters are located in Rio de Janeiro, Brazil. Cliffs International Mineração Brasil, Ltda and Cliffs Natural Resources Pty Limited provide technical and administrative support for our assets in Latin America and Australia, respectively, as well as new business development services in these regions. See NOTE 6 — SEGMENT REPORTING for further information.

Growth Strategy and Strategic Transactions

We expect to grow our business and presence as an international mining and natural resources company by expanding both geographically and through the minerals that we mine and market in order to achieve scale in our industry. Our growth domestically, combined with our investments in Australia and Latin America, as well as acquisitions in minerals outside of iron ore, such as coal, illustrate the execution of this growth strategy. While ever-conscious of the challenges associated with the current economic environment, we continue to identify low-risk opportunities to grow and at the same time position ourselves to address the uncertainties that lie ahead. In 2008, we continued our strategic growth and transformation to an international mining company through the following acquisitions, partnerships and re-branding:

 

   

Portman Share Repurchase and Off-Market Takeover

 

   

Investment in AusQuest

 

   

United Taconite Purchase

 

   

Michigan Expansion Projects

 

   

Investment in Golden West

 

   

Change in Corporate Name to Cliffs Natural Resources Inc.

 

51


Table of Contents

Refer to Recent Developments within Item 1 — Business, for additional information regarding each of these strategic transactions.

Other Significant Developments

Ratification of New Labor Agreement

Hourly employees at our Michigan and Minnesota iron ore mining operations, excluding Northshore, are represented by the USW. On October 6, 2008, the USW ratified a new four-year labor contract, which replaces the labor agreement that expired on September 1, 2008. The new agreement covers approximately 2,300 USW-represented workers at our Empire and Tilden mines in Michigan, and our United Taconite and Hibbing mines in Minnesota.

Termination of Merger with Alpha Natural Resources

On November 17, 2008, we announced the termination of the definitive merger agreement with Alpha Natural Resources, Inc., under which we would have acquired all outstanding shares of Alpha, as previously announced on July 16, 2008. Both our Board of Directors and Alpha’s Board of Directors made the decision after considering various issues, including the current macroeconomic environment, uncertainty in the steel industry, shareholder dynamics, and the risks and costs of potential litigation. Considering these issues, each board determined that termination of the merger agreement was in the best interest of its equity holders.

Results of Operations — Consolidated

2008 Compared to 2007

For the year ended December 31, 2008, consolidated revenues increased to $3.6 billion, with net income of $4.76 per diluted share. This compares with revenues of $2.3 billion and net income of $2.57 per diluted share in 2007.

Revenue from Product Sales and Services

Sales revenue in 2008 increased $1.3 billion, or 59 percent, compared with 2007. The increase in sales revenue was primarily due to higher sales prices combined with increases in sales volume. Higher sales volume in 2008 was primarily due to increased demand and commitments under our long-term pellet sales agreements, increased spot sales, and customer plant outages during the prior year. However, this increase was partially offset by declines in sales volumes to customers during the fourth quarter of 2008 as a result of the current volatility and uncertainty in global markets, which has led to production slowdowns in the steel industry. In addition, sales volume was negatively impacted throughout the year by adverse mining conditions and production delays at our North American Coal segment. Results for North American Coal in 2007 represent five months of operations since the July 31, 2007 acquisition.

Revenues related to our North American Iron Ore segment increased approximately $624.2 million over the prior year primarily as a result of higher steel prices, renegotiated and new long-term supply agreements with certain customers, which were negotiated at world pellet prices, and other contractual price adjustment factors. In 2008, revenue also included $225.5 million related to the supplemental steel payments compared with $98.3 million in 2007. In addition, the Australian benchmark prices for lump and fines settled at increases of 97 percent and 80 percent in 2008, thereby resulting in higher revenues from our Asia Pacific Iron Ore segment compared with prior year.

Cost of Goods Sold

Cost of goods sold was $2.4 billion in 2008, an increase of $636.2 million, or 35 percent compared with 2007. The increase in cost of goods sold in 2008 was primarily due to higher costs of production, higher royalty fees related to the increases in pellet pricing, and increased maintenance costs associated with the Michigan expansion project and major furnace repairs at Empire and United Taconite during the first quarter. In 2008, we continued to be challenged with adverse geological conditions across the mines at our North American Coal

 

52


Table of Contents

segment and delays in delivery of new capital equipment, which contributed to overall equipment performance and availability issues, thereby resulting in production delays and increased costs in all operations. Results for North American Coal in 2007 represent five months of operations since the July 31, 2007 acquisition. Costs were also negatively impacted in 2008 by approximately $1.6 million related to unfavorable foreign exchange rates as well as higher fuel and energy costs primarily related to our North American and Asia Pacific iron ore operations, which together increased $42.5 million compared with 2007. In addition, the impact of the United Taconite and Portman step acquisitions also contributed to the increase from prior year.

Other Operating Income (Expense)

Following is a summary of other operating income (expense) for 2008 and 2007:

 

     (In Millions)  
     2008     2007     Variance
Favorable/
(Unfavorable)
 

Casualty recoveries

   $ 10.5     $ 3.2     $ 7.3  

Royalties and management fee revenue

     21.7       14.5       7.2  

Selling, general and administrative expenses

     (188.6 )     (114.2 )     (74.4 )

Terminated acquisition costs

     (90.1 )     —         (90.1 )

Gain on sale of other assets — net

     22.8       18.4       4.4  

Miscellaneous — net

     2.9       (2.3 )     5.2  
                        
   $ (220.8 )   $ (80.4 )   $ (140.4 )
                        

The increase in selling, general and administrative expense of $74.4 million in 2008 compared with 2007 is primarily a result of $20.2 million in higher share-based and incentive compensation, and higher wages and benefits related to an increase in the number of employees. We also incurred approximately $2.2 million in corporate severance costs during the fourth quarter of 2008. Outside professional service and legal fees associated with the expansion of our business increased approximately $15.1 million in 2008. Expenses at our Asia Pacific Iron Ore segment were $5.7 million higher than the prior year, reflecting higher employment costs and outside professional services to support business development and improvement efforts. The current year was also impacted by additional corporate development activities in Latin America, Asia Pacific, and other general business development, resulting in an increase of approximately $13.0 million. In addition, 2008 includes a full year of selling, general and administrative expenses from our North American Coal segment, compared with five months in 2007 based on a July 31, 2007 date of acquisition, resulting in an increase of $5.1 million. Selling, general and administrative expense in 2008 was also impacted by a charge in the first quarter of approximately $6.8 million in connection with a legal case as well as $4.3 million related to our interest in Sonoma acquired in 2007.

On November 17, 2008, we announced the termination of the definitive merger agreement with Alpha Natural Resources, Inc., under which we would have acquired all outstanding shares of Alpha, as previously announced on July 16, 2008. Both our Board of Directors and Alpha’s Board of Directors made the decision after considering various issues, including the current macroeconomic environment, uncertainty in the steel industry, shareholder dynamics, and the risks and costs of potential litigation. Considering these issues, each board determined that termination of the merger agreement was in the best interest of its equity holders. Under the terms of the settlement agreement, we were required to pay Alpha a $70 million termination fee, which was financed through our revolving credit facility and paid in November 2008. As a result, $90.1 million in termination fees and associated acquisition costs were expensed in the fourth quarter of 2008 upon termination of the definitive merger agreement.

The gain on sale of other assets of $22.8 million in 2008 primarily relates to the sale of our wholly-owned subsidiary, Cliffs Synfuel Corp. (“Synfuel”), which was completed on June 4, 2008. Under the agreement, Oil Shale Exploration Company-Skyline, LLC acquired 100 percent of Synfuel for $24 million. As additional consideration for the stock, a perpetual nonparticipating royalty interest was granted initially equal to $0.02 per barrel of shale oil and $0.01 per barrel of shale oil produced from lands covered by existing State of Utah oil

 

53


Table of Contents

shale leases, plus 25 percent of royalty payments from conventional oil and gas operations. We recorded a gain of $19 million in the second quarter of 2008 upon completion of the transaction. The prior year gain on sale of assets of $18.4 million primarily reflected the fourth quarter 2007 gain on the sale of portions of the former LTVSMC site. The sale included cash proceeds of approximately $18 million.

The increase in casualty recoveries in 2008 compared with 2007 is primarily attributable to a $9.2 million insurance recovery recognized in the current year related to a 2006 electrical explosion at our United Taconite facility.

Other income (expense)

Following is a summary of other income (expense) for 2008 and 2007:

 

     (In Millions)  
     2008     2007     Variance
Favorable/
(Unfavorable)
 

Changes in fair value of derivative instruments, net

   $ (188.2 )   $ —       $ (188.2 )

Impairment of investments

     (25.1 )     —         (25.1 )

Interest income

     26.2       20.0       6.2  

Interest expense

     (39.8 )     (22.6 )     (17.2 )

Other — net

     4.3       1.7       2.6  
                        
   $ (222.6 )   $ (0.9 )   $ (221.7 )
                        

The impact of changes in the fair value of derivative instruments on our Statement of Consolidated Operations in 2008 primarily relates to the de-designation of the Portman cash flow hedges for accounting purposes. We are required to record on our Statements of Consolidated Financial Position the market value of our open derivative positions which do not qualify for hedge accounting treatment. Previously, when the derivative instruments were designated as cash flow hedges, the mark-to-market adjustments related to the effective portions of the hedges were recorded as a component of Other comprehensive income. Upon de-designation of the cash flow hedges, effective July 1, 2008, the instruments are prospectively marked to fair value, and the adjustments resulting from changes in the market value of these derivative instruments are recorded as an unrealized gain or loss each reporting period. The following table represents our foreign currency derivative contract position as of December 31, 2008:

 

     ($ in Millions)  

Contract Maturity

   Notional Amount    Weighted Average
Exchange Rate
   Spot Rate    Fair Value  

Contract Portfolio (excluding AUD Call Options) (1):

           

Contracts expiring in the next 12 months

   $ 537.0    0.81    0.69    $ (77.5 )

Contracts expiring in the next 13 to 24 months

     202.5    0.74    0.69      (25.5 )

Contracts expiring in the next 25 to 36 months

     55.0    0.77    0.69      (8.8 )
                     

Total

   $ 794.5    0.79    0.69    $ (111.8 )
                     

AUD Call Options (2)

           

Contracts expiring in the next 12 months

   $ 33.0    0.87    0.69    $ 0.3  

Contracts expiring in the next 13 to 24 months

     41.5    0.90    0.69      0.6  

Contracts expiring in the next 25 to 36 months

     —      —      —        —    
                     

Total

   $ 74.5    0.88    0.69    $ 0.9  
                     

Total Hedge Contract Portfolio

   $ 869.0          $ (110.9 )
                     

 

(1) Includes collar options, convertible collar options and forward exchange contracts.

 

(2) AUD call options are excluded from the weighted average exchange rate used for the remainder of the contract portfolio due to the unlimited downside participation associated with these instruments.

 

54


Table of Contents

The significant unrealized mark-to-market fluctuations are related to the spot rate of A$0.69 as of December 31, 2008, which significantly decreased from the spot rate of A$0.96 as of June 30, 2008 upon de-designation of the hedges. The changes in the spot rates are correlated to the depreciation of the Australian dollar relative to the United States dollar during the period. In addition, the amount of outstanding contracts in Portman’s foreign exchange hedge book significantly increased from $559.2 million at June 30, 2008 to approximately $869.0 million as of December 31, 2008, primarily as a result of higher sales prices in the current year partially offset by the expiration of contracts upon maturity.

In 2008, we recorded impairment charges of $25.1 million related to declines in the fair value of our available-for-sale securities which we concluded were other than temporary. As of December 31, 2008, our investments in PolyMet and Golden West had fair values totaling $6.2 million and $4.7 million, respectively, compared with a cost of $14.2 million and $21.8 million, respectively. The metals and mining industry and our investees are susceptible to changes in the U.S. and global economies and the industries of their customers. Their principal customers are part of the global steel industry, and their businesses have been adversely affected by the slowdown of the global economy, particularly during the last quarter of 2008 when our investments became impaired. The severity of the impairments in relation to the carrying amounts of the individual investments is consistent with the macroeconomic market and industry developments. However, we have evaluated the near-term prospects of the issuers in relation to the severity and rapid decline in the fair value of each of these investments, and based upon that evaluation, we could not reasonably assert that the impairment period would be temporary primarily as a result of the global economic crisis and the corresponding uncertainties in the market.

