Table of Contents

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-K
ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the fiscal year ended December 31, 2017
OR
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from              to             .
Commission File Number: 1-8944
cliffslogo2017a01.jpg
CLEVELAND-CLIFFS INC.
(Exact Name of Registrant as Specified in Its Charter)
Ohio
 
34-1464672
(State or Other Jurisdiction of
Incorporation or Organization)
 
(I.R.S. Employer
Identification No.)
 
 
200 Public Square, Suite 3300, Cleveland, Ohio
 
44114-2315
(Address of Principal Executive Offices)
 
(Zip Code)
Registrant’s Telephone Number, Including Area Code: (216) 694-5700
Securities registered pursuant to Section 12(b) of the Act:
Title of Each Class
 
Name of Each Exchange on Which Registered
Common Shares, par value $0.125 per share
 
New York Stock Exchange
 
 
 
Securities registered pursuant to Section 12(g) of the Act: NONE
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.       YES             NO  
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.      YES              NO  
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.      YES              NO  
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Website, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).      YES              NO  
Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K (§229.405 of this chapter) is not contained herein, and will not be contained, to the best of registrant’s knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K.      
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and "emerging growth company" in Rule 12b-2 of the Exchange Act.
Large accelerated filer          Accelerated filer          Non-accelerated filer          Smaller reporting company          Emerging growth company  
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act).      YES              NO  
As of June 30, 2017, the aggregate market value of the voting and non-voting common shares held by non-affiliates of the registrant, based on the closing price of $6.92 per share as reported on the New York Stock Exchange — Composite Index, was $2,039,925,087 (excluded from this figure is the voting stock beneficially owned by the registrant’s officers and directors).
The number of shares outstanding of the registrant’s common shares, par value $0.125 per share, was 297,400,968 as of February 12, 2018.
DOCUMENTS INCORPORATED BY REFERENCE
Portions of the registrant’s proxy statement for its 2018 annual meeting of shareholders are incorporated by reference into Part III.



Table of Contents

TABLE OF CONTENTS
 
 
 
 
 
 
 
 
 
Page Number
 
 
 
 
 
 
DEFINITIONS
 
 
 
 
 
 
PART I
 
 
 
 
Item 1.
Business
 
 
 
 
Executive Officers of the Registrant
 
 
 
Item 1A.
Risk Factors
 
 
 
Item 1B.
Unresolved Staff Comments
 
 
 
Item 2.
Properties
 
 
 
Item 3.
Legal Proceedings
 
 
 
Item 4.
Mine Safety Disclosures
 
 
 
 
 
 
 
 
PART II
 
 
 
 
Item 5.
Market for Registrant's Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities
 
 
 
Item 6.
Selected Financial Data
 
 
 
Item 7.
Management's Discussion and Analysis of Financial Condition and Results of Operations
 
 
 
Item 7A.
Quantitative and Qualitative Disclosures About Market Risk
 
 
 
Item 8.
Financial Statements and Supplementary Data
 
 
 
Item 9.
Changes in and Disagreements With Accountants on Accounting and Financial Disclosure
 
 
 
Item 9A.
Controls and Procedures
 
 
 
Item 9B.
Other Information
 
 
 
 
 
 
PART III
 
 
 
 
Item 10.
Directors, Executive Officers and Corporate Governance
 
 
 
Item 11.
Executive Compensation
 
 
 
Item 12.
Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters
 
 
 
Item 13.
Certain Relationships and Related Transactions, and Director Independence
 
 
 
Item 14.
Principal Accountant Fees and Services
 
 
 
 
 
 
 
 
PART IV
 
 
 
 
Item 15.
Exhibits and Financial Statement Schedules
 
 
 
Item 16.
Form 10-K Summary
 
 
 
 
 
 
SIGNATURES
 
 


Table of Contents

DEFINITIONS
The following abbreviations or acronyms are used in the text. References in this report to the “Company,” “we,” “us,” “our” and “Cliffs” are to Cleveland-Cliffs Inc. and subsidiaries, collectively. References to “A$” or “AUD” refer to Australian currency, “C$” to Canadian currency and “$” to United States currency.
Abbreviation or acronym
 
Term
ABL Facility
 
Syndicated Facility Agreement by and among Bank of America, N.A., as Administrative Agent and Australian Security Trustee, the Lenders that are parties hereto, Cleveland-Cliffs Inc., as Parent and a Borrower, and the Subsidiaries of Parent party hereto, as Borrowers dated as of March 30, 2015, as amended
Adjusted EBITDA
 
EBITDA excluding certain items such as extinguishment/restructuring of debt, impacts of discontinued operations, foreign currency exchange remeasurement, severance and contractor termination costs, certain supplies inventory write-offs, impairment of other long-lived assets and intersegment corporate allocations of SG&A costs
AG
 
Autogenous Grinding
AK Steel
 
AK Steel Corporation (including its facilities in Ashland, Ohio, Middletown, Ohio and Dearborn, Michigan)
Algoma
 
Essar Steel Algoma Inc.
Amended 2015 Equity Plan
 
Cliffs Natural Resources Inc. Amended and Restated 2015 Equity and Incentive Compensation Plan

APBO
 
Accumulated Postretirement Benefit Obligation
ArcelorMittal
 
ArcelorMittal (as the parent company of ArcelorMittal Mines Canada, ArcelorMittal USA and ArcelorMittal Dofasco GP, as well as, many other subsidiaries)
ArcelorMittal USA
 
ArcelorMittal USA LLC (including many of its United States affiliates, subsidiaries and representatives. References to ArcelorMittal USA comprise all such relationships unless a specific ArcelorMittal USA entity is referenced)
ALJ
 
Administrative Law Judge
AMT
 
Alternative Minimum Tax
ASC
 
Accounting Standards Codification
ASU
 
Accounting Standards Updates
Bloom Lake
 
The Bloom Lake Iron Ore Mine Limited Partnership
Bloom Lake Group
 
Bloom Lake General Partner Limited and certain of its affiliates, including Cliffs Quebec Iron Mining ULC
BNSF
 
Burlington Northern Santa Fe, LLC
Canadian Entities
 
Bloom Lake Group, Wabush Group and certain other wholly-owned subsidiaries
CCAA
 
Companies' Creditors Arrangement Act (Canada)
CERCLA
 
Comprehensive Environmental Response, Compensation and Liability Act of 1980
CFR
 
Cost and freight
CLCC
 
Cliffs Logan County Coal LLC
Clean Water Act
 
Federal Water Pollution Control Act
CN
 
Canadian National Railway Company
CO2
 
Carbon Dioxide
Codification
 
FASB Accounting Standards Codification
Compensation Committee
 
Compensation and Organization Committee of Cliffs' Board of Directors
CPP
 
Clean Power Plan
Directors’ Plan
 
Cliffs Natural Resources Inc. Amended and Restated 2014 Nonemployee Directors’ Compensation Plan
Dodd-Frank Act
 
Dodd-Frank Wall Street Reform and Consumer Protection Act
DR-grade pellets
 
Direct Reduction pellets
EAF
 
Electric Arc Furnace
EBITDA
 
Earnings before interest, taxes, depreciation and amortization
Empire
 
Empire Iron Mining Partnership
EPA
 
U.S. Environmental Protection Agency
EPS
 
Earnings per share
ERM
 
Enterprise Risk Management
Exchange Act
 
Securities Exchange Act of 1934, as amended
FASB
 
Financial Accounting Standards Board
Fe
 
Iron
FERC
 
Federal Energy Regulatory Commission
FeT
 
Total Iron
FIP
 
Federal Implementation Plan
FMSH Act
 
U.S. Federal Mine Safety and Health Act 1977, as amended
GAAP
 
Accounting principles generally accepted in the U.S.
GHG
 
Greenhouse gas

1

Table of Contents

Abbreviation or acronym
 
Term
HBI
 
Hot Briquetted Iron
Hibbing
 
Hibbing Taconite Company, an unincorporated joint venture
Koolyanobbing
 
Collective term for the operating deposits at Koolyanobbing, Mount Jackson and Windarling
LIBOR
 
London Interbank Offered Rate
LIFO
 
Last-in, first-out
Long ton
 
2,240 pounds
LS&I
 
Lake Superior & Ishpeming Railroad Company
LTVSMC
 
LTV Steel Mining Company
Metric ton
 
2,205 pounds
MISO
 
Midcontinent Independent System Operator, Inc.
MMBtu
 
Million British Thermal Units
MPCA
 
Minnesota Pollution Control Agency
MPSC
 
Michigan Public Service Commission
Monitor
 
FTI Consulting Canada Inc.
NAAQS
 
National Ambient Air Quality Standards
Net ton
 
2,000 pounds
NO2
 
Nitrogen dioxide
NOx
 
Nitrogen oxide
Northshore
 
Northshore Mining Company
NPDES
 
National Pollutant Discharge Elimination System, authorized by the U.S. Clean Water Act
NYSE
 
New York Stock Exchange
Oak Grove
 
Oak Grove Resources, LLC
OPEB
 
Other postretirement employment benefits
OPEB cap
 
Medical premium maximums
PBO
 
Projected benefit obligation
Pinnacle
 
Pinnacle Mining Company, LLC
Platts 62% Price
 
Platts IODEX 62% Fe Fines Spot Price
Preferred Share
 
7.00% Series A Mandatory Convertible Preferred Stock, Class A, without par value
ROA
 
Return on asset
S&P
 
Standard & Poor's Rating Services, a division of Standard & Poor's Financial Services LLC, a subsidiary of The McGraw-Hill Companies, Inc., and its successors
SEC
 
U.S. Securities and Exchange Commission
SG&A
 
Selling, general and administrative
Seneca
 
Seneca Coal Resources, LLC
Silver Bay Power
 
Silver Bay Power Company
SIP
 
State Implementation Plan
SO2
 
Sulfur dioxide
SSR
 
System Support Resource
STRIPS
 
Separate Trading of Registered Interest and Principal of Securities
Tilden
 
Tilden Mining Company L.C.
TMDL
 
Total Maximum Daily Load
TSR
 
Total Shareholder Return
United Taconite
 
United Taconite LLC
U.S.
 
United States of America
U.S. Steel
 
United States Steel Corporation and all subsidiaries
USW
 
United Steelworkers
VEBA
 
Voluntary Employee Benefit Association trusts
VWAP
 
Volume Weighted Average Price
Wabush
 
Wabush Mines Joint Venture
Wabush Group
 
Wabush Iron Co. Limited and Wabush Resources Inc., and certain of their affiliates, including Wabush Mines (an unincorporated joint venture of Wabush Iron Co. Limited and Wabush Resources Inc.), Arnaud Railway Company and Wabush Lake Railway Company
2012 Equity Plan
 
Cliffs Natural Resources Inc. Amended and Restated 2012 Incentive Equity Plan
2015 Equity Plan
 
Cliffs Natural Resources Inc. 2015 Equity and Incentive Compensation Plan

2

Table of Contents

PART I
Item 1.
Business
Introduction
Founded in 1847, Cleveland-Cliffs Inc. is the largest and oldest independent iron ore mining company in the United States. We are a major supplier of iron ore pellets to the North American steel industry from our mines and pellet plants located in Michigan and Minnesota. Additionally, we operate an iron ore mining complex in Western Australia. By 2020, we expect to be the sole producer of HBI in the Great Lakes region with the development of our first production plant in Toledo, Ohio. Driven by the core values of safety, social, environmental and capital stewardship, our employees endeavor to provide all stakeholders with operating and financial transparency.
We are organized through a global commercial group responsible for sales and delivery of our products and operations groups responsible for the production of the iron ore that we market. Our continuing operations are organized according to geographic location: U.S. Iron Ore and Asia Pacific Iron Ore.
In the U.S., we currently own or co-own four operational iron ore mines plus one indefinitely idled mine. We are currently operating one iron ore mine in Michigan and three iron ore mines in Minnesota. All four mines are currently operating at or near full capacity. The Empire mine located in Michigan was indefinitely idled beginning in August 2016. Our Asia Pacific operations consist solely of our Koolyanobbing iron ore mining complex in Western Australia. Koolyanobbing is currently operating at a level appropriate for the current price discounting environment for low-grade iron ore products containing less than 62% Fe, and we expect mining operations to cease during 2018.
We are Focused on Protecting our Core U.S. Iron Ore Business
We are the market-leading iron ore producer in the U.S., supplying differentiated iron ore pellets under long-term contracts to major North American blast furnace steel producers. We have the unique advantage of being a low-cost, high-quality producer of iron ore pellets in the Great Lakes market with significant transportation and logistics advantages to serve the Great Lakes steel market effectively. The pricing structure and long-term nature of our existing contracts, along with our low-cost operating profile, position U.S. Iron Ore as a strong cash flow generator in most commodity pricing environments. Since instituting our strategy in 2014 of focusing on this core business, we have achieved significant accomplishments, including providing volume certainty by signing a ten-year supply agreement with our largest customer; substantially reducing operating costs by making operational improvements; and developing new pellet products to meet ever-evolving market demands.
We recognize the importance of our strength in the U.S. Iron Ore business, and our top strategic priority is to protect and enhance our market position. This involves continuing to deliver high-quality, custom-made pellets that allow our customers to remain competitive in the quality, production efficiency, and environmental friendliness of their steel products. Protecting the core business also involves continually evaluating opportunities to expand both our production capacity and ore reserve life. In 2017, we achieved key accomplishments toward these goals by acquiring the remaining minority stake in our Tilden and Empire mines as well as additional real estate interests in Minnesota.
Expanding our Customer Base
While we hold a strong market position in supplying iron ore to Great Lakes blast furnaces, we cannot ignore the ongoing shift of steelmaking share in the U.S. away from our core blast furnace customers to EAF steelmakers. Over the past 25 years, the market share of EAFs has nearly doubled. However, as EAFs have moved to higher value steel products, they require more high-quality iron ore-based metallics instead of scrap as raw material feedstock. As a result of this trend, one of our top strategic priorities is to become a critical supplier of the EAF market by providing these specialized metallics. In June 2017, we announced the planned construction of an HBI production plant in Toledo, Ohio. HBI is a specialized high-quality iron alternative to scrap that, when used as a feedstock, allows the EAF to produce more valuable grades of steel. We expect our HBI to partially replace the over 3 million metric tons of ore-based metallics that are imported into the Great Lakes every year from Russia, Ukraine, Brazil and Venezuela.
Our Toledo plant is expected to produce HBI at a rate of 1.6 million metric tons per year when brought to production in 2020. We expect that this will create additional demand for our DR-grade pellets of 2.5 million long tons. Not only does this production plant create another outlet for our high-margin pellets, but it also presents an attractive economic opportunity for us. As the only producer of DR-grade pellets in the Great Lakes and with access to abundant, low-cost natural gas, we will be in a unique position to serve clients in the region. In addition, the Toledo site is in close proximity to over 20 EAFs, giving us a natural competitive freight advantage over import competitors.

3

Table of Contents

Business Segments
Our Company’s continuing operations are organized and managed according to geographic location: U.S. Iron Ore and Asia Pacific Iron Ore.
Segment information reflects our business units, which are organized to meet customer requirements and global competition.  Financial information about our segments, including financial information about geographic areas, is included in Management's Discussion and Analysis of Financial Condition and Results of Operations and NOTE 2 - SEGMENT REPORTING.
U.S. Iron Ore
We are a major producer of iron ore pellets, primarily selling production from U.S. Iron Ore to integrated steel companies in the U.S. and Canada. We operate four iron ore mines: the Tilden mine in Michigan and the Northshore, United Taconite and Hibbing mines in Minnesota. The U.S.-based mines currently have an annual rated capacity of 27.4 million long tons of iron ore pellet production, representing 55% of total U.S. pellet production capacity. Based on our equity ownership in these mines, our share of the annual rated production capacity is currently 21.2 million long tons, representing 42% of total U.S. annual pellet capacity. The Empire mine located in Michigan, which historically had annual rated capacity of 5.5 million long tons, was indefinitely idled beginning in August 2016. During 2017, we acquired the remaining noncontrolling interest of the Empire and Tilden mines from ArcelorMittal and U.S. Steel, respectively.
The following chart summarizes the estimated annual pellet production capacity and percentage of total U.S. pellet production capacity for each of the respective iron ore producers as of December 31, 2017:
U.S. Iron Ore Pellet
Annual Rated Capacity Tonnage
 
 
Current Estimated Capacity
(Long Tons in Millions)1
 
Percent of Total U.S. Capacity
All Cliffs’ managed mines
 
27.4

 
54.9
%
Other U.S. mines
 
 
 
 
U.S. Steel’s Minnesota ore operations
 
 
 
 
Minnesota Taconite
 
14.3

 
28.7

Keewatin Taconite
 
5.4

 
10.8

Total U.S. Steel
 
19.7

 
39.5

ArcelorMittal USA Minorca mine
 
2.8

 
5.6

Total other U.S. mines
 
22.5

 
45.1

Total U.S. mines
 
49.9

 
100.0
%
 
 
 
 
 
1 Empire mine was excluded from the estimated capacity calculation as it is indefinitely idled.
Our U.S. Iron Ore production generally is sold pursuant to long-term supply agreements with various price adjustment provisions. For the year ended December 31, 2017, we produced a total of 25.5 million long tons of iron ore pellets. The 2017 U.S. Iron Ore production included 18.8 million long tons for our account and 6.7 million long tons on behalf of current and previous steel company partners of the mines. During 2016 and 2015, we produced a total of 23.4 million and 26.1 million long tons, respectively.
We produce various grades of iron ore pellets, including standard, fluxed and DR-grade, for use in our customers’ operations as part of the steelmaking process. The variation in grades of iron ore pellets results from the specific chemical and metallurgical properties of the ores at each mine, the requirements of end user's steelmaking process and whether or not fluxstone is added in the process. Although the grade or grades of pellets currently delivered to each customer are based on that customer’s preferences, which depend in part on the characteristics of the customer’s steelmaking operation, in certain cases our iron ore pellets can be used interchangeably. Standard pellets require less processing, are generally the least costly pellets to produce and are called “standard” because no ground fluxstone, such as limestone or dolomite, is added to the iron ore concentrate before turning the concentrate into pellets. In the case of fluxed pellets, fluxstone is added to the concentrate, which produces pellets that can perform at higher productivity levels in the customer’s specific blast furnace and will minimize the amount of fluxstone the customer may be required

4

Table of Contents

to add to the blast furnace. DR-grade pellets require additional processing to make a pellet that contains higher iron and lower silica content than a standard pellet. Unlike standard or fluxed pellets, DR-grade pellets are fed into a direct reduced iron facility, which then are converted into DRI or HBI, a high-quality raw material used to feed an EAF.
Additionally, as the EAF steel market continues to grow in the U.S., there is an opportunity for our iron ore to serve this market by providing pellets to the alternative metallics market to produce DRI, HBI and/or pig iron.  In 2016 and 2017, we produced and shipped industrial trials of low-silica DR-grade pellets, which were successfully processed in two customers' DRI reactors to produce a high-quality DRI product. By 2020, we expect to sell these low-silica DR-grade pellets to our own HBI facility in Toledo, Ohio.
Each of our U.S. Iron Ore mines is located near the Great Lakes. The majority of our iron ore pellets are transported via railroads to loading ports for shipment via vessel to blast furnace steelmakers in North America.
Our U.S. Iron Ore sales are influenced by seasonal factors in the first half of the year as shipments and sales are restricted due to closure of the Soo Locks and the Welland Canal on the Great Lakes because of winter weather. During the first quarter, we continue to produce our products, but we cannot ship most of those products via lake vessel until the conditions on the Great Lakes are navigable, which causes our first and second quarter inventory levels to rise. Our limited practice of shipping product to ports on the lower Great Lakes or to customers’ facilities prior to the transfer of title has somewhat mitigated the seasonal effect on first and second quarter inventories and sales under our current accounting policies, as shipment from this point to the customers’ operations is not limited by weather-related shipping constraints. At December 31, 2017 and 2016, we had 1.5 million long tons of pellets in inventory in the lower Great Lakes or at customers’ facilities.
Upon adoption of ASC 606 on January 1, 2018, the timing and pattern of revenue recognition will change for our U.S. Iron Ore segment. Due to the closure of the Soo Locks and the Welland Canal during the winter months, our revenues will be lower than historical levels during the first quarter and higher than historical levels during the remaining three quarters in future years. However, the total amount of revenue recognized during the year should remain substantially the same as under current GAAP. There will not be a material change in the pattern or timing of revenue recognition for Asia Pacific Iron Ore.
U.S. Iron Ore Customers
Our U.S. Iron Ore revenues primarily are derived from sales of iron ore pellets to the North American integrated steel industry, consisting primarily of three major customers. Generally, we have multi-year supply agreements with our customers. Sales volume under these agreements largely is dependent on customer requirements, and in certain cases, we are the sole supplier of iron ore to the customer. Historically, each agreement has contained a base price that is adjusted annually using one or more adjustment factors. Factors that could result in a price adjustment include changes in the Platts 62% Price, along with pellet premiums, published Platts international indexed freight rates and changes in specified Producer Price Indices, including those for industrial commodities, fuel and steel.
During 2017, 2016 and 2015, we sold 18.7 million, 18.2 million and 17.3 million long tons of iron ore product, respectively, from our share of production from our U.S. Iron Ore mines. Refer to Concentration of Customers below for additional information regarding our major customers.
Asia Pacific Iron Ore
Our Asia Pacific Iron Ore operations are located in Western Australia and consist solely of our wholly-owned Koolyanobbing operation.
The Koolyanobbing operation serves the Asian iron ore markets with direct-shipped fines and lump ore. The lump products are fed directly to blast furnaces, while the fines products are used as sinter feed. The variation in the two export product grades reflects the inherent chemical and physical characteristics of the ore bodies mined as well as the supply requirements of our customers. During 2017, 2016 and 2015, we produced 10.1 million, 11.8 million and 11.7 million metric tons, respectively.
Koolyanobbing is a collective term for the ore deposits at Koolyanobbing, Mount Jackson and Windarling. There are approximately 70 miles separating the three mining areas. Banded iron formations host the mineralization, which is predominately hematite and goethite. Each deposit is characterized with different chemical and physical attributes and, in order to achieve customer product quality, ore in varying quantities from each deposit must be blended together.

5

Table of Contents

Crushing and blending are undertaken at Koolyanobbing, where the crushing and screening plant is located. Once the blended ore has been crushed and screened into a direct lump and fines shipping product, it is transported by rail approximately 360 miles south to the Port of Esperance, via Kalgoorlie, for shipment to our customers in Asia.
Asia Pacific Iron Ore Customers
Asia Pacific Iron Ore’s production is under contract with steel companies primarily in China, Japan and South Korea. In March 2017, we extended the majority of our supply agreements with steel producers in China for one year. These contracts will expire in March 2018, and we will only renew contracts if it can be done in an economically viable manner. Our supply agreement with our client in South Korea expired in December 2017. We renewed that agreement for 2018; however, it is at a lower committed quantity than our previous agreement. Our supply agreements with our customers in Japan expire in March 2018. These contracts could be renewed for additional volume. Pricing for our Asia Pacific Iron Ore Chinese customers consists of shorter-term pricing mechanisms of various durations up to three months based on the average of daily spot prices that are generally associated with the time of unloading of each shipment. Pricing with our Japanese and South Korean customers is generally similar to the inputs used with our Chinese customers, but the pricing inputs are fixed before shipment.
During 2017, 2016 and 2015, we sold 9.8 million, 11.6 million and 11.6 million metric tons of iron ore, respectively, from our Koolyanobbing operation. No Asia Pacific Iron Ore customer comprised more than 10% of our consolidated sales in 2017, 2016 or 2015. The segment’s five largest customers together accounted for a total of 57%, 56% and 47% of Asia Pacific Iron Ore product revenues for the years 2017, 2016 and 2015, respectively.
Discontinued Operations
Prior to late March 2014, we operated two iron ore mines in Eastern Canada, the Bloom Lake mine and the Wabush Scully mine. In late March 2014, we idled our Wabush Scully mine in Newfoundland and Labrador and in November 2014, we began to implement the permanent closure plan for the mine. The idle and ultimate closure was driven by the unsustainable high-cost structure. In January 2015, we ceased active production at the Bloom Lake mine and the mine transitioned to "care-and-maintenance" mode. Together, the shutdown of the Wabush Scully mine and the cessation of operations at our Bloom Lake mine represented a complete curtailment of our Eastern Canadian Iron Ore operations.
Restructuring proceedings with respect to the Bloom Lake Group were commenced under the CCAA in the first quarter of 2015. During the second quarter of 2015, the CCAA protection granted to the Bloom Lake Group was extended to include the Wabush Group to facilitate the reorganization of each of their businesses and operations. As of December 31, 2017, CCAA proceedings are still ongoing. The Monitor appointed by the court in the CCAA proceedings for the Bloom Lake Group and the Wabush Group has conducted a claims process pursuant to which creditors have filed claims against the Bloom Lake Group and the Wabush Group. The Monitor is reviewing all claims filed as part of this claims process. Currently, there is uncertainty as to the amount of the distribution that will be made to the creditors of the Bloom Lake Group and the Wabush Group, including, if any, to us, and whether we could be held liable for claims that may be asserted by or on behalf of the Bloom Lake Group or the Wabush Group or by their respective representatives against non-debtor affiliates of the Bloom Lake Group and the Wabush Group. During 2017, we became aware that it was probable the Monitor will assert a preference claim against us and/or certain of our affiliates. Given that it is probable the claim will be asserted by the Monitor, we have recorded an estimated liability of $55.6 million, which includes the value of our related-party claims against the Bloom Lake Group and the Wabush Group. Should the Monitor proceed to assert the claim, we believe the Monitor will demand an amount in excess of the value of our related-party claims against the estate. Thus, it is possible that a change in the estimated liability may occur in the future. We deny liability for any amount and will vigorously defend such claim.
Financial results prior to the respective deconsolidations of the Bloom Lake and Wabush Groups and subsequent expenses directly associated with the Canadian Entities are included in our financial statements and classified within discontinued operations. Refer to NOTE 14 - DISCONTINUED OPERATIONS for further discussion of the Eastern Canadian Iron Ore segment discontinued operations and the status of the CCAA proceedings.
Unless otherwise noted, discussion of our business and results of operations in this Annual Report on Form 10-K refers to our continuing operations.
Applied Technology, Research and Development
We have been a leader in iron ore mining and process technology since inception and have been in operation for over 170 years.  We operated some of the first mines on Michigan’s Marquette Iron Range and pioneered early

6

Table of Contents

open-pit and underground mining methods.  From the first application of electrical power in Michigan’s underground mines to the use of today’s sophisticated computers and global positioning satellite systems, we have been a leader in the application of new technology to the centuries-old business of mineral extraction.  Today, our engineering and technical staffs are engaged in full-time technical support of our operations, improvement of existing products and development of new products.
We are a pioneer in iron ore pelletizing with over 60 years of experience.  We are able to produce customized pellets to meet each customer’s blast furnace specifications and produce both standard and fluxed pellets. Using our technical expertise and strong market position in the United States to increase our product offering, we have started producing DR-grade pellets.  In 2017 and 2016, we shipped low silica DR-grade pellets, which were successfully processed in multiple DRI reactors to produce a high-quality direct reduced iron product.
With our experienced technical professionals and unsurpassed reputation for our pelletizing technology, we continue to deliver a world-class quality product to our customers.  We are a pioneer in the development of emerging reduction technologies, a leader in the extraction of value from challenging resources and a front runner in the implementation of safe and sustainable technology.  Our technical experts are dedicated to excellence and deliver superior technical solutions tailored to our customer base. We will continue to use this pioneering mentality in the development of our HBI facility in Toledo, Ohio. Similar to the market shift to pellets over 60 years ago, we recognize the need to serve the growing EAF market.
Concentration of Customers
In 2017 and 2016, two customers individually accounted for more than 10% of our consolidated product revenue and in 2015, three customers individually accounted for more than 10% of our consolidated product revenue. Product revenue from those customers represented in the chart below totaled $1.3 billion, $1.1 billion and $1.3 billion of our total consolidated product revenue in 2017, 2016 and 2015, respectively, and is attributable to our U.S. Iron Ore business segment. The following represents sales revenue from each of these customers as a percentage of our total consolidated product revenue, as well as the portion of product sales for U.S. Iron Ore that is attributable to each of these customers for those years:
 
 
 
Percentage of Total
Product Revenue
 
Percentage of U.S. Iron Ore
Product Revenue
Customer1
 
2017
 
2016
 
2015
 
2017
 
2016
 
2015
ArcelorMittal
 
38%
 
37%
 
37%
 
48%
 
51%
 
49%
AK Steel
 
23%
 
19%
 
21%
 
29%
 
27%
 
29%
Algoma2
 
9%
 
4%
 
12%
 
11%
 
5%
 
15%
 
1 Includes subsidiaries.
2 On October 5, 2015, we terminated the long-term agreement with Algoma; however, we entered into certain short-term contracts with Algoma throughout 2016. On May 16, 2016, we reinstated our agreement with Algoma, which took effect in January 2017.
ArcelorMittal
Historically, our pellet supply agreements with ArcelorMittal USA were based on customer requirements, except for the Indiana Harbor East facility, which is based on customer contract obligations. The legacy agreements with ArcelorMittal USA expired at the end of December 2016 and January 2017. The parties executed a new long-term agreement, which became effective October 31, 2016, for the sale and delivery of ArcelorMittal USA’s annual tonnage requirements that fall within a specific range of volume. This latest agreement expires at the end of December 2026.
ArcelorMittal USA is a 62.3% equity participant in Hibbing. During 2017, we acquired the 21% ownership interest of ArcelorMittal USA in Empire as part of an agreement to distribute the noncontrolling interest net assets of the mine.
In 2017, 2016 and 2015, our U.S. Iron Ore pellet sales to ArcelorMittal were 8.4 million, 9.7 million and 9.7 million long tons, respectively.