The increase in interest income in 2008 compared with 2007 is attributable to additional cash and investments held by Portman during the year coupled with higher overall average returns. However, investment returns were lower in the fourth quarter of 2008 as a result of market declines. Higher interest expense in 2008 reflected increased borrowings under our senior notes and interest accretion for the deferred payment related to the PinnOak acquisition. See NOTE 5 — DEBT AND CREDIT FACILITIES for further information.

Income Taxes

Our tax provision for the year ended December 31, 2008 and 2007 was $144.2 million and $84.1 million, respectively. The increase is primarily attributable to higher pre-tax book income partially offset by a decrease in our effective tax rate. Our effective tax rate for the year ended December 31, 2008 and 2007 was 20.1 percent and 22.1 percent, respectively. The 2.0 percent decrease is primarily attributable to increased percentage depletion and release of the valuation allowance related to foreign net operating losses. See NOTE 10 — INCOME TAXES for further information.

Minority Interest

Minority interest in consolidated income increased $5.6 million, or 36 percent, for the year ended December 31, 2008. The increase is primarily driven by a corresponding increase in the operating results of Portman, a consolidated subsidiary in which we owned approximately 80.4 percent in 2007 and throughout the first half of 2008. In June 2008, we acquired an additional 4.8 percent interest in Portman through a share repurchase program offered by Portman. We subsequently made an off-market offer to purchase the outstanding shares and proceeded with a compulsory acquisition of the remaining shares to obtain full ownership of Portman in the fourth quarter of 2008. In addition, effective July 1, 2008, we acquired the remaining 30 percent interest in United Taconite. Upon consummation of the purchase, our ownership interest increased from 70 percent to 100 percent. Each of these transactions constituted a step acquisition of a non-controlling interest, thereby reducing minority interest in consolidated income on a prospective basis. In accordance with SFAS 141, Business Combinations, we accounted for the acquisition of the minority interests by the purchase method. As a result of each step acquisition, the then historical cost basis of the minority interest balance was reduced to the extent of the percentage interest sold, and the increased ownership obtained was accounted for by increasing the entity’s basis from historical cost to fair value for the portion of the assets acquired and liabilities assumed based on the additional ownership acquired.

 

55


Table of Contents

Equity Loss in Ventures

The equity loss in ventures for the year ended December 31, 2008 of $35.1 million primarily represents our share of the operating results of our equity method investment in Amapá. Such results mainly consist of start-up and operating losses of $45.6 million, which includes operating losses from Amapá’s railroad of $5.8 million. The loss was partially offset by foreign currency hedge gains of $10.5 million. This compares with a loss of $11.2 million in 2007, comprised of $7.2 million in pre-production costs and $4.0 million of operating losses from the railroad. The negative operating results in the current year are mainly due to slower than anticipated ramp-up of operations and product yields.

We evaluate the loss in value of our equity method investments each reporting period to determine whether the loss is other than temporary. Based upon the increase in equity losses resulting from start-up costs and production delays in 2008, we determined that indicators of impairment may exist relative to our investment in Amapá. Accordingly, we performed an assessment of the potential impairment of our investment during the fourth quarter of 2008 using a discounted cash flow model to determine the fair value of our investment in relation to its carrying value as of December 31, 2008. Based upon the analysis performed, we have determined that our investment is not impaired. In addition, we will continue to evaluate the results of our investment on a quarterly basis while monitoring the declines in pricing and the potential impact on our business as a result of the recent economic downturn in the industry.

2007 Compared to 2006

For the year ended December 31, 2007, consolidated revenues increased to $2.3 billion, with net income of $2.57 per diluted share. This compared with revenues of $1.9 billion and net income of $2.60 per diluted share in 2006.

Revenue from Product Sales and Services

Sales revenue in 2007 increased $353.5 million, or 18 percent, compared with 2006. The increase in sales revenue was primarily due to higher sales prices combined with increases in sales volume. In relation to our North American Iron Ore segment, sales volume in 2007 included 1.5 million tons of pellets purchased and paid for by customers at year-end under take-or-pay provisions of existing long-term supply agreements. First half shipments in 2007 included 1.2 million tons of pellets purchased in upper Great Lakes stockpiles and paid for in 2006. Revenue recognition related to the December 2006 stockpile transaction totaling $62.6 million was deferred until the product was delivered in 2007. The completion of a two-million-tonne per annum expansion at Koolyanobbing in late 2006 also resulted in increased sales volume in 2007 related to our Asia Pacific Iron Ore segment.

Sales prices per-ton increased year over year in relation to our iron ore business both domestically and abroad, reflecting the effect of contractual base price increases, higher term supply agreement escalation factors including higher steel pricing, higher PPI and lag-year adjustments. In addition, 2007 included incremental revenue of $85.2 million related to our North American Coal segment acquired on July 31, 2007.

Cost of Goods Sold

Cost of goods sold was $1.8 billion in 2007, an increase of $305.5 million, or 20 percent compared with 2006. The increase in cost of goods sold and operating expenses primarily reflected higher volume in 2007. On a per-ton basis, cost of goods sold and operating expenses for our North American Iron Ore segment were flat in comparison to 2006, as a result of our strategic procurement, maintenance and other business improvement programs, as well as the implementation of Six Sigma and Lean Sigma. Costs were also negatively impacted in 2007 by unfavorable foreign exchange rates as well as changeover costs associated with a new mining contractor at our Asia Pacific Iron Ore segment. In addition, cost of goods sold in 2007 included incremental expense of $116.9 million related to our North American Coal segment acquired on July 31, 2007.

 

56


Table of Contents

Other Operating Income (Expense)

Following is a summary of other operating income (expense) for 2007 and 2006:

 

     (In Millions)  
     2007     2006     Variance
Favorable/
(Unfavorable)
 

Casualty recoveries

   $ 3.2     $ —       $ 3.2  

Royalties and management fee revenue

     14.5       11.7       2.8  

Selling, general and administrative expenses

     (114.2 )     (72.4 )     (41.8 )

Gain on sale of other assets — net

     18.4       —         18.4  

Miscellaneous — net

     (2.3 )     12.4       (14.7 )
                        
   $ (80.4 )   $ (48.3 )   $ (32.1 )
                        

Selling, general and administrative expense of $114.2 million increased $41.8 million compared with the prior year, primarily reflecting higher employment costs related to our expanding business, including expenses at North American Coal and our Asia Pacific locations; increased outside professional service fees and higher legal fees.

Gain on sale of assets of $18.4 million primarily reflected the fourth quarter 2007 gain on the sale of portions of the former LTVSMC site. The sale included cash proceeds of approximately $18 million.

Miscellaneous-net expense of $2.3 million in 2007 increased $14.7 million compared with 2006, primarily reflecting increased mark-to-market hedging losses at our Asia Pacific Iron Ore business.

Other Income (Expense)

Following is a summary of other income (expense) for 2007 and 2006:

 

     (In Millions)  
     2007     2006     Variance
Favorable/
(Unfavorable)
 

Interest income

   $ 20.0     $ 17.2       2.8  

Interest expense

     (22.6 )     (5.3 )     (17.3 )

Other — net

     1.7       10.2       (8.5 )
                        
   $ (0.9 )   $ 22.1     $ (23.0 )
                        

Interest income of $20.0 million increased $2.8 million compared with the prior year, reflecting average higher cash and investment balances and higher average interest rates in our Asia Pacific iron ore business.

Interest expense of $22.6 million increased $17.3 million compared with the prior year, primarily reflecting borrowings from the credit facility to fund the acquisition of PinnOak.

Income Taxes

Income tax expense of $84.1 million in 2007 was $6.8 million lower than the comparable amount in 2006. The decrease was due to lower pre-tax income in 2007 and a lower effective tax rate. Our effective tax rate for the year ended December 31, 2007 and 2006 was 22.1 percent and 23.4 percent, respectively. The 1.3 percent decrease is attributable to lower pre-tax book income offset by increased percentage depletion netted with increased contingent foreign income taxes. See NOTE 10 — INCOME TAXES in Item 8 for further information.

Minority Interest

Minority interest decreased $1.5 million, or 9 percent from the prior year. Minority interest represented the 19.6 percent minority interest related to Asia Pacific Iron Ore earnings.

 

57


Table of Contents

Equity Loss in Ventures

The equity loss in ventures, $11.2 million, represented the results from the Company’s investment in Amapá, primarily pre-production costs, $7.2 million and operating losses from the railroad, $4.0 million.

Results of Operations — Segment Information

Our company is organized and managed according to product category and geographic location. Segment information reflects our strategic business units, which are organized to meet customer requirements and global competition. We evaluate segment performance based on sales margin, defined as revenues less cost of goods sold identifiable to each segment. This measure of operating performance is an effective measurement as we focus on reducing production costs throughout the Company.

2008 Compared to 2007

North American Iron Ore

Following is a summary of North American Iron Ore results for 2008 and 2007:

 

     (In Millions)  
                 Change due to        
     2008     2007     Sales
price and
rate
    Sales
volume
    Freight and
reimbursements
    Total
change
 

Revenues from product sales and services

   $ 2,369.6     $ 1,745.4     $ 596.1     $ 34.4     $ (6.3 )   $ 624.2  

Cost of goods sold and operating expense

     (1,565.3 )     (1,347.5 )     (199.0 )     (25.1 )     6.3       (217.8 )
                                                

Sales margin

   $ 804.3     $ 397.9     $ 397.1     $ 9.3     $ —       $ 406.4  
                                                

Sales tons

     22.7       22.3          

The increase in sales revenue in 2008 was primarily due to higher sales prices combined with an increase in sales volume. Revenue per ton increased 33.3 percent in the current year primarily as a result of higher steel prices, renegotiated and new long-term supply agreements with certain customers, which were negotiated at a time of higher world pellet prices, and other contractual price adjustment factors. In 2008, revenue included $225.5 million related to the supplemental steel payments compared with $98.3 million in 2007.

The comparison of sales volume between 2008 and 2007 shows a slight increase year over year. However, in 2007, certain of our customers purchased and paid for approximately 1.5 million tons of iron ore pellets in stockpiles at the end of the year in order to comply with the take-or-pay provisions of their existing long-term supply agreements. The customers requested via a fixed shipping schedule that we not ship the iron ore until the spring of 2008, when the Great Lakes waterways re-opened for shipping. We recognized revenue on the 1.5 million tons in 2007. The following represents a comparison of sales volume in 2008, 2007 and 2006 as if the impact of the stockpile sales were excluded from the period reported and instead recognized in the period shipped:

 

     (In Millions)
     Actual Sales
Tons
Recognized
   Cash Received /
Sales Tons Not
Recognized
    Pro Forma
Sales
Tons

2006

   20.3    1.2     21.5

2007

   22.3    (1.2 )   21.1

2008

   22.7    1.2     23.9

Absent the impact of the stockpile sales, the increase in sales volume in the current year is primarily due to increased demand during the first three quarters of 2008, commitments under our long-term pellet sales agreements, and customer plant outages during 2007. However, this increase was partially offset by declines in sales volumes to customers during the fourth quarter of 2008 as a result of the current volatility and uncertainty in global markets, which has led to production curtailments in the steel industry.

 

58


Table of Contents

The increase in 2008 revenue is also attributable to a $50.6 million favorable mark-to-market adjustment related to the unsold tons associated with our purchase of the remaining 30 percent interest in United Taconite. Refer to Derivative Financial Instruments within NOTE 1 — BUSINESS SUMMARY AND SIGNIFICANT ACCOUNTING POLICIES, of our consolidated financial statements for further information on the derivative instrument associated with the provisions of this purchase agreement.

The increase in cost of goods sold and operating expense in 2008 was primarily due to higher costs of production, higher royalty fees primarily related to the increases in pellet pricing, and increased maintenance costs associated with the Michigan expansion project. Fuel and energy costs increased $28.4 million compared with 2007. In addition, the impact of the United Taconite step acquisition also contributed to the increase year over year.