7

Table of Contents

AK Steel
In August 2013, we entered into a new agreement with AK Steel to provide iron ore pellets to AK Steel for use in its Middletown, Ohio and Ashland, Kentucky blast furnace facilities. This contract includes minimum and maximum tonnage requirements for each year between 2014 and 2023.
In 2015 we entered into an amended and restated agreement with AK Steel after it acquired Severstal Dearborn, LLC, under which we supply all of the Dearborn, Michigan facility’s blast furnace pellet requirements through 2022, subject to specified minimum and maximum requirements in certain years.
In 2017, 2016 and 2015, our U.S. Iron Ore pellet sales to AK Steel were 5.6 million, 4.5 million and 4.3 million long tons, respectively.
Algoma
Algoma is a Canadian steelmaker whose common shares are owned by Essar Steel Holdings Limited. We had a long-term supply agreement under which we were Algoma’s sole supplier of iron ore pellets through the end of 2016. Under the terms of a 2016 settlement and through Algoma's CCAA proceedings, Algoma agreed to assume the long-term supply agreement that runs through 2024. Additionally, we entered into agreements with Algoma to purchase from us incremental tonnage that equates to Algoma's 2015 through 2017 annual iron ore pellet consumption. These agreements began in 2017 and 2018 and run through December 2020.
In 2017, 2016 and 2015, our U.S. Iron Ore pellet sales to Algoma were 2.5 million, 1.2 million and 2.5 million long tons, respectively.
Competition
Throughout the world, we compete with major and junior mining companies, as well as steel companies, both of which produce steelmaking raw materials, including iron ore.
North America
In our U.S. Iron Ore business segment, we primarily sell our product to steel producers with operations in North America. We compete directly with steel companies that own interests in iron ore mines in the United States and/or Canada, including ArcelorMittal and U.S. Steel, and with major iron ore pellet exporters from Eastern Canada and Brazil.
A number of factors beyond our control affect the markets in which we sell our iron ore. Continued demand for our iron ore and the prices obtained by us primarily depend on the consumption patterns of the steel industry in the U.S., China and elsewhere around the world, as well as the availability, location, cost of transportation and competing prices.
Asia Pacific
In our Asia Pacific Iron Ore business segment, we export iron ore products to the Asia Pacific markets, including China, Japan, and South Korea. In the Asia Pacific marketplace, we compete with major iron ore exporters primarily from Australia and Brazil. These include BHP Billiton, Fortescue Metals Group Ltd., Rio Tinto plc and Vale SA, among others.
Competition in steelmaking raw materials is predicated upon the usual competitive factors of price, availability of supply, product quality and performance, service and transportation cost to the consumer of the raw materials.
Environment
Our mining activities are subject to various laws and regulations governing the protection of the environment. We conduct our operations in a manner that is protective of public health and the environment and believe our operations are in compliance with applicable laws and regulations in all material respects.
Environmental issues and their management continued to be an important focus at each of our operations throughout 2017. In the construction of our facilities and in their operation, substantial costs have been incurred and will continue to be incurred to comply with regulatory requirements and avoid undue effect on the environment. Our capital expenditures relating to environmental matters totaled approximately $21 million, $15 million and $17 million, in 2017, 2016 and 2015, respectively. Approximately $5 million of the 2015 capital expenditures relating to environmental matters was attributable to the North American Coal operations that were sold during December 2015. It is estimated

8

Table of Contents

that capital expenditures for environmental improvements will total approximately $11 million in 2018, which is related to our U.S. Iron Ore operations for various water treatment, air quality, dust control, tailings management, selenium management and other miscellaneous environmental projects.
Regulatory Developments
Various governmental bodies continually promulgate new or amended laws and regulations that affect us, our customers and our suppliers in many areas, including waste discharge and disposal, the classification of materials and products, air and water discharges and many other environmental, health and safety matters. Although we believe that our environmental policies and practices are sound and do not expect that the application of any current laws or regulations reasonably would be expected to result in a material adverse effect on our business or financial condition, we cannot predict the collective adverse impact of the expanding body of laws and regulations.
Specifically, there are several notable proposed or potential rulemakings or activities that could have a material adverse impact on our facilities in the future depending on their ultimate outcome: Minnesota's proposed amendments to the sulfate wild rice water quality standard; evolving water quality standards for sulfate, selenium, and conductivity; scope of the Clean Water Act and the definition of “Waters of the United States”; Minnesota's Mercury TMDL and associated rules governing mercury air emission reductions; Climate Change and GHG Regulation; Regional Haze FIP Rule; NO2 and SO2 NAAQS; and increased administrative and legislative initiatives related to financial assurance obligations for CERCLA, mining and reclamation obligations.
Minnesota’s Proposed Amendments to the Sulfate Wild Rice Water Quality Standard
The Minnesota Legislature provided $1.5 million in 2011 for a study to gather additional information about the effects of sulfate and other substances on the growth of wild rice and to support an update to the sulfate wild rice water quality standard originally adopted in 1973 by the MPCA. The MPCA contracted with the University of Minnesota to conduct several research projects as part of this study. Concurrently, the Minnesota Chamber of Commerce contracted an independent lab to conduct companion research on the impacts of sulfate on wild rice. In August 2017, MPCA released proposed amendments of the sulfate water quality standard applicable to wild rice and identification of wild rice waters, which included a proposed sulfate wild rice water quality standard, a proposed list of waters where the standard would apply, and criteria for adding waters to that list. The proposed wild rice water quality standard is an equation that utilizes measured sediment parameters to calculate a sulfate water quality standard protective of wild rice unique to each water body where the standard applies. The independent research conducted by the independent lab contracted by the Minnesota Chamber of Commerce does not directly support the validity of the MPCA’s proposed approach. On January 11, 2018, the proposed rule was substantially disapproved by an ALJ and included a recommendation for MPCA to retain the existing 10 mg/L sulfate standard until MPCA addresses concerns identified in the ALJ report. These findings are not binding on the MPCA. The rulemaking has a legislated deadline for completion of January 15, 2019. Due to the proposed standard being based on measured sediment parameters, uncertainty regarding to which waters the standard will apply, and the non-binding disapproval from the ALJ, the impact of the proposed wild rice water quality standard to us is not estimable at this time but it could have an adverse material impact if we are required to significantly reduce sulfate in our discharges.
Conductivity
Conductivity, the measurement of water’s ability to conduct electricity, is a surrogate parameter that generally increases as the amount of dissolved minerals in water increases. In 2011, the EPA issued A Field-Based Aquatic Life Benchmark for Conductivity in Central Appalachian Streams, which established a recommended conductivity benchmark of 300 µS/cm for the region. The issuance of a benchmark outside of the established rulemaking process was subsequently the subject of litigation in 2012 where the court ruled the benchmark is nothing more than a non-binding suggestion. Three years later in Ohio Valley Environmental Coalition, et al. v. Elk Run Coal Co., et al., 3:12-cv-00785 (S.D. W. Va.), a judicial decision held that levels of conductivity higher than the EPA’s benchmark constituted a violation of the state’s narrative water quality standards, were unsupported by science and contrary to decisions previously made by the West Virginia Department of Environmental Protection and the West Virginia Supreme Court. In 2015, a group filed a petition with EPA Region 5 alleging that Minnesota was failing to implement properly the state NPDES program, and one of the various allegations asserts that MPCA should be assessing compliance with the state’s narrative water quality standard against the EPA’s conductivity benchmark for the Central Appalachian region. On December 30, 2015, the EPA provided MPCA a draft of the Protocol for Responding to Issues Related to Permitting and Enforcement which indicates that EPA staff will be reviewing available scientific basis in peer reviewed literature as well as promulgated standards. In February 2016, EPA's Office of Research and Development endorsed use of the Field-Based Conductivity Benchmark in northeast Minnesota indicating that a value of 320 µS/cm was appropriate to protect aquatic life. On

9

Table of Contents

December 23, 2016, EPA issued a notice soliciting public comments on its draft document, Field-Based Methods for Developing Aquatic Life Criteria for Specific Conductivity. According to EPA, once this document is final, states and authorized tribes located in any region of the country may use the methods to develop field-based specific conductivity criteria for adoption into water quality standards. In April 2017, comments were submitted by our trade associations providing objective evidence indicating the draft methodology was scientifically flawed and unfit for promulgation. Adoption of this methodology is not certain due to significant concerns with respect to the scientific validity of the proposed method which is now under intense review by scientists working for various trade associations. Because the outcome of the Region 5 Petition is uncertain and the proposed Field-Based Methods for Developing Aquatic Life Criteria for Specific Conductivity is only draft guidance at this time, the exact nature and certainty of the potential risk to us cannot be predicted; however, direct application of the 320 µS/cm benchmark to our Minnesota-based assets may have a material adverse impact if the conductivity benchmark is applied to our NPDES permits.
Definition of “Waters of the United States” Under the Clean Water Act
In June 2015, the EPA and Army Corps of Engineers promulgated the rule, “Definition of ‘Waters of the United States’ Under the Clean Water Act,” which attempted to add clarity to which waters are jurisdictional under the federal Clean Water Act, and will apply to all Clean Water Act programs, including certain permitting programs, spill prevention programs and a state certification process.  It is unclear how the federal and state agencies will implement and enforce the final rule, and how the courts will interpret it going forward. The regulation may expand EPA’s authority under the Clean Water Act to many traditionally unregulated mine features such as mine pits, pit lakes, on-site ditches, water retention structures, and tailings basins creating a new burden on our U.S. facilities.  This could be further interpreted to add questionable regulatory authority over the groundwater connections between these features and nearby traditionally navigable waters.  In October 2015, the U.S. Court of Appeals for the Sixth Circuit issued a nationwide stay of this rule while the jurisdiction and legality of the rule are decided in court. In January 2017, the U.S. Supreme Court granted certiorari to reconsider the Sixth Circuit's decision that it has jurisdiction to hear challenges. We are actively participating in the rulemaking development and assessing the potential impacts to our operations. Any impacts to us are not estimable at this time as the rule is being litigated, and the impacts will not be known until the rule is finally implemented.
The “Executive Order on Restoring the Rule of Law, Federalism, and Economic Growth by Reviewing the ‘Waters of the United States’ Rule” ("Executive Order") was signed by the President on February 28, 2017. This Executive Order instructs EPA and the Army Corps of Engineers to review the Clean Water Rule and “publish for notice and comment a proposed rule rescinding or revising the rule.” The Executive Order further directs that they “shall consider interpreting the term ‘navigable waters’” in a manner “consistent with Justice Scalia’s opinion” in Rapanos v. United States (2006). The EPA and Army Corps of Engineers are in the process of conducting rulemaking, soliciting comments, and holding public meetings in accordance with the Executive Order. Any impacts to us are not estimable at this time as the EPA and Army Corps of Engineers have only begun to implement the Executive Order.
Selenium Discharge Regulation
In Michigan, Empire and Tilden have implemented compliance plans to manage selenium according to the permit conditions. Empire and Tilden submitted the first permit-required Selenium Storm Water Management Plan to the Michigan Department of Environmental Quality ("MDEQ") in December 2011 and have updated it annually as required. The Selenium Storm Water Management Plans have outlined the activities that have been undertaken to address selenium in storm water discharges from our Michigan operations including an assessment of potential impacts to surface and groundwater. The remaining infrastructure needed for implementation of the storm water collection and conveyance system was completed in 2017 and cost approximately $8 million. A storm water treatment system for both facilities is anticipated sometime before 2028. The cost of the future treatment systems could be significant, although we are continuing to assess and develop cost effective and sustainable treatment technologies.
Tilden's NPDES permit contains a compliance schedule for selenium with a final effluent limit of 5.1 µg/l that became effective as of November 1, 2017, at Tilden's Gribben Tailings Basin outfall.  Tilden's 2017 expenditures totaled approximately $3 million for infrastructure necessary to meet the selenium effluent limit.
In July 2016, the EPA published new selenium fish tissue limits and lower lentic and lotic water column concentration criteria, which may someday increase the cost for treatment should MDEQ adopt these new standards in lieu of the existing limits established under the Great Lakes Initiative. Accordingly, we cannot reasonably estimate the timing or long-term impact of the water quality criteria to our business. 