Production

Following is a summary of iron ore production tonnage for 2008 and 2007:

 

     (In Millions) (1)
     Company Share    Total

Mine

   2008    2007    2008    2007

Empire

   3.6    3.9    4.6    4.9

Tilden

   6.5    6.1    7.6    7.2

Hibbing

   1.9    1.7    8.2    7.4

Northshore

   5.5    5.2    5.5    5.2

United Taconite

   4.3    3.7    5.1    5.3

Wabush

   1.1    1.2    4.2    4.6
                   

Total

   22.9    21.8    35.2    34.6
                   

 

(1) Long tons of pellets (2,240 pounds).

The decrease in production at Empire compared with the prior year is primarily due to Empire processing Tilden ore to produce 0.4 million tons of pellets under a test period. The corresponding increase is reflected at Tilden, bringing total 2008 production to 7.6 million tons compared with 7.2 million tons in 2007.

The increase in Hibbing’s production in 2008 compared with 2007 was a result of the shutdown in late February 2007 due to severe weather conditions that caused significant buildup of ice in the basin supplying water to the processing facility. The full year production loss in 2007 totaled approximately 0.8 million tons (Company share 0.2 million tons).

The increase in production in 2008 at Northshore was due to reactivation of one of the furnaces at the end of March 2008. Accordingly, production at Northshore benefited from an incremental increase of approximately 0.6 million tons in 2008 and is expected to benefit from an increase of 0.8 million tons of annual capacity thereafter. This increase was partially offset by production curtailments totaling 0.3 million tons in the fourth quarter from idling pellet furnaces in response to production slowdowns in the steel industry.

The increase in our share of production at United Taconite is primarily related to the acquisition of the remaining 30 percent interest in July 2008. United Taconite’s 2008 production was reduced by 0.2 million tons in the fourth quarter from idling a pellet furnace in response to production slowdowns in the steel industry.

In December 2008, we executed plans to reduce production at our six North American iron ore mines to approximately 15 million equity tons. This compares with 2008 production of 22.9 million equity tons. In order to implement the lower production levels, we have temporarily idled various pellet furnaces and initiated workforce adjustments at each of our North American Iron Ore mines. Based on current market uncertainties and corresponding blast furnace capacity utilization in North America, we continue to monitor the marketplace and will adjust our production plans for 2009 accordingly.

 

59


Table of Contents

North American Coal

Following is a summary of North American Coal results for 2008 and 2007:

 

     (In Millions, except tonnage)  
     Twelve Months     Five Months     Change due to  
     Ended December 31,     Sales price
and rate
    Sales
volume
    Freight and
reimbursements
    Total
change
 
     2008     2007          

Revenues from product sales and services

   $ 346.3     $ 85.2     $ 70.5     $ 147.9     $ 42.7     $ 261.1  

Cost of goods sold and operating expense

     (392.7 )     (116.9 )     (29.3 )     (203.8 )     (42.7 )     (275.8 )
                                                

Sales margin

   $ (46.4 )   $ (31.7 )   $ 41.2     $ (55.9 )   $ —       $ (14.7 )
                                                

Sales tons (in thousands)

     3,241       1,171          

Results for 2007 represent five month totals since the July 31, 2007 acquisition.

We reported losses of $46.4 million and $31.7 million in sales margin for the year ended December 31, 2008 and 2007, respectively. Sales volume and costs in 2008 continued to be negatively impacted by adverse mining conditions and production delays throughout the year. In addition, we declared force majeure on customer shipments from our Pinnacle mine in mid-March 2008. Production at the mine slowed as a result of encountering a fault area within the coal panel being mined at the time. The force majeure was lifted in mid-June.

Despite completion of a longwall move in June 2008, our Oak Grove mine continued to experience delays and lower than planned production levels during the second half of 2008. The mine encountered lower than planned coal heights in the current mining panel and harsh geological conditions in the development areas. Additional costs have also been incurred for repairs and maintenance as a result of mechanical problems caused by adverse geological conditions, delays associated with equipment replacements and availability of experienced mining personnel. Oak Grove decreased production in the fourth quarter to enable continuous miners to prepare longwall panels. One of our Green Ridge facilities, located in the Pinnacle Complex, has shut down production in an effort to focus on mining the remaining other Green Ridge location, resulting in lower overall production for the facility.

We continue to be challenged with adverse geological conditions across the mines and delays in delivery of new capital equipment, which have contributed to overall equipment performance and availability issues, which increased costs in all operations.

Production

Following is a summary of coal production tonnage for 2008 and 2007:

 

     (In Thousands) (1)
     Twelve Months    Five Months
     Ended December 31,
     2008    2007 (2)

Mine:

     

Pinnacle Complex

   2,489    685

Oak Grove

   979    406
         

Total

   3,468    1,091
         

 

(1) Tons are short tons (2,000 pounds).

 

(2) Prior year results represent production since the July 31, 2007 acquisition.

Production in 2008 was impacted by the extension of longwall development timing related to unplanned geological conditions, difficulty in obtaining additional equipment and personnel, and mechanical problems

 

60


Table of Contents

experienced within the second half of 2008 at our Oak Grove Mine. Also impacting production in 2008 were adverse mining conditions at our Pinnacle Complex. In addition, as a result of the economic downturn and its impact on the global steel industry, we initiated operating plans to reduce production and commence workforce adjustments at our Pinnacle Mine in December 2008.

Asia Pacific Iron Ore

Following is a summary of Asia Pacific Iron Ore results for 2008 and 2007:

 

     (In Millions)  
                 Change due to        
     2008     2007     Sales price
and rate
    Sales
volume
    Total
change
 

Revenues from product sales and services

   $ 769.8     $ 444.6     $ 343.9     $ (18.7 )   $ 325.2  

Cost of goods sold and operating expense

     (421.2 )     (348.8 )     (87.1 )     14.7       (72.4 )
                                        

Sales margin

   $ 348.6     $ 95.8     $ 256.8     $ (4.0 )   $ 252.8  
                                        

Sales tons

     7.8       8.1        

In 2008, the Australian benchmark prices for lump and fines settled at increases of 97 percent and 80 percent, respectively. As a result of the price settlement, sales from our Asia Pacific Iron Ore segment have been recorded at the higher 2008 prices, thereby resulting in record revenues.

Cost of goods sold and operating expenses for the year to date increased primarily due to higher costs of production partially offset by lower volume and reduction of stockpiles. Increased costs of production were a result of higher fuel, maintenance and contract labor expenditures arising from inflationary pressures. Fuel and energy costs for the year to date increased approximately $14.1 million compared with 2007. Costs were also negatively impacted in 2008 by increased royalty payments due to higher revenues and approximately $1.6 million related to unfavorable foreign exchange rates. In addition, the current period was impacted by the step acquisition of the remaining ownership interest in Portman.

Production

Following is a summary of iron ore production tonnage for 2008 and 2007:

 

     (In Millions) (1)
     Total
     2008    2007

Mine:

     

Koolyanobbing

   7.3    7.7

Cockatoo Island

   0.4    0.7
         

Total

   7.7    8.4
         

 

(1) Tonnes are metric tons (2,205 pounds). Cockatoo production reflects our 50 percent share.

The decrease in production in 2008 compared with 2007 was primarily due to inventory stockpile reductions in an effort to improve working capital. In addition, production at Cockatoo declined as the second stage of the seawall reserves were exhausted. Construction on Phase 3 of the seawall is expected to be completed in May 2009, with sales continuing for approximately two years through June 2011.

 

61


Table of Contents

2007 Compared to 2006

North American Iron Ore

Following is a summary of North American Iron Ore sales margin for 2007 versus 2006:

 

    (In Millions)  
                Change due to        
    2007     2006     Sales price
and rate
  Sales
volume
    Freight and
reimbursements
    Total
change
 

Revenue from product sales and services

  $ 1,745.4     $ 1,560.7     $ 39.3   $ 122.4     $ 23.0     $ 184.7  

Cost of goods sold and operating expenses

    (1,347.5 )     (1,233.3 )     0.6     (91.8 )     (23.0 )     (114.2 )
                                             

Sales margin

  $ 397.9     $ 327.4     $ 39.9   $ 30.6     $ —       $ 70.5  
                                             

Sales tons

    22.3       20.4          

The increase in sales revenue was due to a sales volume increase of 1.9 million tons, or $122.4 million, higher sales prices, $39.3 million and higher freight and venture partners’ reimbursements, $23.0 million. Sales volume in 2007 included 1.5 million tons of pellets purchased and paid for by customers at year-end under take-or-pay provisions of existing long-term supply agreements. First half shipments in 2007 included 1.2 million tons of pellets purchased in upper Great Lakes stockpiles and paid for in 2006. Revenue recognition related to the December 2006 stockpile transaction totaling $62.6 million was deferred until the product was delivered in 2007. Sales prices per-ton increased 2.8 percent, reflecting the effect of contractual base price increases, higher term supply agreement escalation factors including higher steel pricing, higher Producers Price Indices and lag-year adjustments.

The increase in cost of goods sold and operating expenses primarily reflected higher volume, $91.8 million. On a per-ton basis, cost of goods sold and operating expenses were flat in comparison to last year, as a result of our strategic procurement, maintenance and other business improvement programs, as well as the implementation of Six Sigma and Lean Sigma. This compares with a Producers Price Indices increase of 4.1 percent, which is a measurement of industrial company cost inflation. Principally, as a result this cost containment, North American Iron Ore sales margin per ton increased 11 percent from 2006.

Production

Following is a summary of North American Iron Ore production tonnage for 2007 versus 2006:

 

     (In Millions) (1)
     Company Share    Total

Mine

   2007    2006    2007    2006

Empire

   3.9    3.8    4.9    4.9

Tilden

   6.1    5.9    7.2    6.9

Hibbing

   1.7    1.9    7.4    8.3

Northshore

   5.2    5.1    5.2    5.1

United Taconite

   3.7    3.0    5.3    4.3

Wabush

   1.2    1.1    4.6    4.1
                   

Total

   21.8    20.8    34.6    33.6
                   

 

(1) Long tons of pellets (2,240 pounds).

The decrease in Hibbing’s production was a result of the shutdown in late February 2007 due to severe weather conditions that caused significant buildup of ice in the basin supplying water to the processing facility.

Year-over-year production at Tilden benefited from major maintenance work and operating improvements performed in the prior year, and United Taconite production increased due to its recovery from last year’s electrical accident. Production at Wabush was higher as a result of pit design improvements to mitigate dewatering issues.

 

62


Table of Contents

We reinitiated construction activity to restart an idled pellet furnace at the Northshore facility that increased capacity by approximately 0.6 million tons of pellets in 2008 and 0.8 million tons to our annual capacity thereafter.

North American Coal

Following is a summary of North American Coal sales margin since the July 31, 2007 acquisition:

 

     (In Millions, except tonnage)  
     Five Months Ended
December 31, 2007
 

Revenues from product sales and services

   $ 85.2  

Cost of goods sold and operating expense

     (116.9 )
        

Sales margin

   $ (31.7 )
        

Sales tons (in thousands) (1)

     1,171  

 

(1) Tons are short tons (2,000 pounds).

In August 2007, production at our Pinnacle mine in West Virginia slowed as a result of sandstone intrusions encountered within the coal panel being mined at the time. This slowdown prompted the operating decision in late September to move the mine’s longwall plow system to another panel. In mid-October, the plow system was brought back into production. In addition, we had invested in business improvement initiatives and safety activities designed to enhance future production at our Oak Grove mine. These investments reduced our 2007 production.

The slowdown and resulting lack of leverage over fixed costs, such as labor and energy, contributed to a loss of sales margin and unusually high per-ton costs of goods sold.

Production

Following is a summary of North American Coal production tonnage for 2007:

 

     (In Thousands)

Mine

   Five Months Ended
December 31, 2007 (1)

Pinnacle Complex

   685

Oak Grove

   406
    

Total

   1,091
    

 

(1) Tons are short tons (2,000 pounds).

Asia Pacific Iron Ore

Following is a summary of Asia Pacific Iron Ore sales margin for 2007 versus 2006:

 

     (In Millions)  
                 Change due to     Total
change
 
   2007     2006     Sales price
and rate
    Sales
volume
   

Revenue from product sales and services

   $ 444.6     $ 361.0     $ 48.9     $ 34.7     $ 83.6  

Cost of goods sold and operating expenses

     (348.8 )     (274.4 )     (48.0 )     (26.4 )     (74.4 )
                                        

Sales margin

   $ 95.8     $ 86.6     $ 0.9     $ 8.3     $ 9.2  
                                        

Sales tonnes

     8.1       7.4        

 

63


Table of Contents

The increase in sales revenue was due to higher sales prices, $48.9 million and higher volume, $34.7 million. Portman’s sales prices reflected the effects of the 9.5 percent increase in the international benchmark price of iron ore fines and lump. The 0.7 million tonne volume increase reflected the completion of the two-million-tonne per annum expansion at Koolyanobbing in late 2006.

Increased production capacity has allowed Asia Pacific to supply higher sales volumes at increased price realizations driven by intense demand from the Asian steel industry, particularly in China. As a result of this demand, revenues per tonne increased 12 percent from the prior year. Per-tonne costs in Asia Pacific Iron Ore, which increased 16 percent, continue to be negatively impacted by foreign exchange rates, as the U.S. dollar weakened relative to the Australian dollar, as well as higher maintenance and contract labor expenditures. In 2007, our Asia Pacific Iron Ore management team also put in place a new contractor for mine operations that has cost control incentives.

Production

Following is a summary of Asia Pacific Iron Ore production tonnage for 2007 versus 2006:

 

     (In Millions) (1)
     Total

Mine

   2007    2006

Koolyanobbing

   7.7    7.0

Cockatoo Island

   0.7    0.7
         

Total

   8.4    7.7
         

 

(1) Metric tons (2,205 pounds).

The increase in production primarily reflected the completion of the expansion at Koolyanobbing in late 2006. Production at Cockatoo Island remained steady and continued into 2008. However, in 2008, Cockatoo Island production began to decline, as the second stage of the seawall reserves were exhausted. Construction on a necessary extension of the existing seawall commenced in the third quarter 2008, with production anticipated to restart by the end of the second quarter 2009. This extension is expected to extend production for approximately two additional years, through June 2011.

In July 2007, Portman was notified that its exploration and mining rights under two leases would not be extended beyond July 3, 2007. The mining leases permit Portman to explore for and mine iron ore on mining tenements north of Portman’s Koolyanobbing operations, including the rights to 4.5 million tonnes of iron ore reserves. Portman has since negotiated an in-principle agreement to transfer these rights to the other party in exchange for additional mining rights to new leases.

Liquidity, Cash Flows and Capital Resources

In 2008, we have taken a balanced approach to allocation of our capital resources and free cash flow. We have made strategic investments both domestically and internationally, increased our capital expenditures, strengthened our balance sheet, and increased our borrowing capacity.

Operating Activities

Net cash provided by operating activities was $853.2 million in 2008, compared with $288.9 million and $428.5 million in 2007 and 2006, respectively. Operating cash flows in 2008 were impacted by improved operating results, higher overall gains on our derivative instruments, and other changes in working capital.

Investing Activities

Net cash used for investing activities was $795.6 million in 2008, compared with $745.4 million in 2007 and $127.4 million in 2006. Capital expenditures were $182.5 million, $199.5 million and $119.5 million in 2008, 2007 and 2006, respectively. Other significant investing activities in 2008 included the purchases of the remaining minority interests in Portman and United Taconite and our investment in AusQuest. Investing activities in 2007 included the purchase of PinnOak as well as our investments in Sonoma and Amapá.

 

64


Table of Contents

In addition, non-cash investing activities in 2008 include the issuance of $165 million of unregistered common shares and the commitment to provide 1.2 million tons of iron ore pellets as part of the consideration paid to acquire the remaining 30 percent interest in United Taconite. Non-cash investing activities during the year also include the issuance of four million of our common shares at a share price of $38.27 to the former owners of PinnOak to accelerate the deferred payment and settle the contingent earn-out associated with the initial purchase agreement.

Financing Activities

Net cash provided by financing activities in 2008 was $32.4 million, compared with $250.1 million in 2007. In 2006, our net cash used in financing activities was $148.4 million. Consolidated long-term debt at December 31, 2008 was $525 million, compared to $440 million at December 31, 2007. Cash flows from financing activities in 2008 primarily included borrowings under our revolving credit facility and senior notes of $865 million, partially offset by debt repayments of $780 million during the year.

The following is a summary of significant sources and uses of cash in 2008 and 2007:

 

     (In Millions)  
     2008     2007  

Cash and cash equivalents — January 1

   $ 157.1     $ 351.7  
                

Significant Transactions

    

Purchase of Portman

   $ (485.1 )   $ —    

Purchase of United Taconite

     (104.4 )     —    

Purchase of PinnOak

     —         (343.8 )

Acquisition termination fees

     (70.0 )     —    

Investments in ventures and other securities

     (93.1 )     (265.9 )

Michigan expansion project

     (47.7 )     —    

Longwall development

     (29.6 )     —    

Rail upgrade

     (11.7 )     —    

Northshore capacity expansion project

     (7.6 )     (8.6 )

Other capital expenditures

     (85.9 )     (190.9 )

Repayment of debt and other borrowings

     (788.4 )     (921.5 )

Dividend distributions

     (37.2 )     (26.4 )

Sale of assets

     41.2       23.2  
                

Total

     (1,719.5 )     (1,733.9 )

Sources of Financing

    

Net cash provided by operations (1)

     923.2       288.9  

Borrowings under senior notes

     325.0       —    

Borrowings under revolving loans

     540.0       1,195.0  
                

Total

     1,788.2       1,483.9  

Other net activity

     (46.8 )     55.4  
                

Cash and cash equivalents — December 31

   $ 179.0     $ 157.1  
                

 

(1) Excludes $70 million of acquisition termination fees paid in 2008 related to the Alpha transaction.

Refer to NOTE 2 — ACQUISITIONS, DIVESTITURES & OTHER INVESTMENTS of the Consolidated Financial Statements for further information regarding the purchase of minority interests in Portman and United Taconite, the prior year acquisition of PinnOak as well as our investments in ventures.

Current Economic Environment and Future Outlook

The current volatility and uncertainty in global markets, coupled with the slowdown in the world’s major economies, has had a significant impact on commodity prices. The mining industry has seen a reduction in high cost operations, and the credit environment is expected to limit the funding and expansion capabilities of many of

 

65


Table of Contents

the junior mining companies. Based on these economic conditions, we continue to evaluate and assess our capital expenditures, in order to ensure we are positioned to face the challenges, uncertainties, as well as opportunities, associated with the current environment.

In addition, recent deterioration in the securities markets has negatively impacted the value of the assets included in our defined benefit pension plans and postretirement welfare plans based upon the value of our plan assets and obligations at December 31, 2008. The decline in fair value of our plan assets, combined with negotiated plan changes, has resulted in increased total estimated pension and OPEB costs for 2009 of $71.5 million as compared to total benefit costs of $28.9 million in 2008. Further, the decline in fair value has resulted in estimated cash contributions for 2009 of $67.4 million in accordance with our current funding strategy, which is $22.8 million higher than our 2008 funding obligation. Refer to NOTE 9 — PENSIONS AND OTHER POSTRETIREMENT BENEFITS of the Consolidated Financial Statements for additional information.

We anticipate that total cash used for investments and capital expenditures in 2009 will be approximately $300 million, including approximately $100 million related to the funding of our investment in Amapá. We are evaluating funding options for our capital needs and expect to be able to fund these requirements through operations.

The following represents our future cash commitments and contractual obligations as of December 31, 2008:

 

     Payments Due by Period (1) (In Millions)

Contractual Obligations

   Total    Less Than
1 Year
   1 - 3
Years
   3 - 5
Years
   More Than
5 Years

Long-term debt

   $ 530.4    $ 0.8    $ 4.6    $ 470.0    $ 55.0

Interest on debt (2)

     119.3      27.8      50.4      35.7      5.4

Operating lease obligations

     135.0      26.3      44.9      30.9      32.9

Capital leases

     82.7      11.6      20.9      18.9      31.3

Purchase obligations:

              

Asia Pacific rail upgrade

     27.0      27.0      —        —        —  

Longwall plow system

     54.8      53.8      1.0      

Open purchase orders

     256.2      251.4      4.8      —        —  

Forward energy contracts

     41.5      41.5      —        —        —  

Minimum “take or pay” purchase commitments (3)

     438.7      110.9      218.4      27.5      81.9
                                  

Total purchase obligations

     818.2      484.6      224.2      27.5      81.9

Other long-term liabilities:

              

Pension funding minimums

     256.9      32.1      116.1      108.7      —  

OPEB claim payments

     159.3      35.3      68.4      55.6      —  

Foreign exchange derivative contracts

     111.8      77.5      34.3      —        —  

Deferred revenue (4)

     106.5      106.5      —        —        —  

Mine closure obligations

     100.7      0.8      0.7      0.6      98.6

FIN 48 obligations (5)

     35.9      12.6      23.3      —        —  

Personal injury

     30.3      5.2      4.8      1.5      18.8

Other (6)

              
                                  

Total other long-term liabilities

     801.4      270.0      247.6      166.4      117.4
                                  

Total

   $ 2,487.0    $ 821.1    $ 592.6    $ 749.4    $ 323.9
                                  

 

(1) Includes our consolidated obligations.

 

(2) Interest on the $200 million term debt is calculated using actual rates through April 2009 and is estimated using a 3-year Libor swap rate of 1.75 percent plus a margin of 0.50 from April 2009 through maturity in August 2012. The calculation includes a $100 million Libor interest rate swap fixed at 4.65 percent with an October 2009 maturity date. For the $325 million senior notes, interest is calculated for the $270 million five-year senior notes using a fixed rate of 6.31 percent from 2009 to maturity in June 2013, and for the $55 million seven-year senior notes, interest is calculated at 6.59 percent from 2009 to maturity in June 2015.

 

66


Table of Contents
(3) Includes minimum electric power demand charges, minimum coal, diesel and natural gas obligations, minimum railroad transportation obligations, minimum port facility obligations and minimum water pipeline access obligations for the Sonoma washplant.

 

(4) Relates to pellet delivery consideration for purchase of the remaining 30 percent interest in United Taconite.

 

(5) Includes accrued interest.

 

(6) Other contractual obligations of approximately $86.8 million primarily include income taxes payable and deferred income tax amounts for which timing of payment is non-determinable.

Refer to NOTE 16 — COMMITMENTS AND CONTINGENCIES of the Consolidated Financial Statements for additional information regarding our future purchase commitments and obligations.

Capital Resources

We expect to fund our business obligations from available cash, current operations and borrowings under our credit facility. The following represents a summary of key liquidity measures at December 31, 2008 and 2007:

 

     (In Millions)  
     December 31,
2008
    December 31,
2007
 

Cash and cash equivalents

   $ 179.0     $ 157.1  
                

Credit facility

   $ 800.0     $ 800.0  

Senior notes

     325.0       —    

Portman facilities

     27.6       —    

Senior notes drawn

     (325.0 )     —    

Term loans drawn

     (200.0 )     (200.0 )

Revolving loans drawn

     —         (240.0 )

Letter of credit obligations and other commitments

     (40.3 )     (16.2 )
                

Borrowing capacity available

   $ 587.3     $ 343.8  
                

Refer to NOTE 5 — DEBT AND CREDIT FACILITIES of our consolidated financial statements for further information regarding our debt and credit facilities.

We expect meaningful cash flow from operations in 2009. Cash flows from operations are expected to fund all of our contractual obligations in 2009, as well as, expected capital expenditures, pension and OPEB contributions and dividends. Apart from cash generated by the business our primary source of funding is cash on hand, which totals $179.0 million as of December 31, 2008. We also have a $600 million revolving credit facility, which comes due in 2012. This facility has available borrowing capacity of $578.5 million as of December 31, 2008. The combination of cash and the credit facility give us over $750 million in liquidity entering 2009.