10

Table of Contents

Mercury TMDL and Minnesota Taconite Mercury Reduction Strategy
Since the 1990’s the taconite industry has voluntarily reduced and removed mercury products and supported development of mercury emission reduction technology. While TMDL regulations are contained in the Clean Water Act, in 2007, Minnesota developed a Statewide Mercury TMDL which set an objective for 93% mercury air emission reductions from 1990 levels for sources within Minnesota. The State of Minnesota has acknowledged that approximately 90% of the mercury entering the state’s airshed is from other national and international sources.
In September 2014, Minnesota promulgated the Mercury Air Emissions Reporting and Reduction Rule mandating mercury air emissions reporting and reductions from certain sources. The rule is applicable to all of our Minnesota operations and requires submittal of a Mercury Reduction Plan to reduce mercury emissions from taconite furnaces by 72% by January 2025. The Mercury Reduction Plans must be submitted by December 31, 2018. One of the main tenets agreed upon for evaluating potential mercury reduction technologies during TMDL implementation and 2014 rule development proceedings was that the selected technology would meet the following “Adaptive Management Criteria”: the technology must be technically feasible; must be economically feasible; must not impact pellet quality; and must not cause excessive corrosion in pellet furnaces, associated duct work and existing wet scrubbers on the furnaces. However, the final 2014 rule does not explicitly include all four Adaptive Management Criteria for evaluating mercury reduction technologies, which were agreed upon in Minnesota’s October 2009 Mercury TMDL Implementation Plan.
There is currently no proven technology to cost effectively reduce mercury emissions from taconite furnaces to the target level of 72% that would meet all four Adaptive Management Criteria. We remain concerned about the technical and economic feasibility to reduce taconite mercury emissions by 72% without impacting existing operations or other environmental permit obligations. We are in the process of conducting detailed engineering analysis and potential technology testing to determine the impact of the regulations on each unique taconite furnace affected by this rule. The results of this analysis will guide further dialogue with the MPCA regarding development of the 2018 Mercury Reduction Plans. Potential impacts to us are not estimable at this time as the development of potential mercury reduction technology remains in its early stages.
Climate Change and GHG Regulation
With the complexities and uncertainties associated with the U.S. and global navigation of the climate change issue as a whole, one of our potentially significant risks for the future is mandatory carbon pricing obligations. Policymakers are in the design process of carbon regulation at the state, regional, national and international levels. The current regulatory patchwork of carbon compliance schemes presents a challenge for multi-facility entities to identify their near-term risks. Amplifying the uncertainty, the dynamic forward outlook for carbon pricing obligations presents a challenge to large industrial companies to assess the long-term net impacts of carbon compliance costs on their operations. Our exposure on this issue includes both the direct and indirect financial risks associated with the regulation of GHG emissions, as well as potential physical risks associated with climate change. We are continuing to review the physical risks related to climate change utilizing our formal ERM process. As an energy-intensive business, our GHG emissions inventory includes a broad range of emissions sources, such as iron ore furnaces and kilns, diesel mining equipment and our wholly owned Silver Bay power generation plant, among others. As such, our most significant regulatory risks are: (1) the costs associated with on-site emissions levels (direct impacts), and (2) indirect costs passed through to us from electrical and fuel suppliers (indirect impacts).
Internationally, mechanisms to reduce emissions are being implemented in various countries, with differing designs and stringency, according to resources, economic structure and politics. We expect that momentum to extend carbon regulation will continue with implementation of the Paris climate agreement that was adopted in 2015, the aim of which is to keep the increase in global average temperature to below two degrees Celsius. Continued political attention to issues concerning climate change, the role of human activity in it and potential mitigation through regulation may have a material impact on our customer base, operations and financial results in the future.
In the U.S., federal carbon regulation potentially presents a significantly greater impact to our operations. To date, the U.S. Congress has not legislated carbon constraints. In the absence of comprehensive federal carbon legislation, numerous state, regional, and federal regulatory initiatives are under development or are becoming effective, thereby creating a disjointed approach to GHG control and potential carbon pricing impacts. In May 2010, the EPA promulgated the GHG Tailoring Rule establishing a mechanism for regulating GHG emissions from facilities through the Prevention of Significant Deterioration permitting program under the Clean Air Act. Under the GHG Tailoring Rule, as modified by a 2014 U.S. Supreme Court decision upholding some components of the rule, new projects that increase GHG emissions by a significant amount (generally more than 75,000 long tons of CO2 emissions per year) and significantly increase emissions of at least one non-GHG criteria pollutant are subject to the Prevention of Significant

11

Table of Contents

Deterioration requirements, including the installation of best available control technology. We do not expect the Tailoring Rule provision to have a material adverse effect on our business in the near term and we cannot reliably estimate the long-term impact of the regulation.
In June 2013, President Obama issued a memorandum directing EPA to develop carbon emission standards for both new and existing power plants under the Clean Air Act's New Source Performance Standards ("NSPS"). In October 2015, EPA promulgated a CPP which consists of NSPS regulating carbon dioxide from existing power plants at a level of approximately 32% below 2005 levels by 2030. The CPP would not regulate combined heat and power generating facilities such as at Northshore's Silver Bay Power. The CPP directed states to submit SIPs to EPA by September 2016, but on February 9, 2016, the U.S. Supreme Court stayed the CPP immediately halting implementation. In March 2017, President Trump signed the Energy Independence Executive Order which called for, among other things, a review of the CPP and, if appropriate, reconsideration proceedings to suspend, revise, or rescind the rule. On the same day, Administrator Pruitt signed a notice indicating EPA’s intent to review and, if appropriate, to propose to revise or rescind the CPP. The U.S. Court of Appeals for the D.C. Circuit has been holding CPP litigation in abeyance since April 2017. On October 10, 2017, following a review as directed by President Trump’s Energy Independence Executive Order, the EPA proposed a rule to repeal the CPP and accepted comments on the proposed rule until January 16, 2018. The ultimate outcome of these carbon emission standards is not expected in the near term.
Due to the EPA's Tailoring Rule and potential patchwork state or regional carbon restriction schemes, our business and customer base could suffer negative financial impacts over time as a result of increased energy, environmental and other costs to comply with the limitations that would be imposed on GHG emissions. We believe our exposure can be reduced substantially by numerous factors, including currently contemplated regulatory flexibility mechanisms, such as allowance allocations, fixed process emissions exemptions, offsets and international provisions; emissions reduction opportunities, including energy efficiency, biofuels, fuel flexibility, emerging shale gas, coal mine methane offset reduction; and business opportunities associated with pursuing combined heat and power partnerships and new products, including DR-grade pellets, fluxed pellets and other efficiency-improving technologies.
We have worked proactively to develop a comprehensive, enterprise-wide GHG management strategy aimed at considering all significant aspects associated with GHG initiatives to plan effectively for and manage climate change issues, including risks and opportunities as they relate to the environment; stakeholders, including shareholders and the public; legislative and regulatory developments; operations; products and markets.
Regional Haze FIP Rule
In June 2005, the EPA finalized amendments to its regional haze rules. The rules require states to establish goals and emission reduction strategies for improving visibility in all Class I national parks and wilderness areas to natural background levels by 2064. Among the states with Class I areas are Michigan and Minnesota, in which we currently own and manage mining operations. The first phase of the regional haze rule required analysis and installation of Best Available Retrofit Technology ("BART") on eligible emission sources and incorporation of BART and associated emission limits into SIPs.
EPA disapproved Minnesota's and Michigan's SIPs for taconite furnaces and instead promulgated a Taconite Regional Haze FIP in February 2013. We, along with other stakeholders, petitioned the Eighth Circuit Court of Appeals for a review of the FIP, and in May 2013, we filed a joint motion for stay of the 2013 FIP, which was granted in June 2013. We, along with the other stakeholders, reached a settlement agreement with EPA to resolve certain items in the 2013 FIP. The settlement agreement, which was published in the Federal Register in January 2015 and fully executed in April 2015, prompted EPA to grant partial reconsideration of the 2013 FIP in July 2015. Subsequently, EPA published a FIP revision final rule to implement components of the settlement agreement in April 2016, with an effective date of May 12, 2016. We believe the 2016 Regional Haze FIP reflects progress toward a more technically and economically feasible regional haze implementation plan. In November 2016, the Eighth Circuit Court of Appeals terminated the June 2013 stay and extended the deadlines in the original 2013 FIP. Cost estimates associated with implementation of the 2013 and 2016 FIPs are reflected in our five-year capital plan.
Due to inconsistencies in language describing the procedures for calculating NOx emission limits between the settlement agreement and the 2016 FIP final rule, we jointly filed a Petition for Reconsideration and Petition for Judicial Review in June 2016. We have been working toward a settlement agreement with EPA to resolve the outstanding issue with the emission limit calculation method and anticipate resolution of the issue in 2018. The outcome of this proceeding is not expected to have a material adverse impact to the business.

12

Table of Contents

NO2 and SO2 NAAQS
During the first half of 2010, EPA promulgated rules that required each state to use a combination of air quality monitoring and computer modeling to determine each state's attainment classification status against new one-hour NO2 and SO2 NAAQS. During the third quarter of 2011, the EPA issued guidance to the regulated community on conducting refined air quality dispersion modeling and implementing the new NO2 and SO2 standards. In 2012, Minnesota issued Administrative Orders ("AOs") requiring taconite facilities to conduct modeling to demonstrate compliance with the NO2 and SO2 NAAQS pursuant to the Taconite Regional Haze SIP Long Term Strategy ("LTS"). Compliance with the LTS modeling demonstrations was originally set for June 30, 2017, but Minnesota has not advanced work on its 2012 AOs and is expected to remove NAAQS modeling obligations under the LTS in light of reduction in haze emissions associated with implementation of the taconite Regional Haze FIP regulations.
All of our operations in Minnesota and Michigan are expected to be in attainment for NO2 and SO2 NAAQS without incurring additional capital investment. While we will continue to monitor these developments and assess potential impacts, we do not anticipate further capital investments will be necessary to address NO2 and SO2 NAAQS requirements at this time.
CERCLA 108(b)
In December 2016, EPA published a proposed amendment to CERCLA section 108(b) which is focused on developing financial assurance for managing hazardous substances in the hardrock mining industry. EPA had a court-mandated deadline for publication of the final rule by December 1, 2017. The proposed rule would have required hardrock mining facilities to calculate their level of financial responsibility based on a formula included in the rule, secure an instrument or otherwise self-insure for the calculated amount, demonstrate to EPA the proof of the security, and maintain the security until EPA releases facilities from the CERCLA 108(b) regulations. The iron mining industry notified EPA of several errors upon which EPA drafted the rule, including a mistaken reliance on reporting data from a wholly different industry sector (iron and steel toxic release inventory reporting). We also participated in developing industry specific and national trade association comments and advocating directly with EPA and the White House Office of Management & Budget to address this and other errors with goals of exempting iron ore mining from CERCLA 108(b) applicability and correcting other deficiencies with the proposed rule. On December 1, 2017 EPA signed a federal register notice of EPA's decision not to issue final regulations for financial responsibility requirements for the hardrock mining industry under section 108(b) of CERCLA because EPA determined that the risks associated with these facilities' operations are addressed by existing federal and state programs and regulations and modern industry practices.
Energy
Electricity
As of February 2015, Wisconsin Electric Power Company is the sole supplier of electric power to our Tilden mine. During April 2015, the Tilden mine executed a special electricity contract with Wisconsin Electric Power Company. The term of the contract is through 2019. Wisconsin Electric Power Company provides 170 megawatts of electricity to Tilden at special rates that are regulated by the MPSC. The pricing under these contracts is generally fixed except Tilden is subject to frequent changes in Wisconsin Electric Power Company's power supply adjustment factor. During August 2016, Tilden executed a new 20-year special contract with Wisconsin Electric that is anticipated to start on January 1, 2020.
Tilden and Empire may also incur additional liabilities depending on the outcome of various proceedings concerning MISO's revised cost allocation methodology for continued operation of the Presque Isle Power Plant in Michigan. If FERC's award of SSR costs based on a revised cost allocation methodology applied retroactively is affirmed by the U.S. Court of Appeals for the District of Columbia Circuit, this could result in a cash payment of $12.3 million related to our Tilden mine and our indefinitely-idled Empire mine. As of December 31, 2017, this liability is included in our Statements of Consolidated Financial Position as part of Accrued expenses. Refer to NOTE 20 - COMMITMENTS AND CONTINGENCIES for further discussion of the Michigan Electricity Matters.
Minnesota Power supplies electric power to the Hibbing and United Taconite mines. During September 2008, Hibbing finalized an agreement with terms from November 2008 through December 2015. The agreement was approved by the Minnesota Public Utilities Commission ("MPUC") in 2009. The terms of the agreement included an automatic five-year extension that began January 2016. The United Taconite mine executed a new ten-year agreement with Minnesota Power that also included the Babbitt Mine. This agreement was finalized in May 2016 and was approved by the MPUC in November 2016.

13

Table of Contents

Silver Bay Power, a wholly-owned subsidiary with a 115 megawatt power plant, is able to provide the majority of Northshore’s electrical energy requirements. Silver Bay Power has an interconnection agreement with Minnesota Power for backup power when excess generation is necessary. In May 2016, Silver Bay Power entered into an agreement with Minnesota Power to purchase roughly half of Northshore's electricity needs from Minnesota Power through 2019. On January 1, 2020, Silver Bay Power will purchase 100% of the electricity requirements of Northshore from Minnesota Power and Silver Bay Power plans to idle both of its generating units except under certain circumstances.
Koolyanobbing and its associated satellite mine deposits draw power from independent diesel-fueled power stations and generators. Diesel power generation capacity has been installed at the Koolyanobbing operations.
Process and Diesel Fuel
We have a long-term contract providing for the transport of natural gas on the Northern Natural Gas Pipeline for our U.S. Iron Ore operations. Tilden has the capability of burning natural gas, coal or, to a lesser extent, oil. Hibbing and Northshore have the capability to burn natural gas and oil. United Taconite has the ability to burn coal, natural gas and petroleum coke. Consistent with 2017, we expect during 2018 our U.S. Iron Ore operations will utilize both natural gas and coal to heat furnaces and produce power at our Silver Bay Power facility.
All of our mines utilize diesel fuel mainly for our mobile fleet. Thompson Gas supplies diesel fuel to all of our U.S. Iron Ore locations from the Husky refinery in Superior, Wisconsin. Our U.S. Iron Ore locations are contracted with Thompson Gas through the end of 2018.
Employees
As of December 31, 2017, we had a total of 2,938 employees.
 