As is the case each year, cash flows will be negatively impacted in the first two quarters of 2009 due to an inability to ship over the Great Lakes in the early part of the year. While this will have a detrimental impact on cash flow and earnings in those quarters, we do not expect it to create any liquidity issues, nor do we expect any adverse impact on our debt covenants. Assuming current projected volumes, our liquidity appears to be sufficient, and we will maintain ample room under our debt covenants for 2009.

Several credit markets may provide additional capacity should that become necessary. The bank market may provide funding through a term loan or through exercising the $200 million accordion in our credit facility. In October 2008, we were able to obtain approximately $1.5 billion in commitments from the bank market as part of the funding for the proposed acquisition of Alpha Natural Resources. The risk associated with this market is that decreasing capacity has lead to significant increases in borrowing costs. In 2008, we went to the private placement market to fund $325 million senior notes which are due in 2013 and 2015. Capacity, as in all debt

 

67


Table of Contents

markets, is a global issue in addition to the fact that our notes have been outstanding for less than one year. Capacity in the bond market appears to be rebounding slowly for investment grade companies. Longer term debt arrangements at current corporate bond rates must be aligned with our longer term capital structure needs. Finally, the equity market has begun to see some activity. Shareholder dilution is a significant determining factor in deciding whether to access this market, in addition to considering how this alternative would align with our longer term capital structure.

Off-Balance Sheet Arrangements

An off-balance sheet arrangement is any transaction, agreement or other contractual arrangement involving an unconsolidated entity under which a company has:

 

   

made guarantees,

 

   

retained or held a contingent interest in transferred assets,

 

   

undertaken an obligation under certain derivative instruments, or

 

   

undertaken any obligation arising our of a material variable interest in an unconsolidated entity that provides financing, liquidity, market risk or credit risk support to the company, or engages in leasing, hedging or research and development arrangements with the company.

We have entered into certain agreements under which we have provided guarantees to an unconsolidated entity that are off-balance sheet arrangements. In addition, we have operating leases, which are primarily utilized for certain equipment and office space. Aside from this, we do not have any other off-balance sheet financing arrangements. Refer to NOTE 16 — COMMITMENTS AND CONTINGENCIES for additional information regarding our guarantees.

Market Risks

We are subject to a variety of risks, including those caused by changes in the market value of equity investments, changes in commodity prices, interest rates and foreign currency exchange rates. We have established policies and procedures to manage such risks; however, certain risks are beyond our control.

Foreign Currency Exchange Rate Risk

We are subject to changes in foreign currency exchange rates in Australia as a result of our operations at Portman and Sonoma, which could impact our financial condition. Foreign exchange risk arises from our exposure to fluctuations in foreign currency exchange rates because our reporting currency is the United States dollar. Portman hedges a portion of its United States currency-denominated sales in accordance with a formal policy. The primary objective for using derivative financial instruments is to reduce the volatility attributable to changes in Australian and United States currency fluctuations. The instruments were subject to formal documentation, intended to achieve qualifying hedge treatment, and were tested at inception and at each reporting period as to effectiveness. Effective July 1, 2008, Portman discontinued hedge accounting for these derivatives, but continues to hold these instruments as economic hedges to manage currency risk. Upon de-designation of the cash flow hedges, the instruments are prospectively marked to fair value each reporting period through Changes in fair value of derivative instruments, net on the Statement of Consolidated Operations. At December 31, 2008, Portman had approximately $869.0 million of outstanding exchange rate contracts in the form of call options, collar options, convertible collar options and forward exchange contracts with varying maturity dates ranging from January 2009 to August 2011. A 10 percent increase in the value of the Australian dollar from the month-end rate would increase the fair value by approximately $65.4 million, and a 10 percent decrease would reduce the fair value by approximately $79.9 million.

We are required to record on our Statements of Consolidated Financial Position the market value of our open derivative positions which do not qualify for hedge accounting treatment. The gain or loss resulting from changes in the market value of these derivative instruments is recorded as an unrealized gain or loss each reporting period. These mark-to-market adjustments are recorded as non-operating costs on the Statements of Consolidated Operations.

 

68


Table of Contents

Our share of pellets produced at the Wabush operation in Canada represents approximately five percent of our North American iron ore pellet production. This operation is subject to currency exchange fluctuations between the United States and Canadian currency; however, we do not hedge our exposure to this currency exchange fluctuation.

Under the majority ownership of MMX, Amapá’s functional currency was previously determined to be the Brazilian real. The analysis performed to determine the functional currency at the time indicated a mixed outcome assessment of the pertinent determining economic factors as set forth under SFAS No. 52, Foreign Currency Translation (“SFAS 52”), including, for example, sales being priced in U. S. dollars and operating costs being largely incurred in Brazilian real. The change in control of Amapá to Anglo in August 2008 resulted in the review of financial, operating and treasury policies of the entity under new management. This, along with recent efforts to mitigate exposures related to fluctuations in foreign currency exchange rates resulted in the reassessment of the accounting principles related to the determination of Amapá’s functional currency during the fourth quarter of 2008. As a result, effective October 1, 2008, we changed the functional currency of Amapá from the local currency to the U.S. dollar reporting currency primarily due to changes in the debt structure under which the entity is financed as well as changes in the treasury, risk mitigation and financial reporting policies under which the entity’s operations are managed, resulting in the U.S. dollar becoming the currency of the primary economic environment in which the business operates. Refer to NOTE 1 – BUSINESS SUMMARY AND SIGNIFICANT ACCOUNTING POLICIES, of the consolidated financial statements for further information.

Interest Rate Risk

Interest for borrowings under our credit facility is at a floating rate, dependent in part on the LIBOR rate, which exposes us to the effects of interest rate changes. Based on $100 million in outstanding revolving and term loans at December 31, 2008, with a floating interest rate and no corresponding fixed rate swap, a 100 basis point change to the LIBOR rate would result in a change of $1.0 million to interest expense on an annual basis.

In October 2007, we entered into a $100 million fixed rate swap to convert a portion of this floating rate into a fixed rate. With the swap agreement, we pay a fixed three-month LIBOR rate for $100 million of our floating rate borrowings. The interest rate swap terminates in October 2009 and qualifies as a cash flow hedge.

Pricing Risks

The current global economic crisis has resulted in increasing downward pressure from customers, particularly in China, for a roll back of the 2008 price increases for seaborne iron ore and metallurgical coal in 2009. The 2008 record price increase was driven by high demand for iron ore and coking coal, global steel production at historically high levels, combined with production and logistics constraints for both iron ore and coking coal, resulting in tight supply conditions. With the current global economic crisis, none of these conditions exist in early 2009; and the market now is characterized by a collapse in steel demand and limited global demand for iron ore and coking coal. Reduced demand for iron ore and coking coal will likely result in decreased demand for our products and decreasing prices, resulting in lower revenue levels in 2009, and decreasing margins as a result of decreased production, adversely affecting our results of operations, financial condition and liquidity.

Nonperformance and Liquidity Risks

The current global economic crisis has adversely affected our business and could impact our financial results. All of our customers have announced curtailments of production, which has adversely affected the demand for our iron ore and coal products. Continuation or worsening of the current economic conditions, a prolonged global, national or regional economic recession or other events that could produce major changes in demand patterns, could have a material adverse effect on our sales, margins and profitability. We are not able to predict the impact the current global economic crisis will have on our operations and the industry in general going forward.

 

69


Table of Contents

In addition, consolidations in some of the industries in which our customers operate have created larger customers, some of which are highly leveraged. These factors have caused some customers to be less profitable and increased our exposure to credit risk. Current credit markets are highly volatile, and some of our customers are highly leveraged. A significant adverse change in the financial and/or credit position of a customer could require us to assume greater credit risk relating to that customer and could limit our ability to collect receivables. Failure to receive payment from our customers for products that we have delivered could adversely affect our results of operations, financial condition and liquidity.

Our investment policy relating to short-term investments is to preserve principal and liquidity while maximizing the short-term return through investment of available funds. The carrying value of these investments approximates fair value on the reporting dates. We commonly use AAA-rated money market funds for short-term investments. On September 19, 2008, we received notice that one of the money market funds, in which we had $20 million invested, was suspending all-cash redemptions and redeeming a combination of cash and in-kind securities until December 12, 2008, when all of the fund’s securities matured. The investment was redeemed in cash for full value on December 12, 2008. All other money market funds we invested in maintained daily cash redemptions throughout 2008.

Approximately 2.9 percent of our U.S. pension trust assets and 1.5 percent of VEBA assets are exposed to sub prime risk, all of which are investment grade and fully collateralized by properties. These investments primarily include Mortgage-Backed Securities and the Home Equity subset of the Asset-Backed Securities sector with AAA and AA credit quality ratings. Due to the continuing liquidity crisis in the U.S., the spreads of these structures have widened and, as a result, their market values have declined. However, the over-collateralization of these arrangements is expected to mitigate the potential for principal loss in these tranches. As evidence, there has been no material impairment in these securities as of December 31, 2008. The U.S. pension and VEBA trusts have no allocations to mortgage-related collateralized debt obligations.

Volatile Energy and Fuel Costs

The volatile cost of energy and supplies is an important issue affecting our production costs, primarily in relation to our iron ore operations. Recent trends have shown that although electric power, natural gas, and oil costs are declining, the direction and magnitude of short-term changes are difficult to predict. Our consolidated North American iron ore mining ventures consumed approximately 13.5 million MMBtu’s of natural gas at an average delivered price of $9.18 per MMBtu, and 22.5 million gallons of diesel fuel at an average delivered price of $3.03 per gallon in 2008. Consumption of diesel fuel by our Asia Pacific Operations was approximately 10.6 million gallons for the same period. As of December 31, 2008 we have 3.5 million MMBtu’s of natural gas, representing approximately 38 percent of our 2009 natural gas requirements, purchased forward at an average price of $8.99 per MMBtu. We also have 6.4 million gallons of diesel fuel, representing approximately 31 percent of our 2009 requirements, purchased forward at $2.58 per gallon for our North American iron ore mining ventures. Such contracts are a means to limit our exposure to potential future market price increases.

Our strategy to address increasing energy rates includes improving efficiency in energy usage and utilizing the lowest cost alternative fuels. Our North American Iron Ore mining ventures enter into forward contracts for certain commodities, primarily natural gas and diesel fuel, as a hedge against price volatility. Such contracts are in quantities expected to be delivered and used in the production process. At December 31, 2008, the notional amount of the outstanding forward contracts was $41.5 million, with an unrecognized fair value net loss of $8.4 million based on December 31, 2008 forward rates. The contracts mature at various times through December 2009. If the forward rates were to change 10 percent from the month-end rate, the value and potential cash flow effect on the contracts would be approximately $3.3 million.

Outlook

Given the current macroeconomic environment and the impact on demand for steelmaking raw materials in the intermediate term, our priority in 2009 is to generate and preserve cash in order to maintain our high degree of financial flexibility. While our Company’s management team has taken swift action to bring production levels at all of our businesses in line with current demand, a great deal of uncertainty remains in the marketplace.

 

70


Table of Contents

North American Iron Ore Outlook

For 2009, we have contractual obligations for approximately 18 million tons of sales volume. These commitments, combined with eventual revenue recognition of 1.2 million tons deferred in 2008, total approximately 19 million tons of sales volume for 2009. This sales volume total assumes we will recognize “bill and hold” sales, which are anticipated to occur in the fourth quarter of 2009. In addition, based on current market uncertainties and corresponding blast furnace capacity utilization in North America, we must continue to monitor the marketplace as well as the financial health of our customers.

With annual price settlements for iron ore in 2009 not yet concluded, we are unable to provide guidance on average revenue per ton in our North American Iron Ore business segment. We previously indicated our average revenue per ton in 2009 will benefit from contractual base-price adjustments, lag-year adjustments and price caps and floors contained in most of our current supply agreements. Actual realized average revenue per ton will ultimately depend on sales volume levels, World Pellet Prices, production input costs and/or steel prices, all of which are factors in our formula-based pricing for the North American Iron Ore business segment.

At the current annualized production rate for our North American Iron Ore business segment, 2009 cost per ton is expected to be between $70 and $80. The expected increase from 2008 cost per ton is the result of reduced leverage over fixed costs resulting from lower year-over-year production levels.

North American Coal Outlook

We begin 2009 with approximately 1.6 million tons of coal under contractual obligation, or approximately 45 percent of our current annualized production rate. This coal is priced at an average of $108 per ton, which includes production earmarks to fulfill obligations for tons deferred as a result of past production disruptions.

With negotiations for international met coal contracts not yet concluded, we are unable to provide guidance for uncommitted 2009 production related to our North American Coal business segment. Currently there is no precise indication where prices will settle for the high quality, low volatility coal that we produce.

In 2009, we will continue to execute our extended long-term mine planning and development activities at our North American Coal mines designed to ultimately increase annual production and improve cost per ton. As a result, cost per ton for the year is expected to be approximately between $110 and $120.

Asia Pacific Iron Ore Outlook

Asia Pacific Iron Ore 2009 sales volume is expected to be 8.4 million tonnes, with production of 8.6 million tonnes. With annual price settlements for iron ore in 2009 not yet concluded, we are unable to provide guidance on average revenue per tonne for our Asia Pacific Iron Ore business segment. We expect Asia Pacific Iron Ore cost per tonne of approximately $50 to $60.

Sonoma Coal Project Outlook

We have a 45 percent economic interest in the Sonoma coal project and expect total production of approximately 3.5 million tonnes for 2009. Sonoma is expected to have sales volume of 3.3 million tonnes with an approximate 60/40 mix between thermal and metallurgical coal, respectively. Per-tonne costs at Sonoma are expected to be between $85 and $95. The increase from 2008 cost per ton levels is the result of an anticipated special royalty payment under an agreement with our partner, QCoal, that occurs when the mine exceeds a certain performance threshold.

Amapá Iron Ore Project Update

In the third quarter of 2008, our new partner in the Amapá project, Anglo, closed its acquisition of MMX’s 70 percent share of the project and assumed management control over the venture. Throughout the year, the ramp-up of operations was significantly slower than previously anticipated, with annual production totaling 1.2 million tonnes. We, along with Anglo, continue to study all aspects of the project and are taking proactive steps to ensure production is ramped up to the design annual capacity of 6.5 tonnes. We expect to incur an equity loss related to the project of approximately $50 million to $60 million in 2009.

 

71


Table of Contents

Selling, General and Administrative Expenses and Other Expectations

As a result of limited headcount rationalization, including the elimination and combination of some executive and management positions, combined with tight cost controls, selling, general and administrative expenses are anticipated to be approximately flat to slightly down in 2009 from 2008 levels. We anticipate an effective tax rate of approximately 26 percent to 28 percent for the year. We also expect 2009 capital expenditures of approximately $200 million and depreciation and amortization of approximately $215 million.

Recently Issued Accounting Pronouncements

Refer to NOTE 1 — BUSINESS SUMMARY AND SIGNIFICANT ACCOUNTING POLICIES of the consolidated financial statements for a description of recent accounting pronouncements, including the respective dates of adoption and effects on results of operations and financial condition.

Critical Accounting Estimates

Management’s discussion and analysis of financial condition and results of operations is based on our consolidated financial statements, which have been prepared in accordance with GAAP. Preparation of financial statements requires management to make assumptions, estimates and judgments that affect the reported amounts of assets, liabilities, revenues, costs and expenses, and the related disclosures of contingencies. Management bases its estimates on various assumptions and historical experience, which are believed to be reasonable; however, due to the inherent nature of estimates, actual results may differ significantly due to changed conditions or assumptions. On a regular basis, management reviews the accounting policies, assumptions, estimates and judgments to ensure that our financial statements are fairly presented in accordance with GAAP. However, because future events and their effects cannot be determined with certainty, actual results could differ from our assumptions and estimates, and such differences could be material. Management believes that the following critical accounting estimates and judgments have a significant impact on our financial statements.

Revenue Recognition

North American Iron Ore

Revenue is recognized on the sale of products when title to the product has transferred to the customer in accordance with the specified provisions of each term supply agreement and all applicable criteria for revenue recognition have been satisfied. Most of our North American Iron Ore term supply agreements provide that title and risk of loss transfer to the customer when payment is received. This is a practice utilized to reduce our financial risk to customer insolvency. Under some term supply agreements, we ship the product to ports on the lower Great Lakes or to the customer’s facilities prior to the transfer of title. Our rationale for shipping iron ore products to some customers and retaining title until payment is received for these products is to minimize credit risk exposure.

We recorded revenue of $25.4 million in the fourth quarter of 2008 related to sales to customers under minimum purchase requirements of supply agreements, who had paid for the iron ore but requested that we not ship the product until the spring of 2009, when the Great Lakes waterways re-open for shipping. This compares to $87 million of revenue recorded under similar arrangements in the fourth quarter of 2007. These bill-and-hold sales were made pursuant to long-term contracts that include annual take-or-pay arrangements. Critical estimates and other factors related to the recognition of revenue on these stockpile sales include the freezing weather conditions on the Great Lakes and the existence of a fixed delivery schedule that is reflective of the customer’s historical stockpile shipment requests.

In 2008, certain customers purchased and paid for 1.2 million tons of pellets in upper lakes stockpiles in order to meet minimum contractual purchase requirements. At the request of the customers, the ore was not shipped. We considered whether revenue should be recognized on these sales under the “bill and hold” guidance provided in SEC Staff Accounting Bulletin No. 104 Topic 13; however, since fixed shipment schedules were not established prior to year-end, revenue recognition on these transactions, totaling $82.9 million, was deferred and will be recognized upon shipment in 2009.

 

72


Table of Contents

Most of our North American Iron Ore long-term supply agreements are comprised of a base price with annual price adjustment factors. These price adjustment factors vary based on the agreement but typically include adjustments based upon changes in international pellet prices, changes in specified Producers Price Indices including those for all commodities, industrial commodities, energy and steel. The adjustments generally operate in the same manner, with each factor typically comprising a portion of the price adjustment, although the weighting of each factor varies based upon the specific terms of each agreement. One of our term supply agreements contains price collars, which typically limit the percentage increase or decrease in prices for our iron ore pellets during any given year. In most cases, these adjustment factors have not been finalized at the time our product is sold; we routinely estimate these adjustment factors. The price adjustment factors have been evaluated to determine if they contain embedded derivatives. We evaluated the embedded derivatives in the supply agreements in accordance with the provisions of SFAS 133, Accounting for Derivative Instruments and Hedging Activities, as amended by SFAS 138, Accounting for Certain Derivative Instruments and Certain Hedging Activities — an amendment of FASB Statement No. 133. The price adjustment factors share the same economic characteristics and risks as the host contract and are integral to the host contract as inflation adjustments; accordingly they have not been separately valued as derivative instruments. In addition, certain supply agreements with one customer include provisions for supplemental revenue or refunds based on the customer’s annual steel pricing for the year the product is consumed in the customer’s blast furnaces. We account for this provision as a derivative instrument at the time of sale and record this provision at fair value until the year the product is consumed and the amounts are settled as an adjustment to revenue.

As part of the agreement to acquire the remaining 30 percent interest in United Taconite, effective July 1, 2008, we committed approximately 1.2 million tons of iron ore pellets, which are to be provided through September 2009. This commitment represents an obligation to deliver the pellets as additional consideration for the remaining interest in United Taconite. The pellets were initially valued at $181.3 million, based upon the 2008 Eastern Canadian pellet price at the time of acquisition, and the additional consideration is recorded as current Derivative liabilities on the Statement of Consolidated Financial Position until the pellets are delivered. The purchase agreement contains a penalty provision in the event the 1.2 million tons of pellets are not delivered by a specified date. The penalty provision, which is not a fixed amount or a fixed amount per unit, causes net settlement in this arrangement, and therefore causes the obligation to be accounted for as a derivative instrument, which is based on the future Eastern Canadian pellet price. The instrument is marked to fair value each reporting period until the pellets are delivered and the amounts are settled. In 2008, we recognized $24.2 million as Product revenues on the Statements of Consolidated Operations upon shipment of 0.16 million tons of iron ore pellets. The derivative liability associated with the undelivered pellets was reduced by a mark-to-market adjustment of $50.6 million through Product revenues, resulting in $106.5 remaining in current Derivative liabilities at December 31, 2008.

Revenue from product sales includes cost reimbursements from venture partners for their share of mine costs. The mining ventures function as captive cost companies; they supply product only to their owners effectively on a cost basis. Accordingly, the minority interests’ revenue amounts are stated at cost of production and are offset in entirety by an equal amount included in cost of goods sold resulting in no profits or losses reflected in minority interest participants. As we are responsible for product fulfillment, we have the risks and rewards of a principal in the transaction, and accordingly, we record revenue in this arrangement on a gross basis in accordance with EITF, 99-19, Reporting Revenue Gross as a Principal Versus Net as an Agent, under the line item “Freight and other reimbursements”.

Revenue from product sales also includes reimbursement for freight charges paid on behalf of customers in Freight and Venture Partners’ Cost Reimbursements separate from product revenue, in accordance with EITF 00-10, Accounting for Shipping and Handling Fees and Costs. Where we are joint venture participants in the ownership of a North American iron ore mine, our contracts entitle us to receive royalties and management fees, which we earn as the pellets are produced.

 

73


Table of Contents

North American Coal

We recognize revenue when title passes to the customer. For domestic coal sales, this generally occurs when coal is loaded into rail cars at the mine. For export coal sales, this generally occurs when coal is loaded into the vessels at the terminal.

Asia Pacific Iron Ore

Sales revenue is recognized at the free on board, or F.O.B., point, which is generally when the product is loaded into the vessel. Foreign currency revenues are converted to Australian dollars at the currency exchange rate in effect at the time of the transaction.

Our Asia Pacific operations receive funds in United States currency for their iron ore and coal sales. We use forward exchange contracts, call options, collar options and convertible collar options to hedge our foreign currency exposure for a portion of our sales receipts. United States currency is converted to Australian dollars at the currency exchange rate in effect at the time of the transaction. The primary objective for the use of these instruments is to reduce exposure to changes in Australian and United States currency exchange rates and to protect against undue adverse movement in these exchange rates. Effective July 1, 2008, we discontinued hedge accounting for these derivatives, but continue to hold these instruments as economic hedges to manage currency risk. At December 31, 2008, we had approximately $869.0 million of outstanding exchange rate contracts in the form of call options, collar options, convertible collar options and forward exchange contracts with varying maturity dates ranging from January 2009 to August 2011.

Upon de-designation of these cash flow hedges, the instruments are prospectively marked to fair value each reporting period through Changes in fair value of derivative instruments, net on the Statements of Consolidated Operations. In 2008 the mark-to-market adjustments resulted in a net unrealized loss of $188.2 million, based on a spot rate of 0.69 at December 31, 2008. The amounts that were previously recorded as a component of Other comprehensive income are reclassified to earnings and a corresponding realized gain or loss is recognized upon settlement of the related contracts. Since the July 1, 2008 date of de-designation, we reclassified a $25.0 million gain out of Accumulated other comprehensive loss related to contracts that settled during the period, which was recorded as Product revenues on the Statements of Consolidated Operations for the year ended December 31, 2008. In 2008, 2007 and 2006, ineffectiveness resulting in an $8.6 million loss, a $17.0 million loss, and a $2.7 million gain, respectively, was recorded in Miscellaneousnet on the Statements of Consolidated Operations. As of December 31, 2008, approximately $19.0 million of gains remains in Accumulated other comprehensive loss related to the effective cash flow hedge contracts prior to de-designation. Of this amount, we estimate $14.9 million will be reclassified to Product revenues in the next 12 months upon settlement of the related contracts.

Certain supply agreements primarily with our Asia Pacific customers provide for revenue or refunds based on the ultimate settlement of annual international benchmark pricing provisions. The pricing provisions are characterized as freestanding derivatives and are required to be accounted for separately once iron ore is shipped. The derivative instrument, which is settled and billed once the annual international benchmark price is settled, is marked to fair value as a revenue adjustment each reporting period based upon the estimated forward settlement until the benchmark is actually settled.