 
2017
 
2016
 
2015
U.S. Iron Ore - Salaried1
 
537

 
523

 
509

U.S. Iron Ore - Hourly1,3
 
2,171

 
2,178

 
1,813

Asia Pacific Iron Ore - Salaried2
 
78

 
82

 
90

Discontinued Operations - Salaried2
 

 
4

 
32

Discontinued Operations - Hourly2
 

 

 
41

Corporate & Support Services - Salaried4
 
152

 
140

 
153

Total
 
2,938

 
2,927

 
2,638

 
 
 
 
 
 
 
1 Includes our employees and the employees of the U.S. Iron Ore joint venture.
2 Excludes contracted mining employees.
3 Excludes employees considered on lay-off status as a result of an indefinite or temporary idle.
4 Includes employees of our HBI project.
Hourly employees at our Michigan and Minnesota iron ore mining operations, excluding Northshore, are represented by the USW and are covered by labor agreements between the USW and our various operating entities. These labor agreements that cover approximately 1,800 active USW-represented employees at our Empire and Tilden mines in Michigan, and our United Taconite and Hibbing mines in Minnesota are valid through September 30, 2018. Employees at our Northshore operations are not represented by a union and are not, therefore, covered by a collective bargaining agreement.
Hourly employees at our LS&I railroads are represented by seven unions covering approximately 100 employees. The labor agreements that cover these employees reopened for bargaining on December 31, 2014 and we are actively bargaining for successor agreements. These employees negotiate under the Railway Labor Act, which provides that labor agreements remain in force until replaced by a successor agreement. Under the Railway Labor Act work stoppages cannot occur until the parties have engaged in substantial negotiations, have mediated any disputes and have received a release from the National Mediation Board.
Salaried employees at our U.S. Iron Ore, Asia Pacific Iron Ore, Corporate and Support Services are not represented by a union and are not, therefore, covered by collective bargaining agreements.

14

Table of Contents

Safety
Safety is our primary core value as we continue toward a zero injury culture at all of our facilities.  We continuously monitor, measure and track our safety performance and make frequent improvements to affect change.  Best practices and incident learnings are shared globally to ensure each mine site can effectively administer our policies and procedures for enhanced workplace safety. Progress toward achieving our objectives is accomplished through a focus on proactive initiatives and results measured against established industry and company benchmarks, including our company-wide Total Reportable Incident Rate ("TRIR"). During 2017, our TRIR (including contractors) was 1.32 per 200,000 man-hours worked. 
Refer to Exhibit 95 Mine Safety Disclosures (filed herewith) for mine safety information required in accordance with Section 1503(a) of the Dodd-Frank Act.
Available Information
Our headquarters are located at 200 Public Square, Suite 3300, Cleveland, Ohio 44114-2315, and our telephone number is (216) 694-5700. We are subject to the reporting requirements of the Exchange Act and its rules and regulations. The Exchange Act requires us to file reports, proxy statements and other information with the SEC. Copies of these reports and other information can be read and copied at:
SEC Public Reference Room
100 F Street N.E.
Washington, D.C. 20549
Information on the operation of the Public Reference Room may be obtained by calling the SEC at 1-800-SEC-0330.
The SEC maintains a website that contains reports, proxy statements and other information regarding issuers that file electronically with the SEC. These materials may be obtained electronically by accessing the SEC’s home page at www.sec.gov.
We use our website, www.clevelandcliffs.com, as a channel for routine distribution of important information, including news releases, investor presentations and financial information. We also make available, free of charge on our website, our Annual Report on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K and amendments to these reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange Act, as soon as reasonably practicable after we electronically file these documents with, or furnish them to, the SEC. In addition, our website allows investors and other interested persons to sign up to receive automatic email alerts when we post news releases and financial information on our website.
We also make available, free of charge on our website, the charters of the Audit Committee, Governance and Nominating Committee and Compensation and Organization Committee as well as the Corporate Governance Guidelines and the Code of Business Conduct and Ethics adopted by our Board of Directors. These documents are available through our investor relations page on our website at www.clevelandcliffs.com. The SEC filings are available by selecting “Financial Information” and then “SEC Filings,” and corporate governance materials are available by selecting “Corporate Governance” for the Board Committee Charters, operational governance guidelines and the Code of Business Conduct and Ethics.
References to our website or the SEC’s website do not constitute incorporation by reference of the information contained on such websites, and such information is not part of this Annual Report on Form 10-K.
Copies of the above-referenced information are also available, free of charge, by calling (216) 694-5700 or upon written request to:
Cleveland-Cliffs Inc.
Investor Relations
200 Public Square, Suite 3300
Cleveland, OH 44114-2315

15

Table of Contents

EXECUTIVE OFFICERS OF THE REGISTRANT
Following are the names, ages and positions of the executive officers of the Company as of February 14, 2018. Unless otherwise noted, all positions indicated are or were held with Cleveland-Cliffs Inc.
Name
Age
Position(s) Held
Lourenco Goncalves
60
Chairman, President and Chief Executive Officer (August 2014 - present); and Chairman, President and Chief Executive Officer of Metals USA Holdings Corp., an American manufacturer and processor of steel and other metals (May 2006 - April 2013).
Terry G. Fedor
53
Executive Vice President, U.S. Iron Ore (January 2014 - present); and Vice President, U.S. Iron Ore Operations (February 2011 - January 2014).
Timothy K. Flanagan
40
Executive Vice President, Chief Financial Officer (January 2017 - present); Treasurer (March 2016 - December 2017); Vice President, Corporate Controller and Chief Accounting Officer (March 2012 - December 2016); and Assistant Controller (February 2010 - March 2012).
James D. Graham
52
Executive Vice President (November 2014 - present); Chief Legal Officer (March 2013 - present); Secretary (March 2014 - present); Vice President (January 2011 - October 2014); and General Counsel - Global Operations (January 2011 - March 2013).
Maurice D. Harapiak
56
Executive Vice President, Human Resources (March 2014 - present); Chief Administration Officer (January 2018 - present); and Regional Director, Human Resources - Barrick Gold of North America, a gold mining company (November 2011 - March 2014).
Terrence R. Mee
48
Executive Vice President, Global Commercial (October 2014 - present); Vice President, Global Iron Ore Sales (February 2014 - October 2014); Senior Vice President, Global Iron Ore Sales (March 2012 - February 2014); and Senior Vice President, Global Iron Ore and Metallic Sales (January 2011 - March 2012).
Clifford T. Smith
58
Executive Vice President, Business Development (April 2015 - present); Executive Vice President, Seaborne Iron Ore (January 2014 - April 2015); Executive Vice President, Global Operations (July 2013 - January 2014); Executive Vice President, Global Business Development (March 2013 - July 2013); and Senior Vice President, Global Business Development (January 2011 - March 2013).
R. Christopher Cebula
47
Vice President, Corporate Controller & Chief Accounting Officer (February 2017 - present); Senior Director, Corporate Financial Planning & Analysis (April 2013 - February 2017); Senior Director, Enterprise Risk Management (April 2010 - March 2013).
All executive officers serve at the pleasure of the Board. There are no arrangements or understandings between any executive officer and any other person pursuant to which an executive officer was selected to be an officer of the Company. There is no family relationship between any of our executive officers, or between any of our executive officers and any of our directors.

16

Table of Contents

Item 1A.
Risk Factors
An investment in our common shares or other securities is subject to risk inherent to our business and our industry. Described below are certain risks and uncertainties, the occurrences of which could have a material adverse effect on us. Before making an investment decision, you should consider carefully all of the risks described below together with the other information included in this report. The risks and uncertainties described below include known material risks that we face currently. Although we have extensive risk management policies, practices and procedures aimed to mitigate these risks, uncertainties may nevertheless impair our business operation. This report is qualified in its entirety by these factors.
Our ERM function provides a framework for management's consideration of risk when making strategic, financial, operational and/or project decisions. The framework is based on ISO 31000, an internationally recognized risk management standard. Management uses a consistent methodology to identify and assess risks, determine and implement risk mitigation actions, and monitor and communicate information about the Company's key risks. Through these processes, we have identified six categories of risk that we are subject to: (I) economic and market, (II) regulatory, (III) financial, (IV) operational, (V) development and sustainability and (VI) human capital. The following risk factors are presented according to these key risk categories.
I.
ECONOMIC AND MARKET RISKS
The volatility of commodity prices, namely iron ore and steel, affects our ability to generate revenue, maintain stable cash flow and fund our operations, including growth and expansion projects.
As a mining company, our profitability is dependent upon the price of the commodities that we sell to our customers and the price of the products our customers sell, namely iron ore and steel prices. The price of iron ore has fluctuated significantly in the past and is affected by factors beyond our control, including: steel inventories; international demand for raw materials used in steel production; rates of global economic growth, especially construction and infrastructure activity that requires significant amounts of steel; changes in the levels of economic activity in the U.S., China, India, Europe and other industrialized or developing countries; uncertainties or weaknesses in global economic conditions such as the U.S. debt ceiling; changes in production capacity of other iron ore suppliers, especially as additional supply comes online or where there is a significant increase in imports of steel into the U.S. or Europe; changes in trade laws; weather-related disruptions or natural disasters that may impact the global supply of iron ore; and the proximity, capacity and cost of infrastructure and transportation.
Our earnings, therefore, may fluctuate with the prices of the commodities we sell. To the extent that the prices of iron ore and steel, including the average hot-rolled coil steel price, significantly decline for an extended period of time, we may have to revise our operating plans, including curtailing production, reducing operating costs and capital expenditures and discontinuing certain exploration and development programs. We also may have to take impairments on our long-lived assets and/or inventory. Sustained lower prices also could cause us to further reduce existing reserves if certain reserves no longer can be economically mined or processed at prevailing prices. We may be unable to decrease our costs in an amount sufficient to offset reductions in revenues and may incur losses. These events could have a material adverse effect on us.
Uncertainty or weaknesses in global economic conditions, reduced economic growth in China and oversupply of iron ore and excess steel or imported products could affect adversely our business.
The world price of iron ore is influenced strongly by global economic conditions, including international demand and supply for iron ore products. In particular, the current level of international demand for raw materials used in steel production is driven largely by industrial growth in China. Uncertainties or weaknesses in global economic conditions, including the slowing economic growth rate in China, has resulted, and could in the future result, in decreased demand for our products and, together with oversupply of imported products, has and may continue to lead to decreased prices, resulting in lower revenue levels and decreasing margins, which have in the past and may in the future affect adversely our business and negatively impact our financial results. We are not able to predict whether the global economic conditions will improve or worsen and the impact it may have on our operations and the industry in general going forward.

17

Table of Contents

Capacity expansions and limited rationalization of supply capacity within the mining industry could lead to lower or more volatile global iron ore prices, impacting our profitability.
Global growth of iron ore demand, particularly from China, resulted in iron ore suppliers expanding their production capacity over the past few years. The supply of iron ore increased due to these expansions. The previous increases in our competitors’ capacity along with actual reduced demand resulted in excess supply of iron ore continue to cause downward pressure on prices. The limited rationalization of supply capacity has led to volatile pricing which can have an adverse impact on our sales, margins and profitability. We do not have control over corporate strategies implemented by other iron ore producers that may result in volatility of global iron ore prices.
If steelmakers use methods other than blast furnace production to produce steel or use other inputs, or if their blast furnaces shut down or otherwise reduce production, the demand for our current iron ore products may decrease.
Demand for our iron ore products in North America is determined by the operating rates for the blast furnaces of steel companies. However, not all finished steel is produced by blast furnaces; finished steel also may be produced by other methods that use scrap steel, pig iron, hot briquetted iron and direct reduced iron. North American steel producers also can produce steel using imported iron ore, semi-finished steel products or other lighter-weight steel alternatives, which eliminates the need for domestic iron ore. Future environmental restrictions on the use of blast furnaces in North America also may reduce our customers’ use of their blast furnaces. Maintenance of blast furnaces may require substantial capital expenditures and may cause prolonged outages, which may reduce demand for our pellets. Our customers may choose not to maintain, or may not have the resources necessary to maintain, their blast furnaces. If our customers use methods to produce steel that do not use iron ore pellets or if environmental or maintenance issues occur, demand for our current iron ore products will decrease, which would affect adversely our sales, margins, profitability and cash flows.
Due to economic conditions and volatility in commodity prices, or otherwise, our customers could approach us about modification of their supply agreements or fail to perform under such agreements, which could impact adversely our sales, margins, profitability and cash flows.
Although we have long-term contractual commitments for a majority of the sales in our U.S. Iron Ore business, uncertainty in global economic conditions may impact adversely the ability of our customers to meet their obligations. As a result of such market volatility, our customers could approach us about modifying their supply agreements or fail to perform under such agreements. Considering our limited base of current and potential customers, any modifications to our sales agreements or customers' failures to perform under such agreements could impact adversely our sales, margins, profitability and cash flows. For example, of the potential customers in the North American integrated steel industry, one is in reorganization proceedings, and certain others have experienced financial difficulties. A loss of sales to our existing customers could have a substantial negative impact on our sales, margins, profitability and cash flows. Other potential actions by our customers could result in additional contractual disputes and could ultimately require arbitration or litigation, either of which could be time consuming and costly. Any such disputes and/or failure to renew existing contracts on favorable terms could impact adversely our sales, margins, profitability and cash flows.
II.
REGULATORY RISKS
We are subject to extensive governmental regulation, which imposes, and will continue to impose, potential significant costs and liabilities on us. Future laws and regulations or the manner in which they are interpreted and enforced could increase these costs and liabilities or limit our ability to produce iron ore products.
New laws or regulations, or changes in existing laws or regulations, or the manner of their interpretation or enforcement, could increase our cost of doing business and restrict our ability to operate our business or execute our strategies. This includes, among other things, the possible taxation under U.S. law of certain income from foreign operations, compliance costs and enforcement under the Dodd-Frank Act, and costs associated with complying with the Patient Protection and Affordable Care Act and the Healthcare and Education Reconciliation Act of 2010 and the regulations promulgated thereunder and any replacement or amendments thereof. In addition, we are subject to various federal, provincial, state and local laws and regulations in each jurisdiction in which we have operations for human health and safety, air quality, water pollution, plant, wetlands, natural resources and wildlife protection, reclamation and restoration of mining properties, the discharge of materials into the environment, the effects that mining has on groundwater quality, conductivity and availability, and related matters. Numerous governmental permits and approvals are required for our operations.
We cannot be certain that we have been or will be at all times in complete compliance with such laws, regulations, permits and approvals. If we violate or fail to comply with these laws, regulations, permits or approvals, we could be fined or otherwise sanctioned by regulators. Compliance with the complex and extensive laws and regulations to which