In the fourth quarter of 2008, we negotiated additional sales with certain of our Asia Pacific Iron Ore customers who had previously fulfilled their 2008 purchase commitments under current year contracts and required additional tonnage. In response to the economic downturn and its impact on the global steel industry, we agreed that the provisional pricing for these shipments would be at a discount to 2008 benchmark prices to reflect the decline in steel demand and prices, with final pricing being based upon 2009 benchmark prices once they are settled. The discount pricing provisions are characterized as freestanding derivatives and are required to be accounted for separately once the iron ore is shipped. The derivative instrument, which is settled and billed once the 2009 international benchmark price is settled, is marked to fair value as a revenue adjustment each reporting period based upon the estimated forward settlement until the benchmark is actually settled. We recognized approximately $34.3 million as Product revenues on the Statement of Consolidated Operations for the year ended December 31, 2008, related to the shipment of approximately 0.4 million tonnes under these pricing provisions.

 

74


Table of Contents

As of December 31, 2008, the 2009 international benchmark prices have not yet settled. Therefore, the derivative instrument was marked to fair value at December 31, 2008 resulting in a $7.7 million reduction in Product revenues on the Statement of Consolidated Operations in 2008.

Refer to NOTE 1 — BUSINESS SUMMARY AND SIGNIFICANT ACCOUNTING POLICIES, for further information regarding our revenue recognition policy.

Litigation Accruals

We are subject to proceedings, lawsuits and other claims. We are required to assess the likelihood of any adverse judgments or outcomes to these matters as well as the potential ranges of probable losses. A determination of the amount of accrual required, if any, for these contingencies is made after careful analysis of each matter. The required accrual may change in the future due to new developments in each matter or changes in approach, such as a change in settlement strategy in dealing with these matters. We do not believe that any such matter will have a material adverse effect on our financial condition or results of operations.

Income Taxes

Contingencies

Domestic and foreign tax authorities periodically audit our income tax returns. These audits include questions regarding our tax-filing positions, including the timing and amount of deductions and allocation of income among various tax jurisdictions. At any time, multiple tax years are subject to audit by the various tax authorities. In evaluating the exposures associated with our various tax-filing positions, we record reserves for exposures where a position taken has not met a more-likely-than-not threshold. A number of years may elapse before a particular matter, for which we have established a reserve, is audited and fully resolved. When facts change or the actual results of a settlement with tax authorities differs from our established reserve for a matter, we adjust our tax contingencies reserve and income tax provision in the period in which the facts changed or the income tax matter is resolved.

Prior to 2007, we recorded estimated tax liabilities to the extent they were probable and could be reasonably estimated. On January 1, 2007, we adopted the provisions of FASB Interpretation No. 48, Accounting for Uncertainty in Income Taxes (“FIN 48”). The effects of applying this Interpretation resulted in a decrease of $7.7 million to retained earnings as of January 1, 2007. FIN 48 prescribes a more-likely-than-not threshold for financial statement recognition and measurement of a tax position taken (or expected to be taken in a tax return). This Interpretation also provides guidance on derecognition of income tax assets and liabilities, accounting for interest and penalties associated with tax positions, accounting for income taxes in interim periods and income tax disclosures.

Valuation Allowance

At December 31, 2008, we had a valuation allowance of $17.6 million against our deferred tax assets. In determining the valuation allowance, we assess both negative and positive evidence when measuring the need for a valuation allowance. Evidence, such as operating results during the most recent three-year period, is given more weight than our expectations of future profitability, which are inherently uncertain. Our losses in certain foreign locations in recent periods represented sufficient negative evidence to require a full valuation allowance against certain of our foreign deferred tax assets. We intend to maintain a valuation allowance against our net deferred tax assets until sufficient positive evidence exists to support the realization of such assets.

Mineral Reserves

We regularly evaluate our economic mineral reserves and update them as required in accordance with SEC Industry Guide 7. The estimated mineral reserves could be affected by future industry conditions, geological conditions and ongoing mine planning. Maintenance of effective production capacity or the mineral reserve could require increases in capital and development expenditures. Generally as mining operations progress, haul lengths and lifts increase. Alternatively, changes in economic conditions, or the expected quality of ore reserves could decrease capacity or ore reserves. Technological progress could alleviate such factors, or increase capacity or ore reserves.

 

75


Table of Contents

We use our mineral reserve estimates combined with our estimated annual production levels, to determine the mine closure dates utilized in recording the fair value liability for asset retirement obligations. Refer to NOTE 7 — ENVIRONMENTAL AND MINE CLOSURE OBLIGATIONS, for further information. Since the liability represents the present value of the expected future obligation, a significant change in mineral reserves or mine lives would have a substantial effect on the recorded obligation. We also utilize economic mineral reserves for evaluating potential impairments of mine assets and in determining maximum useful lives utilized to calculate depreciation and amortization of long-lived mine assets. Decreases in mineral reserves or mine lives could significantly affect these items.

Asset Retirement Obligations

The accrued mine closure obligations for our active mining operations provide for contractual and legal obligations associated with the eventual closure of the mining operations. Our obligations are determined based on detailed estimates adjusted for factors that a market participant would consider (i.e., inflation, overhead and profit), which are escalated at an assumed rate of inflation to the estimated closure dates, and then discounted using the current credit-adjusted risk-free interest rate. The estimate also incorporates incremental increases in the closure cost estimates and changes in estimates of mine lives. The closure date for each location is determined based on the exhaustion date of the remaining iron ore reserves. The estimated obligations are particularly sensitive to the impact of changes in mine lives given the difference between the inflation and discount rates. Changes in the base estimates of legal and contractual closure costs due to changes in legal or contractual requirements, available technology, inflation, overhead or profit rates would also have a significant impact on the recorded obligations. Refer to NOTE 7 — ENVIRONMENTAL AND MINE CLOSURE OBLIGATIONS, for further information.

Asset Impairment

In assessing the recoverability of our long-lived assets, significant assumptions regarding the estimated future cash flows and other factors to determine the fair value of the respective assets must be made, as well as the related estimated useful lives. If these estimates or their related assumptions change in the future as a result of changes in strategy or market conditions, we may be required to record impairment charges for these assets in the period such determination was made.

We monitor conditions that indicate that the carrying value of an asset or asset group may be impaired. We determine impairment based on the asset’s ability to generate cash flow greater than its carrying value, utilizing an undiscounted probability-weighted analysis. If the analysis indicates the asset is impaired, the carrying value is adjusted to fair value. Fair value can be determined using a market approach, income approach or cost approach. The impairment analysis and fair value determination can result in substantially different outcomes based on critical assumptions and estimates including the quantity and quality of remaining economic ore reserves, future iron ore prices and production costs. Refer to NOTE 1 — BUSINESS SUMMARY AND SIGNIFICANT ACCOUNTING POLICIES, for further information regarding our policy on asset impairment.

Environmental Remediation Costs

We have a formal policy for environmental protection and restoration. Our obligations for known environmental problems at active and closed mining operations and other sites have been recognized based on estimates of the cost of investigation and remediation at each site. If the estimate can only be estimated as a range of possible amounts, with no specific amount being more likely, the minimum of the range is accrued. Management reviews its environmental remediation sites quarterly to determine if additional cost adjustments or disclosures are required. The characteristics of environmental remediation obligations, where information concerning the nature and extent of clean-up activities is not immediately available, and which are subject to changes in regulatory requirements, result in a significant risk of increase to the obligations as they mature. Expected future expenditures are not discounted to present value unless the amount and timing of the cash disbursements can be reasonably estimated. Potential insurance recoveries are not recognized until realized.

 

76


Table of Contents

Employee Retirement Benefit Obligations

We, along with our North American Iron Ore mining ventures, sponsor defined benefit pension plans covering substantially all North American employees. These plans are largely noncontributory, and benefits are generally based on employees’ years of service and average earnings for a defined period prior to retirement. We do not provide OPEB for most U.S. salaried employees hired after January 1, 1993.

Pursuant to a 2003 asset purchase agreement with the previous owner, PinnOak assumed postretirement benefits for certain employees who will vest more than five years after the asset purchase date of June 30, 2003. Postretirement benefits for vested employees and those that will vest within the five-year period subsequent to the acquisition date remain obligations of the previous owner. PinnOak records a provision for estimated postretirement benefits for employees not covered by the asset purchase agreement with the former owner based upon annual valuations.

Portman does not have employee retirement benefit obligations.

On September 12, 2006, our Board of Directors approved modifications to the pension benefits provided to salaried participants. The modifications retroactively reinstated the final average pay benefit formula (previously terminated and replaced with a cash balance formula in July 2003) to allow for additional accruals through June 30, 2008 or the continuation of benefits under an improved cash balance formula, whichever is greater. The change increased the projected benefit obligation, or PBO, by $15.1 million and pension expense by $1.1 million in 2006. On October 6, 2008, the USW ratified a new four-year labor contract, which replaces the labor agreement that expired on September 1, 2008. The new agreement covers approximately 2,300 USW-represented workers at our Empire and Tilden mines in Michigan, and our United Taconite and Hibbing mines in Minnesota. The changes enhanced the minimum pension formula by increasing the benefit dollar multipliers and renewed the lump sum special payments for certain employees retiring in the near future. The changes also included renewal of payments to surviving spouses of certain retirees. The result of the changes is an increase of $5.6 million in PBO and $1.8 million in 2008 pension expense.

Following is a summary of our defined benefit pension and OPEB funding and expense for the years 2006 through 2009:

 

     (In Millions)
     Pension    OPEB
     Funding    Expense    Funding    Expense

2006

   40.7    23.0    30.4    9.8

2007

   32.5    17.4    23.0    4.5

2008

   24.9    20.3    19.7    8.6

2009 (Estimated)

   32.1    48.3    35.3    23.2

Assumptions used in determining the benefit obligations and the value of plan assets for defined benefit pension plans and postretirement benefit plans (primarily retiree healthcare benefits) offered by the Company are evaluated periodically by management. Critical assumptions, such as the discount rate used to measure the benefit obligations, the expected long-term rate of return on plan assets, the medical care cost trend, and the rate of compensation increase are reviewed annually. Our 2008 discount rate of 6.00 percent remained consistent with 2007. We assumed a compensation increase of 4.0 percent in 2008 to determine both our pension and OPEB obligations. This compares with a rate of compensation increase of 4.13 percent for pension and 4.50 percent for OPEB in 2007. Additionally, on December 31, 2008, we adopted the IRS 2009 prescribed mortality tables (separate pre-retirement and postretirement) to determine the expected life of our plan participants, replacing the IRS static 2023/2015 tables. Following are sensitivities on estimated 2009 pension and OPEB expense of potential further changes in these key assumptions:

 

     Increase in 2009
     Expense
(In Millions)
     Pension    OPEB

Decrease discount rate .25 percent

   $ 1.3    $ 0.8

Decrease return on assets 1 percent

     4.4      1.1

Increase medical trend rate 1 percent

     N/A      5.6

 

77


Table of Contents

Changes in actuarial assumptions, including discount rates, employee retirement rates, mortality, compensation levels, plan asset investment performance, and healthcare costs, are determined by the Company based on analyses of actual and expected factors. Changes in actuarial assumptions and/or investment performance of plan assets can have a significant impact on our financial condition due to the magnitude of our retirement obligations. Refer to NOTE 9 — PENSIONS AND OTHER POSTRETIREMENT BENEFITS in Item 8 for further information.

Accounting for Business Combinations

In June 2008, we acquired an additional 4.8 percent interest in Portman through a share repurchase program offered by Portman, in which we did not participate. We subsequently made an off-market offer to purchase the outstanding shares and proceeded with a compulsory acquisition of the remaining shares to obtain full ownership of Portman in the fourth quarter of 2008. In addition, effective July 1, 2008, we acquired the remaining 30 percent interest in United Taconite. Upon consummation of the purchase, our ownership interest increased from 70 percent to 100 percent. Each of these transactions constituted a step acquisition of a non-controlling interest. In accordance with SFAS 141, Business Combinations, we accounted for the acquisition of the minority interests by the purchase method. As a result of each step acquisition, the then historical cost basis of the minority interest balance was reduced to the extent of the percentage interest sold, and the increased ownership obtained was accounted for by increasing the entity’s basis from historical cost to fair value for the portion of the assets acquired and liabilities assumed based on the additional ownership acquired.

We are in the process of conducting a valuation of the assets acquired and liabilities assumed related to each of the acquisitions, most notably, property, plant and equipment, mineral reserves, inventory and sales contracts, and the final allocation will be made when completed. Accordingly, allocation of the purchase price is preliminary and subject to modification in the future. In estimating the fair value of the assets acquired and liabilities assumed, we consider information obtained during our due diligence process and utilize various valuation methods, including a market approach, income approach or cost approach. Depending on the approach used, the valuation is performed based upon market prices, where available, the present value of estimated future cash flows, or comparisons to transactions for similar assets and liabilities. We are required to make subjective estimates in connection with these valuations and allocations.

Forward-Looking Statements

This report contains statements that constitute “forward-looking statements.” These forward-looking statements may be identified by the use of predictive, future-tense or forward-looking terminology, such as “believes,” “anticipates,” “expects,” “estimates,” “intends,” “may,” “will” or similar terms. These statements speak only as of the date of this report, and we undertake no ongoing obligation, other than that imposed by law, to update these statements. These statements appear in a number of places in this report and include statements regarding our intent, belief or current expectations of our directors or our officers with respect to, among other things:

 

   

trends affecting our financial condition, results of operations or future prospects;

 

   

uncertainty relating to contractual disputes with any of our customers;

 

   

estimates of our economic iron ore and coal reserves;

 

   

uncertainties relating to our ability to identify and consummate any strategic investments;

 

   

adverse changes in currency values;

 

   

uncertainties relating to contractual disputes with any of our significant energy, material or service providers;

 

   

the success of cost-savings efforts;

 

   

our business and growth strategies;

 

   

our financing plans and forecasts;

 

78


Table of Contents
   

labor relations;

 

   

uncertainties associated with unanticipated geological conditions related to underground mining; and

 

   

the potential existence of significant deficiencies or material weaknesses in internal controls over financial reporting that may be identified during the performance of testing under Section 404 of the Sarbanes-Oxley Act of 2002.

You are cautioned that any such forward-looking statements are not guarantees of future performance and involve significant risks and uncertainties, and that actual results may differ materially from those contained in the forward-looking statements as a result of various factors, some of which are unknown. For additional factors affecting the business of Cliffs Natural Resources Inc., see Item 1A. Risk Factors.

You are urged to carefully consider these risk factors. All forward-looking statements attributable to us are expressly qualified in their entirety by the foregoing cautionary statements.

 

Item 7A. Quantitative and Qualitative Disclosures About Market Risk.

Information regarding our Market Risk is presented under the caption Market Risk, which is included in Item 7 and is incorporated by reference and made a part hereof.

 

79


Table of Contents
Item 8. Financial Statements and Supplementary Data.

Statements of Consolidated Financial Position

Cliffs Natural Resources Inc. and Subsidiaries

 

     December 31
(In Millions)
     2008    2007

ASSETS

     

CURRENT ASSETS

     

Cash and cash equivalents

   $ 179.0    $ 157.1

Accounts receivable

     68.5      84.9

Inventories

     265.4      241.9

Supplies and other inventories

     101.2      77.0

Deferred and refundable taxes

     54.8      19.7

Derivative assets

     76.9      69.5

Other

     115.9      104.5
             

TOTAL CURRENT ASSETS

     861.7      754.6

PROPERTY, PLANT AND EQUIPMENT, NET

     2,456.1      1,823.9

OTHER ASSETS

     

Investments in ventures

     305.3      265.3

Marketable securities

     25.4      55.7

Intangible assets, net

     109.6      —  

Long-term receivables

     33.4      38.0

Prepaid pensions — salaried

     —        6.7

Deferred income taxes

     251.2      42.1

Deposits and miscellaneous

     68.4      89.5
             

TOTAL OTHER ASSETS

     793.3      497.3
             

TOTAL ASSETS

   $ 4,111.1    $ 3,075.8
             

See notes to consolidated financial statements.

 

80


Table of Contents

Statements of Consolidated Financial Position

Cliffs Natural Resources Inc. and Subsidiaries

 

     December 31
(In Millions)
 
     2008     2007  

LIABILITIES AND SHAREHOLDERS’ EQUITY

    

CURRENT LIABILITIES

    

Accounts payable

   $ 201.0     $ 149.9  

Accrued employment costs

     98.9       73.2  

Other postretirement benefits

     17.9       11.2  

Income taxes payable

     99.3       11.5  

State and local taxes payable

     45.5       33.6  

Below-market sales contracts — current

     30.3       —    

Environmental and mine closure obligations

     12.2       7.6  

Accrued expenses

     46.1       50.1  

Deferred revenue

     86.8       28.4  

Derivative liabilities

     194.3       1.4  

Other

     12.6       32.7  
                

TOTAL CURRENT LIABILITIES

     844.9       399.6  

POSTEMPLOYMENT BENEFIT LIABILITIES

    

Pensions

     250.1       90.0  

Other postretirement benefits

     197.9       114.8  
                

TOTAL POSTEMPLOYMENT BENEFIT LIABILITIES

     448.0       204.8  

ENVIRONMENTAL AND MINE CLOSURE OBLIGATIONS

     104.9       123.2  

DEFERRED INCOME TAXES

     67.3       189.0  

SENIOR NOTES

     325.0       —    

REVOLVING CREDIT FACILITY

     —         240.0  

TERM LOAN

     200.0       200.0  

BELOW-MARKET SALES CONTRACTS

     183.6       —    

CONTINGENT CONSIDERATION

     —         99.5  

DEFERRED PAYMENT

     —         96.2  

DERIVATIVE LIABILITIES

     34.3       —    

OTHER LIABILITIES

     149.1       107.3  
                

TOTAL LIABILITIES

     2,357.1       1,659.6  

MINORITY INTEREST

     3.3       117.8  

3.25% REDEEMABLE CUMULATIVE CONVERTIBLE PERPETUAL PREFERRED STOCK — ISSUED 172,500 SHARES 205 AND 134,715 OUTSTANDING IN 2008 AND 2007

     0.2       134.7  

SHAREHOLDERS’ EQUITY

    

Preferred stock — no par value

    

Class A — 3,000,000 shares authorized and unissued

    

Class B — 4,000,000 shares authorized and unissued

    

Common Shares — par value $0.125 per share

    

Authorized — 224,000,000 shares;

    

Issued — 134,623,528 shares; Outstanding — 113,508,990 shares

     16.8       16.8  

Capital in excess of par value of shares

     442.2       116.6  

Retained Earnings

     1,799.9       1,316.2  

Cost of 21,114,538 common shares in treasury (2007 — 47,455,922 shares)

     (113.8 )     (255.6 )

Accumulated other comprehensive loss

     (394.6 )     (30.3 )
                

TOTAL SHAREHOLDERS’ EQUITY

     1,750.5       1,163.7  
                

COMMITMENTS AND CONTINGENCIES

    
                

TOTAL LIABILITIES AND SHAREHOLDERS’ EQUITY

   $ 4,111.1     $ 3,075.8  
                

See notes to consolidated financial statements.

 

81


Table of Contents

Statements of Consolidated Operations

Cliffs Natural Resources Inc. and Subsidiaries

 

     (In Millions, Except Per Share
Amounts)
 
     Year Ended December 31,  
     2008     2007     2006  

REVENUES FROM PRODUCT SALES AND SERVICES

      

Product

   $ 3,294.8     $ 1,997.3     $ 1,669.1  

Freight and venture partners’ cost reimbursements

     314.3       277.9       252.6  
                        
     3,609.1       2,275.2       1,921.7  

COST OF GOODS SOLD AND OPERATING EXPENSES

     (2,449.4 )     (1,813.2 )     (1,507.7 )
                        

SALES MARGIN

     1,159.7       462.0       414.0  

OTHER OPERATING INCOME (EXPENSE)

      

Casualty recoveries

     10.5       3.2       —    

Royalties and management fee revenue

     21.7       14.5       11.7  

Selling, general and administrative expenses

     (188.6 )     (114.2 )     (72.4 )

Terminated acquisition costs

     (90.1 )     —         —    

Gain on sale of other assets — net

     22.8       18.4       —    

Miscellaneous — net

     2.9       (2.3 )     12.4  
                        
     (220.8 )     (80.4 )     (48.3 )
                        

OPERATING INCOME

     938.9       381.6       365.7  

OTHER INCOME (EXPENSE)

      

Changes in fair value of derivative instruments, net

     (188.2 )     —         —    

Impairment of securities

     (25.1 )     —         —    

Interest income

     26.2       20.0       17.2  

Interest expense

     (39.8 )     (22.6 )     (5.3 )

Other — net

     4.3       1.7       10.2  
                        
     (222.6 )     (0.9 )     22.1  
                        

INCOME FROM CONTINUING OPERATIONS BEFORE INCOME TAXES, MINORITY INTEREST AND EQUITY LOSS FROM VENTURES

     716.3       380.7       387.8  

PROVISION FOR INCOME TAXES

     (144.2 )     (84.1 )     (90.9 )

MINORITY INTEREST (net of tax of $9.1, $4.7, and $7.3 in 2008, 2007 and 2006)

     (21.2 )     (15.6 )     (17.1 )

EQUITY LOSS FROM VENTURES

     (35.1 )     (11.2 )     —    
                        

INCOME FROM CONTINUING OPERATIONS

     515.8       269.8       279.8  

INCOME FROM DISCONTINUED OPERATIONS (net of tax of $0.2 in 2007 and 2006)

     —         0.2       0.3  
                        

NET INCOME

     515.8       270.0       280.1  

PREFERRED STOCK DIVIDENDS

     (1.1 )     (5.2 )     (5.6 )
                        

INCOME APPLICABLE TO COMMON SHARES

   $ 514.7     $ 264.8     $ 274.5  
                        

EARNINGS PER COMMON SHARE — BASIC

      

Continuing operations

   $ 5.07     $ 3.19     $ 3.26  

Discontinued operations

     —         —         —    
                        

EARNINGS PER COMMON SHARE — BASIC

   $ 5.07     $ 3.19     $ 3.26  
                        

EARNINGS PER COMMON SHARE — DILUTED

      

Continuing operations

   $ 4.76     $ 2.57     $ 2.60  

Discontinued operations

     —         —         —    
                        

EARNINGS PER COMMON SHARE — DILUTED

   $ 4.76     $ 2.57     $ 2.60  
                        

AVERAGE NUMBER OF SHARES (IN THOUSANDS)

      

Basic

     101,471       82,988       84,144  

Diluted

     108,288       105,026       107,654  

See notes to consolidated financial statements.

 

82


Table of Contents

Statements of Consolidated Cash Flows

Cliffs Natural Resources Inc. and Subsidiaries

 

     (In Millions)  
     Year Ended December 31,  
     2008     2007     2006  

CASH FLOW FROM CONTINUING OPERATIONS
OPERATING ACTIVITIES

      

Net income

   $ 515.8     $ 270.0     $ 280.1  

Income from discontinued operations

     —         (0.2 )     (0.3 )

Adjustments to reconcile net income to net cash from operating activities:

      

Depreciation, depletion and amortization

     201.1       107.2       73.9  

Minority interest, net

     21.2       15.6       17.1  

Share-based compensation

     21.4       11.8       4.9  

Equity loss in ventures (net of tax)

     35.1       11.2       —    

Environmental and mine closure obligations

     3.7       1.3       (1.6 )

Pensions and other postretirement benefits

     (32.9 )     (35.4 )     (40.3 )

Deferred income taxes

     (88.5 )     (33.1 )     (4.8 )

Derivatives and currency hedges

     58.4       (15.4 )     (8.0 )

Impairment of securities

     25.1       —         —    

Gain on sale of assets

     (20.5 )     (17.9 )     (9.9 )

Property damage recoveries

     (10.5 )     —         —    

Excess tax benefit from share-based compensation

     (3.5 )     (4.3 )     (1.2 )

Casualty recoveries

     —         (3.2 )     —    

Proceeds from casualty recoveries