18

Table of Contents

we are subject imposes substantial costs, which could increase over time because of increased regulatory oversight, adoption of increasingly stringent environmental standards, and increased demand for remediation services leading to shortages of equipment, supplies and labor, as well as other factors.
Specifically, there are several notable proposed or recently enacted rulemakings or activities to which we would be subject or that would further regulate and/or tax our customers, namely the North American integrated steel producer customers, that may also require us or our customers to reduce or otherwise change operations significantly or incur significant additional costs, depending on their ultimate outcome. These emerging or recently enacted rules, regulations and policy guidance include, but are not limited to: trade regulations, such as possible changes to the North American Free Trade Agreement; numerous air regulations, such as climate change and greenhouse gas regulation, NAAQS including but not limited to those for NO2 and SO2, and Minnesota’s Mercury Air Emissions Reporting and Reduction Rule; Mercury Total Maximum Daily Load requirements and Taconite Mercury Reduction Strategy; selenium discharge regulation; conductivity water quality standards for aquatic life; expansion of federal jurisdictional authority to regulate groundwater and various other water quality regulations. Such new or more stringent legislation, regulations, interpretations or orders, when enacted and enforced, could have a material adverse effect on our business, results of operations, financial condition or profitability.
Although the numerous regulations, operating permits and our management systems mitigate potential impacts to the environment, our operations inadvertently may impact the environment or cause exposure to hazardous substances, which could result in material liabilities to us.
Our operations currently use and have used in the past, hazardous materials, and, from time to time, we have generated solid and hazardous waste. We have been, and may in the future be, subject to claims under federal, provincial, state and local laws and regulations for toxic torts, natural resource damages and other damages as well as for the investigation and clean-up of soil, surface water, sediments, groundwater and other natural resources and reclamation of properties. Such claims for damages and reclamation may arise out of current or former conditions at sites that we own, lease or operate currently, as well as sites that we or our acquired companies have owned, leased or operated, and at contaminated sites that have been owned, leased or operated by our joint venture partners. Our liability for these claims may be strict, and/or joint and several, such that we may be held responsible for more than our share of the contamination or other damages, or even for the entire share regardless of fault. We are subject to a variety of potential liability exposures arising, or otherwise involved in investigation and remediation activities, at certain sites. In addition to sites currently owned, leased or operated, these include sites where we formerly conducted iron ore and/or coal mining or processing or other operations, inactive sites that we currently own, predecessor sites, acquired sites, leased land sites and third-party waste disposal sites. We may be named as a responsible party at other sites in the future and we cannot be certain that the costs associated with these additional sites will not be material.
We also could be subject to litigation for alleged bodily injuries arising from claimed exposure to hazardous substances allegedly used, released, or disposed of by us. In particular, we and certain of our subsidiaries were involved in various claims relating to the exposure of asbestos and silica to seamen who sailed until the mid-1980s on the Great Lakes vessels formerly owned and operated by certain of our subsidiaries. While several hundred of these claims against us had been combined in a multidistrict litigation docket and have since been dismissed and/or settled for non-material amounts, there remains a possibility that similar types of claims could be filed in the future.
Environmental impacts as a result of our operations, including exposures to hazardous substances or wastes associated with our operations, could result in costs and liabilities that could materially and adversely affect our margins, cash flow or profitability.
We may be unable to obtain and/or renew permits necessary for our operations or be required to provide additional financial assurance, which could reduce our production, cash flows, profitability and available liquidity. We also could face significant permit and approval requirements that could delay our commencement or continuation of new or existing production operations which, in turn, could affect materially our cash flows, profitability and available liquidity.
Prior to commencement of mining, we must submit to and obtain approval from the appropriate regulatory authority of plans showing where and how mining and reclamation operations are to occur. These plans must include information such as the location of mining areas, stockpiles, surface waters, haul roads, tailings basins and drainage from mining operations. All requirements imposed by any such authority may be costly and time-consuming and may delay commencement or continuation of exploration or production operations.

19

Table of Contents

Mining companies must obtain numerous permits that impose strict conditions on various environmental and safety matters in connection with iron ore mining. These include permits issued by various federal, state and local agencies and regulatory bodies. The permitting rules are complex and may change over time, making our ability to comply with the applicable requirements more difficult or impractical and costly, possibly precluding the continuance of ongoing operations or the development of future mining operations. Interpretations of rules may also change over time and may lead to requirements, such as additional financial assurance, making it more costly to comply. The public, including special interest groups and individuals, have certain rights under various statutes to comment upon, submit objections to, and otherwise engage in the permitting process, including bringing citizens’ lawsuits to challenge such permits or mining activities. Accordingly, required permits may not be issued or renewed in a timely fashion (or at all), or permits issued or renewed may be conditioned in a manner that may restrict our ability to conduct our mining and production activities efficiently, including the requirement for additional financial assurances that we may not be able to provide on commercially reasonable terms or at all and which would further limit our borrowing base under our ABL Facility. Such inefficiencies could reduce our production, cash flows, profitability and available liquidity.
III.
FINANCIAL RISKS
A substantial majority of our sales are made under supply agreements with specified duration to a low number of customers that contain price-adjustment clauses that could affect adversely the stability and profitability of our operations.
A majority of our U.S. Iron Ore sales and our Asia Pacific Iron Ore sales are made under supply agreements with specified durations to a limited number of customers. For the year ended December 31, 2017, approximately 74% of our revenues from product sales and services was derived from the North American integrated steel industry and three customers together accounted for 88% of our U.S. Iron Ore product sales revenues (representing 70% of our consolidated revenues). Our legacy agreements with ArcelorMittal USA expired at the end of December 2016 and January 2017. The parties executed a long-term agreement, which became effective October 31, 2016 and expires at the end of December 2026. Our average remaining duration of our U.S. Iron Ore contracts as of December 31, 2017 is approximately seven years. Pricing under our contract with ArcelorMittal is adjusted by the price of hot-rolled coil steel in the U.S. domestic market, and iron ore and general inflation indices. As a result of this and other pricing constructs contained in our customer contracts and those anticipated in future periods, our financial results have increased sensitivity to changes in iron ore and steel prices. Our Asia Pacific Iron Ore annually-negotiated contracts are with steel companies primarily in China, Japan and South Korea. In March 2017, we extended the majority of our supply agreements with steel producers in China for one year. These contracts will expire in March 2018, and we will only renew contracts if it can be done in an economically viable manner. Our supply agreement with our client in South Korea expired in December 2017. We renewed that agreement for 2018; however, it is at a lower committed quantity than our previous agreement. Our supply agreements with our customers in Japan expire in March 2018. These contracts could be renewed for an additional term. Pricing for our Asia Pacific Iron Ore Chinese customers consists of shorter-term pricing mechanisms of various durations up to three months based on the average of daily spot prices that are generally associated with the time of unloading of each shipment. Pricing with our Japanese and South Korean customers is generally similar to the inputs used with our Chinese customers, but the pricing inputs are fixed before shipment.
Our existing and future indebtedness may limit cash flow available to invest in the ongoing needs of our business, which could prevent us from fulfilling our obligations under our senior notes and ABL Facility.
As of December 31, 2017, we had an aggregate principal amount of $2,439.4 million of long-term debt, $400.0 million of which was secured (excluding $46.5 million of outstanding letters of credit and $47.8 million of capital leases), and $1,007.7 million of cash on our balance sheet. As of December 31, 2017, no loans were drawn under the ABL Facility and we had total availability of $273.2 million as a result of borrowing base limitations. As of December 31, 2017, the principal amount of letters of credit obligations and other commitments totaled $46.5 million, thereby further reducing available borrowing capacity on our ABL Facility to $226.7 million.
Our substantial level of indebtedness requires us to dedicate a significant portion of our cash flow from operations to the payment of debt service, reducing the availability of our cash flow to fund capital expenditures, acquisitions or strategic development initiatives, and other general corporate purposes. Moreover, our level of indebtedness could have further consequences, including, increasing our vulnerability to adverse economic or industry conditions, limiting our ability to obtain additional financing in the future to enable us to react to changes in our business, or placing us at a competitive disadvantage compared to businesses in our industry that have less indebtedness.
Our substantial level of indebtedness could limit our ability to obtain additional financing on acceptable terms or at all for working capital, capital expenditures, acquisitions or strategic development initiatives, and general corporate purposes. Our liquidity needs could vary significantly and may be affected by general economic conditions, industry

20

Table of Contents

trends, performance and many other factors not within our control. If we are unable to generate sufficient cash flow from operations in the future to service our debt, we may be required to refinance all or a portion of our existing debt. Although we were successful in financing our HBI project, we may not be able to obtain any such new or additional debt on favorable terms or at all.
Any failure to comply with covenants in the instruments governing our debt could result in an event of default which, if not cured or waived, would have a material adverse effect on us.
We may not be able to generate sufficient cash to service all of our debt, and may be forced to take other actions to satisfy our obligations under our debt, which may not be successful.
Our ability to make scheduled payments on or to refinance our debt obligations depends on our ability to generate cash in the future and our financial condition and operating performance, which are subject to prevailing economic and competitive conditions and to certain financial, business and other factors beyond our control. We cannot assure you that we will maintain a level of cash flows from operating activities sufficient to permit us to pay the principal, premium, if any, and interest on our debt.
We also have significant capital requirements, including interest payments to service our debt. If we incur significant losses in future periods, we may be unable to continue as a going concern. If we are unable to continue as a going concern, we may consider, among other options, restructuring our debt; however, there can be no assurance that these options will be undertaken and, if so undertaken, whether these efforts will succeed.
If our cash flows and capital resources are insufficient to fund our debt service obligations, we may be forced to reduce or delay investments and capital expenditures, or to sell assets, seek additional capital, including additional secured or unsecured debt, or restructure or refinance our debt. Any refinancing of our debt could be at higher interest rates and may require us to comply with more onerous covenants, making it more difficult to obtain surety bonds, letters of credit or other financing, particularly during periods in which credit markets are weak; causing a change in our credit ratings; limiting our ability to compete with companies that are not as leveraged and that may be better positioned to withstand economic downturns; and limiting our flexibility in planning for, or reacting to, and increasing our vulnerability to, changes in our business, the industry in which we compete and general economic and market conditions. These measures may not be successful and may not permit us to meet our scheduled debt service obligations.
If our operating results and available cash are insufficient to meet our debt service obligations, we could face substantial liquidity problems and might be required to dispose of material assets or operations to meet our debt service and other obligations. We may not be able to consummate those dispositions or recover the carrying value of these assets or obtain the proceeds that we could realize from them, and these proceeds may not be adequate to meet any debt service obligations then due. Further, we may need to refinance all or a portion of our debt on or before maturity, and we may not be able to refinance any of our debt on commercially reasonable terms or at all. Furthermore, additional or new financial assurances may be demanded by our vendors or regulatory agencies that we may not be able to provide on commercially reasonable terms or at all.
Any of these examples potentially could have a material adverse impact on our results of operations, profitability, shareholders' equity and capital structure. Also, if we are to sell a percentage of a business, there are inherent risks relating to joint venture relationships, as noted in the risk factor below.
We rely on our joint venture partners to meet their payment obligations and we are subject to risks involving the acts or omissions of our joint venture partners.
We co-own and manage one of our four operating U.S. Iron Ore mines with ArcelorMittal and U.S. Steel. We rely on our joint venture partners to make their required capital contributions and to pay for their share of the iron ore produced. One of our U.S. Iron Ore joint venture partners is also our customer. If one or both of our joint venture partners fail to perform their obligations, the remaining joint venture partners, including ourselves, may be required to assume additional material obligations, including significant capital contribution, costs of environmental remediation, pension and postretirement health and life insurance benefit obligations. For example, a premature closure of a mine due to the failure of a joint venture partner to perform its obligations could result in significant fixed mine-closure costs, including severance, employment legacy costs and other employment costs; reclamation and other environmental costs; and the costs of terminating long-term obligations, including energy and transportation contracts and equipment leases.

21

Table of Contents

We cannot control the actions of our joint venture partners because we have a minority interest in such joint venture. Further, in spite of performing customary due diligence prior to entering into a joint venture, we cannot guarantee full disclosure of prior acts or omissions of the sellers or those with whom we may in the future enter into joint ventures. Such risks could have a material adverse effect on the business, results of operations or financial condition of our existing or future joint venture interests.
Our ability to collect payments from our customers depends on their creditworthiness.
Our ability to receive payment for products sold and delivered to our customers depends on the creditworthiness of our customers. With respect to our Asia Pacific business unit, payment typically is received as the products are shipped and much of the product is secured by bank letters of credit. By contrast, in our U.S. Iron Ore business unit, generally, we deliver iron ore products to our customers’ facilities in advance of payment for those products. Under this practice for our U.S. customers, title and risk of loss with respect to U.S. Iron Ore products does not pass to the customer until payment for the pellets is received; however, there is typically a period of time in which pellets, for which we have reserved title, are within our customers’ control. Where we have identified credit risk with certain customers, we have put in place alternate payment terms from time to time.
Consolidation in some of the industries in which our customers operate have created larger customers. These factors have caused some customers to be less profitable and increased our exposure to credit risk. Customers in other countries may be subject to other pressures and uncertainties that may affect their ability to pay, including trade barriers, exchange controls, and local, economic and political conditions. Downturns in the economy and disruptions in the global financial markets have affected the creditworthiness of our customers from time to time. Some of our customers are highly leveraged. If economic conditions worsen or prolonged global, national or regional economic recession conditions return, it is likely to impact significantly the creditworthiness of our customers and could, in turn, increase the risk we bear on payment default for the credit we provide to our customers and could limit our ability to collect receivables. Failure to receive payment from our customers for products that we have delivered could affect adversely our results of operations, financial condition and liquidity.
Our operating expenses could increase significantly if the price of electrical power, fuel or other energy sources increases.
Our mining operations require significant use of energy. Energy expenses, which make up approximately 20% to 25% in the aggregate of our operating costs in our U.S. Iron Ore locations, are sensitive to changes in electricity prices and fuel prices, including diesel fuel and natural gas prices. Prices for electricity, natural gas and fuel oils can fluctuate widely with availability and demand levels from other users. During periods of peak usage, supplies of energy may be curtailed and we may not be able to purchase them at historical rates. A disruption in the transmission of energy, inadequate energy transmission infrastructure, or the termination of any of our energy supply contracts could interrupt our energy supply and affect adversely our operations. While we have some long-term contracts with electrical suppliers, we are exposed to fluctuations in energy costs that can affect our production costs. As an example, our mines in Minnesota are subject to changes in Minnesota Power’s rates, such as periodic rate changes that are reviewed and approved by the state public utilities commission in response to an application filed by Minnesota Power. We also enter into market-based pricing supply contracts for natural gas and diesel fuel for use in our operations. Those contracts expose us to price increases in energy costs, which could cause our profitability to decrease significantly.
In addition, U.S. public utilities are expected to pass through additional capital and operating cost increases to their customers related to new or pending U.S. environmental regulations that are expected to require significant capital investment and use of cleaner fuels in the future and which may impact U.S. coal-fired generation capacity. Our mines in Michigan rely on electricity supplied from the Presque Isle Power Plant, which is coal-fired. In 2016, we entered into a twenty-year power purchase agreement that contemplates the capital investment by the power company to construct two natural gas power plants in Michigan. Should the power company fail to build the new power plants or experience significant construction delays, we may be subject to increased operational risk from continued reliance on the existing power plant or increased costs in pursuing alternatives, which could also decrease our profitability.
We are subject to a variety of financial market risks.
Financial market risks include those caused by changes in the value of investments, changes in commodity prices, interest rates and foreign currency exchange rates. We have established policies and procedures to manage such risks; however, certain risks are beyond our control and our efforts to mitigate such risks may not be effective. These factors could have a material adverse effect on our results of operations.

22

Table of Contents

We are subject to bankruptcy or insolvency risks relating to our former Canadian operations.
As previously disclosed, the Bloom Lake Group commenced restructuring proceedings under the CCAA in January 2015 to address the Bloom Lake Group's immediate liquidity issues and to preserve and protect its assets for the benefit of all stakeholders while restructuring and/or sale options were explored. In May 2015, the Wabush Group also commenced restructuring proceedings under the CCAA. It is possible that (a) as part of the CCAA process (i) claims may be asserted by or on behalf of the Bloom Lake Group or the Wabush Group or by their respective representatives against us and/or non-debtor affiliates of the Bloom Lake Group and the Wabush Group and/or (ii) our claims and non-debtor affiliate claims against the Bloom Lake Group or the Wabush Group may be challenged; and (b) creditors of the Bloom Lake Group, the Wabush Group or their respective representatives may assert claims which may impact adversely non-debtor affiliates of the Bloom Lake Group and the Wabush Group. While we anticipate the proceeds of the sale of the Bloom Lake Group and the Wabush Group assets may mitigate these risks, to the extent that any such claims are successful, we could be held liable for certain claims or be limited in the amount of recovery on account of its claims against the Bloom Lake Group and the Wabush Group.
A court or regulatory body could find that we are responsible, in whole or in part, for liabilities we transferred to third party purchasers.
As part of our strategy to focus on our U.S. Iron Ore operations, we have sold or otherwise disposed of several non-core assets, such as our North American Coal assets. Some of the transactions under which we sold or otherwise disposed of our non-core assets included provisions transferring certain liabilities to the purchasers or acquirers of those non-core assets. While we believe that all such transfers were completed properly and are legally binding, if the purchaser fails to fulfill its obligations, we may be at risk that some court or regulatory body could disagree and determine that we remain responsible for liabilities we intended to and did transfer.
Changes in credit ratings issued by nationally recognized statistical rating organizations could adversely affect our cost of financing and the market price of our securities.
Credit rating agencies could downgrade our ratings either due to factors specific to our business, a prolonged cyclical downturn in the mining industry, or macroeconomic trends (such as global or regional recessions) and trends in credit and capital markets more generally. Any decline in our credit ratings may result in an increase to our cost of future financing and limit our access to the capital markets, which would harm our financial condition and results of operations, hinder our ability to refinance existing indebtedness on acceptable terms, have an adverse effect on the market price of our securities and may affect adversely the terms under which we purchase goods and services.
Our actual operating results may differ significantly from our guidance.
From time to time, we release guidance, including that set forth under “Management’s Discussion and Analysis of Financial Condition and Results of Operations-Outlook” in our Annual Reports on Form 10-K and our Quarterly Reports on Form 10-Q, regarding our future performance. This guidance, which consists of forward-looking statements, is prepared by our management and is qualified by, and subject to, the assumptions and the other information included in our Annual Reports on Form 10-K and our Quarterly Reports on Form 10-Q. Our guidance is not prepared with a view toward compliance with published guidelines of the American Institute of Certified Public Accountants, and neither our independent registered public accounting firm nor any other independent or outside party compiles or examines the guidance and, accordingly, no such person expresses any opinion or any other form of assurance with respect thereto.
Guidance is based upon a number of assumptions and estimates that, while presented with numerical specificity, are inherently subject to business, economic and competitive uncertainties and contingencies, many of which are beyond our control and are based upon specific assumptions with respect to future business decisions, some of which will change. The principal reason that we release such data is to provide a basis for our management to discuss our business outlook with analysts and investors. We do not accept any responsibility for any projections or reports published by any such persons.
Guidance is necessarily speculative in nature, and it can be expected that some or all of the assumptions of the guidance furnished by us will not materialize or will vary significantly from actual results. Accordingly, our guidance is only an estimate of what management believes is realizable as of the date of release. Actual results will vary from the guidance. Investors should also recognize that the reliability of any forecasted financial data diminishes the farther in the future that the data are forecast. In light of the foregoing, investors are urged to put the guidance in context and not to place undue reliance on it.

23

Table of Contents

Any failure to successfully implement our operating strategy or the occurrence of any of the events or circumstances set forth in our Annual Reports on Form 10-K or our Quarterly Reports on Form 10-Q could result in actual operating results being different than the guidance, and such differences may be adverse and material.

IV.
OPERATIONAL RISKS
We incur certain costs when production capacity is idled, including increased costs to resume production at idled facilities and costs to idle facilities.
Our decisions concerning which mines to operate and at what capacity levels are made based upon our customers' orders for products, the quality of and cost to mine and process the remaining ore body, as well as the capabilities and cost performance of our mines. During depressed market conditions, we may concentrate production at certain mines and not operate others in response to customer demand and as a result we will incur idle facility costs. In 2016, two of our Minnesota mines were temporarily idled for a portion of the year, and we indefinitely idled the Empire mine in Michigan in August 2016.
When we restart idled facilities, we incur certain costs to replenish inventories, prepare the previously idled facilities for operation, perform the required repair and maintenance activities and prepare employees to return to work safely and to resume production responsibilities. The amount of any such costs can be material, depending on a variety of factors, such as the period of idle time, necessary repairs and available employees, and is difficult to project.
Faced with overcapacity in the iron ore market, we may seek to rationalize assets through asset sales, temporary shutdowns, indefinite idles or closures of facilities.
Mine closures entail substantial costs. If we prematurely close one or more of our mines, our results of operations and financial condition would likely be affected adversely.
If we prematurely close any of our mines, our revenues would be reduced unless we were able to increase production at our other mines, which may not be possible. The closure of a mining operation involves significant fixed closure costs, including accelerated employment legacy costs, severance-related obligations, reclamation and other environmental costs, and the costs of terminating long-term obligations, including customer, energy and transportation contracts and equipment leases. A review of these types of potential costs is currently underway with respect to our Asia Pacific Iron Ore operations. We base our assumptions regarding the life of our mines on detailed studies we perform from time to time, but those studies and assumptions are subject to uncertainties and estimates that may not be accurate. We recognize the costs of reclaiming open pits, stockpiles, tailings ponds, roads and other mining support areas based on the estimated mining life of our property. If we were to significantly reduce the estimated life of any of our mines, the mine-closure costs would be applied to a shorter period of production, which would increase costs per ton produced and could significantly and adversely affect our results of operations and financial condition.
A U.S. mine permanent closure could accelerate and significantly increase employment legacy costs, including our expense and funding costs for pension and other postretirement benefit obligations. A number of employees would be eligible for immediate retirement under special eligibility rules that apply upon a mine closure. All employees eligible for immediate retirement under the pension plans at the time of the permanent mine closure also could be eligible for postretirement health and life insurance benefits, thereby accelerating our obligation to provide these benefits. Certain mine closures would precipitate a pension closure liability significantly greater than an ongoing operation liability. Finally, a permanent mine closure could trigger severance-related obligations, which can equal up to sixteen weeks of pay per employee in some jurisdictions, depending on length of service. As a result, the closure of one or more of our mines could affect adversely our financial condition and results of operations.
Our sales and competitive position depend on the ability to transport our products to our customers at competitive rates and in a timely manner.
In our U.S. Iron Ore operations, disruption of the lake and rail transportation services because of weather-related problems, including ice and winter weather conditions on the Great Lakes or St. Lawrence Seaway, climate change, strikes, lock-outs, or other events and lack of alternative transportation options, could impair our ability to supply iron ore to our customers at competitive rates or in a timely manner and, thus, could adversely affect our sales, margins and profitability. Further, reduced dredging and environmental changes, particularly at Great Lakes ports, could impact negatively our ability to move our iron ore products because lower water levels restrict the tonnage that vessels can haul, resulting in higher freight rates.

24

Table of Contents

Our Asia Pacific Iron Ore operations also are dependent upon rail and port capacity. Disruptions in rail service or availability of dock capacity could similarly impair our ability to supply iron ore to our customers, thereby adversely affecting our sales and profitability. In addition, our Asia Pacific Iron Ore operations are also in direct competition with the major world seaborne exporters of iron ore and our customers face higher transportation costs than the customers of most other Australian producers to ship our products to the Asian markets because of the location of our major shipping port on the southwest coast of Australia. Further, increases in transportation costs, including volatile fuel rates, decreased availability of ocean vessels or changes in such costs relative to transportation costs incurred by our competitors could make our products less competitive, restrict our access to certain markets and have an adverse effect on our sales, margins and profitability.
Natural disasters, weather conditions, disruption of energy, unanticipated geological conditions, equipment failures, and other unexpected events may lead our customers, our suppliers or our facilities to curtail production or shut down operations.
Operating levels within the mining industry are subject to unexpected conditions and events that are beyond the industry’s control. Those events could cause industry members or their suppliers to curtail production or shut down a portion or all of their operations, which could reduce the demand for our iron ore products, and could affect adversely our sales, margins and profitability.
Interruptions in production capabilities inevitably will increase our production costs and reduce our profitability. We do not have meaningful excess capacity for current production needs, and we are not able to quickly increase production or re-start production at one mine to offset an interruption in production at another mine. Additionally, re-start production costs can be even higher if required to be taken during extremely cold weather conditions.
A portion of our production costs are fixed regardless of current operating levels. As noted, our operating levels are subject to conditions beyond our control that can delay deliveries or increase the cost of mining at particular mines for varying lengths of time. These include weather conditions (for example, extreme winter weather, tornadoes, floods, and the lack of availability of process water due to drought) and natural and man-made disasters, tailings dam failures, pit wall failures, unanticipated geological conditions, including variations in the amount of rock and soil overlying the deposits of iron ore, variations in rock and other natural materials and variations in geologic conditions and ore processing changes.
The manufacturing processes that take place in our mining operations, as well as in our processing facilities, depend on critical pieces of equipment. This equipment may, on occasion, be out of service because of unanticipated failures. In addition, all of our mines and processing facilities have been in operation for several decades, and the equipment is aged. In the future, we may experience additional material plant shutdowns or periods of reduced production because of equipment failures. Further, remediation of any interruption in production capability may require us to make large capital expenditures that could have a negative effect on our profitability and cash flows. Our business interruption insurance would not cover all of the lost revenues associated with equipment failures. Longer-term business disruptions could result in a loss of customers, which adversely could affect our future sales levels and, therefore, our profitability.
Regarding the impact of unexpected events happening to our suppliers, many of our mines are dependent on one source for electric power and for natural gas. A significant interruption in service from our energy suppliers due to terrorism or sabotage, weather conditions, natural disasters, or any other cause can result in substantial losses that may not be fully recoverable, either from our business interruption insurance or responsible third parties.
We may not have adequate insurance coverage for some business risks.
As noted above, our operations are generally subject to a number of hazards and risks, which could result in damage to, or destruction of, equipment, properties or facilities. The insurance that we maintain to address risks that are typical in our business may not provide adequate coverage. Insurance against some risks, such as liabilities for environmental pollution, tailings basin breaches, or certain hazards or interruption of certain business activities, may not be available at an economically reasonable cost, or at all. Even if available, we may self-insure where we determine it is most cost-effective to do so. As a result, accidents or other negative developments involving our mining, production or transportation activities could have a material adverse effect on our operations.

25

Table of Contents

A disruption in, or failure of our information technology systems, including those related to cybersecurity, could adversely affect our business operations and financial performance.
We rely on the accuracy, capacity and security of our information technology (“IT”) systems for the operations of many of our business processes and to comply with regulatory, legal, and tax requirements. While we maintain some of our critical information technology systems, we are also dependent on third parties to provide important IT services relating to, among other things, human resources, electronic communications and certain finance functions. Despite the security measures that we have implemented, including those related to cybersecurity, our systems could be breached or damaged by computer viruses, natural or man-made incidents or disasters or unauthorized physical or electronic access. Though we have controls in place, we cannot provide assurance that a cyber-attack will not occur. Furthermore, we may have little or no oversight with respect to security measures employed by third-party service providers, which may ultimately prove to be ineffective at countering threats. Failures of our IT systems, whether caused maliciously or inadvertently, may result in the disruption of our business processes, or in the unauthorized release of sensitive, confidential or otherwise protected information or result in the corruption of data, which could adversely affect our business operations and financial performance. In addition, we may be required to incur significant costs to protect against and, if required, remediate the damage caused by such disruptions or system failures in the future.
We are subject to risks involving operations and sales in multiple countries.
We supply raw materials to the global integrated steel industry with substantial assets located outside of the U.S. We conduct operations in the U.S. and Australia. As such, we are subject to additional risks beyond those relating to our U.S. operations, such as fluctuations in currency exchange rates; potentially adverse tax consequences due to overlapping or differing tax structures; burdens to comply with multiple and potentially conflicting foreign laws and regulations, including export requirements, tariffs, economic sanctions and other barriers, environmental health and safety requirements, and unexpected changes in any of these laws and regulations; the imposition of duties, tariffs, import and export controls and other trade barriers impacting the seaborne iron ore markets; difficulties in staffing and managing multi-national operations; political and economic instability and disruptions, including terrorist attacks; disadvantages of competing against companies from countries that are not subject to U.S. laws and regulations, including the Foreign Corrupt Practices Act; and uncertainties in the enforcement of legal rights and remedies in multiple jurisdictions.
With the finalization of the Organization for Economic Cooperation and Development's ("OECD"), Base Erosion and Profit Shifting study, referred to as the Actions, many OECD countries have acknowledged their intent to implement the Actions and update their local tax regulations. The extent (if any) to which countries in which we operate adopt and implement the Actions could affect our effective tax rate and our future results from non-U.S. operations.
Compliance with the laws and regulations described above or with other applicable foreign, federal, state, provincial and local laws and regulations currently in effect or that may be adopted in the future could expose us to additional risks. If we are unable to manage successfully the risks associated with operating our global business, these risks could have a material adverse effect on our business, results of operations or financial condition.
Our profitability could be affected adversely by the failure of outside contractors and/or suppliers to perform.
Asia Pacific Iron Ore uses contractors to handle many of the operational phases of its mining and processing operations and, therefore, we are subject to the performance of outside companies on key production areas. We use contractors to help complete certain capital projects, such as upgrades to our existing U.S. Iron Ore facilities, and a contractor's or supplier's failure to perform could affect adversely our production, sales, and our ability to fulfill customer requirements. Such failure to perform in a significant way would result in additional costs for us, which also could affect adversely our production rates, sales and results of operations.
V.
DEVELOPMENT AND SUSTAINABILITY RISKS
The cost and time to implement a strategic capital project may prove to be greater than originally anticipated.
We undertake strategic capital projects, such as the HBI project, in order to enhance, expand or upgrade our mines, production capabilities and diversify our customer base. Our ability to achieve the anticipated volumes of production, revenues or otherwise realize acceptable returns on strategic capital projects that we may undertake is subject to a number of risks, many of which are beyond our control, including a variety of market (such as a volatile pricing environment for iron ore), operational, permitting and labor-related factors. Further, the cost to implement any given strategic capital project ultimately may prove to be greater and may take more time than originally anticipated. Inability to achieve the anticipated results from the implementation of our strategic capital projects, or the incurring of

26

Table of Contents

unanticipated implementation costs, penalties or inability to meet contractual obligations could affect adversely our results of operations and future earnings and cash flow generation.
We continually must replace reserves depleted by production. Exploration activities may not result in additional discoveries.
Our ability to replenish our ore reserves is important to our long-term viability. Depleted ore reserves must be replaced by further delineation of existing ore bodies or by locating new deposits in order to maintain production levels over the long term. For example, in 2017 we made investments in our Tilden and Empire mines and in land in Minnesota to provide future potential ore reserves. Resource exploration and development are highly speculative in nature. Exploration projects involve many risks, require substantial expenditures and may not result in the discovery of sufficient additional mineral deposits that can be mined profitably. Once a site with mineralization is discovered, it may take several years from the initial phases of drilling until production is possible, during which time the economic feasibility of production may change. Substantial expenditures are required to establish recoverable proven and probable reserves and to construct mining and processing facilities. As a result, there is no assurance that current or future exploration programs will be successful and there is a risk that depletion of reserves will not be offset by discoveries or acquisitions.
We rely on estimates of our recoverable reserves, which is complex due to geological characteristics of the properties and the number of assumptions made.
We regularly evaluate our U.S. Iron Ore reserves based on revenues and costs and update them as required in accordance with SEC Industry Guide 7. Our Asia Pacific Iron Ore business segment has published reserves that follow the Joint Ore Reserve Code in Australia, with certain changes to our Western Australian reserve values to make them comply with SEC requirements. There are numerous uncertainties inherent in estimating quantities of reserves of our mines, including many factors beyond our control.
Estimates of reserves and future net cash flows necessarily depend upon a number of variable factors and assumptions, such as production capacity, effects of regulations by governmental agencies, future prices for iron ore, future industry conditions and operating costs, severance and excise taxes, development costs and costs of extraction and reclamation, all of which may vary considerably from actual results. Estimating the quantity and grade of reserves requires us to determine the size, shape and depth of our mineral bodies by analyzing geological data, such as samplings of drill holes. In addition to the geology assumptions of our mines, assumptions are also required to determine the economic feasibility of mining these reserves, including estimates of future commodity prices and demand, the mining methods we use, and the related costs incurred to develop and mine our reserves. For these reasons, estimates of the economically recoverable quantities of mineralized deposits attributable to any particular group of properties, classifications of such reserves based on risk of recovery and estimates of future net cash flows prepared by different engineers or by the same engineers at different times may vary substantially as the criteria change. Estimated ore reserves could be affected by future industry conditions, future changes in the SEC's mining property disclosure requirements, geological conditions and ongoing mine planning. Actual volume and grade of reserves recovered, production rates, revenues and expenditures with respect to our reserves will likely vary from estimates, and if such variances are material, our sales and profitability could be affected adversely.
Defects in title or loss of any leasehold interests in our properties could limit our ability to mine these properties or result in significant unanticipated costs.
A portion of our mining operations are conducted on properties we lease, license or as to which we have easements or other possessory interests, which we refer to as "leased properties." Consistent with industry practice, title to most of these leased properties and mineral rights are not usually verified until we make a commitment to develop a property, which may not occur until after we have obtained necessary permits and completed exploration of the leased property. In some cases, title with respect to leased properties is not verified at all because we instead rely on title information or representations and warranties provided by lessors or grantors. We do not maintain title insurance on our owned or leased mining properties. A title defect or the loss of any lease, license or easement for any leased mining property could affect adversely our ability to mine any associated reserves. In addition, from time to time the rights of third parties for competing uses of adjacent, overlying, or underlying lands such as for roads, easements and public facilities may affect our ability to operate as planned if our title is not superior or arrangements cannot be negotiated.
Any challenge to our title could delay the exploration and development of some reserves, deposits or surface rights, cause us to incur unanticipated costs and could ultimately result in the loss of some or all of our interest in those reserves or surface rights. In the event we lose reserves, deposits or surface rights, we may have to shut down or significantly alter the sequence of our mining operations, which may affect adversely our future production, revenues and cash flows. Additionally, if we lose any leasehold interests relating to any of our pellet plants or loadout facilities, we may need to find an alternative location to process our iron ore and load it for delivery to customers, which could

27

Table of Contents

result in significant unanticipated costs. Finally, we could incur significant liability if we inadvertently mine on property we do not own or lease.
In order to continue to foster growth in our business and maintain stability of our earnings, we must maintain our social license to operate with our stakeholders.
As a mining company, maintaining a strong reputation and consistent operational and safety history is vital in order to continue to foster growth and maintain stability in our earnings. As sustainability expectations increase and regulatory requirements continue to evolve, maintaining our social license to operate becomes increasingly important. We incorporate social license expectations in our ERM program. Our ability to maintain our reputation and strong operating history could be threatened, including by circumstances outside of our control, such as disasters caused or suffered by other mining companies. If we are not able to respond effectively to these and other challenges to our social license to operate, our reputation could be damaged significantly. Damage to our reputation could affect adversely our operations and ability to foster growth in our company.
Estimates and timelines relating to new development projects are uncertain and we may incur higher costs and lower economic returns than estimated.
Mining industry development projects typically require a number of years and significant expenditures before production is possible. Such projects could experience unexpected problems and delays during development, construction and start-up.
Our decision to develop a project typically is based on the results of feasibility studies, which estimate the anticipated economic returns of a project. The actual project profitability or economic feasibility may differ from such estimates as a result of any of the following factors, among others: changes in tonnage, grades and metallurgical characteristics of ore or other raw materials to be mined and processed; estimated future prices of the relevant product; changes in customer demand; higher construction and infrastructure costs; the quality of the data on which engineering assumptions were made; higher production costs; adverse geotechnical conditions; availability of adequate labor force; availability and cost of water and energy; availability and cost of transportation; fluctuations in inflation and currency exchange rates; availability and terms of financing; delays in obtaining environmental or other government permits or changes in laws and regulations including environmental laws and regulations; weather or severe climate impacts; and potential delays relating to social and community issues.
The production of hot briquetted iron is a capital-intensive business and our ongoing efforts with respect to our HBI project will require the commitment of substantial resources. Any unanticipated costs or delays associated with our HBI project could have a material adverse effect on our financial condition or results of operations.
Our ongoing efforts with respect to our HBI project require the commitment of substantial resources for operating expenses and capital expenditures. We currently expect to incur total capital expenditures through 2020 on the HBI project of approximately $700 million on the development of the HBI production plant in Toledo, Ohio and $80 million for upgrades at the Northshore plant to enable it to produce significantly increased levels of DR-grade pellets that could be used as feedstock for the HBI production plant and/or sold commercially. Each of these estimates are exclusive of construction-related contingencies and capitalized interest. Our estimated expenses may increase as personnel and equipment associated with advancing development and commercial production are added. The progress of our HBI project and the amounts and timing of expenditures will depend in part on the following:
receiving and maintaining required federal, state and local permits;
completing infrastructure and construction work and the completion of commissioning and integration of all of the systems comprising our HBI production plant;
negotiating sales contracts for our planned production;
the execution of any joint venture agreements or similar arrangements with strategic partners; and
other factors, many of which are beyond our control.
Most of these activities require significant lead times and must be advanced concurrently.
Any unanticipated costs or other delays associated with our HBI project could have a material adverse effect on our financial condition or results of operations and could require us to seek additional capital, which may not be available on commercially acceptable terms or at all.

28

Table of Contents

Our ability to realize the benefits of any potential acquisitions is uncertain.
Should we determine to pursue any acquisitions, the success of the same is subject to risks and uncertainties, including our ability to realize operating efficiencies expected from an acquisition; the size or quality of the mineral potential; delays in realizing the benefits of an acquisition; difficulties in retaining key employees, customers or suppliers of the acquired business; the risks associated with the assumption of contingent or undisclosed liabilities of acquisition targets; the impact of changes to our allocation of purchase price; and the ability to generate future cash flows or the availability of financing.
Moreover, any acquisition opportunities we pursue could affect materially our liquidity and capital resources and may require us to incur indebtedness, seek equity capital or both. Future acquisitions could also result in us assuming more long-term liabilities relative to the value of the acquired assets than we may have assumed in previous acquisitions.

VI.
HUMAN CAPITAL RISKS
Our profitability could be affected adversely if we fail to maintain satisfactory labor relations.
Production in our mines is dependent upon the efforts of our employees. We are party to labor agreements with various labor unions that represent employees at our operations. Such labor agreements are negotiated periodically, and, therefore, we are subject to the risk that these agreements may not be able to be renewed on reasonably satisfactory terms. It is difficult to predict what issues may arise as part of the collective bargaining process, and whether negotiations concerning these issues will be successful. Due to union activities or other employee actions, we could experience labor disputes, work stoppages, or other disruptions in our production of iron ore that could affect us adversely. The USW represents all labor employees at our U.S. Iron Ore operations owned and/or managed by Cliffs or its subsidiary companies except for Northshore. Our labor agreements with the USW at four of our U.S. Iron Ore operations were ratified in September 2016 and extend for a three-year term, effective as of October 1, 2015.
If we enter into a new labor agreement with any union that significantly increases our labor costs relative to our competitors or fail to come to an agreement upon expiry, our ability to compete may be materially and adversely affected.
We may encounter labor shortages for critical operational positions, which could affect adversely our ability to produce our products.
We are predicting a long-term shortage of skilled workers for the mining industry and competition for the available workers limits our ability to attract and retain employees. Additionally, at our U.S. mining locations, many of our mining operational employees are approaching retirement age. As these experienced employees retire, we may have difficulty replacing them at competitive wages.
Our expenditures for post-retirement benefit and pension obligations could be materially higher than we have predicted if our underlying assumptions differ from actual outcomes, there are mine closures, or our joint venture partners fail to perform their obligations that relate to employee pension plans.
We provide defined benefit pension plans and OPEB to certain eligible union and non-union employees in the U.S., including our share of expense and funding obligations with respect to our unconsolidated joint venture. Our pension and OPEB expenses and our required contributions to our pension and OPEB plans are affected directly by the value of plan assets, the projected and actual rate of return on plan assets, and the actuarial assumptions we use to measure our defined benefit pension plan obligations, including the rate at which future obligations are discounted.
We cannot predict whether changing market or economic conditions, regulatory changes or other factors will increase our pension and OPEB expenses or our funding obligations, diverting funds we would otherwise apply to other uses.
We have calculated our unfunded pension and OPEB obligations based on a number of assumptions, including our joint venture partners satisfying their funding obligations. If our assumptions do not materialize as expected, cash expenditures and costs that we incur could be materially higher. Moreover, we cannot be certain that regulatory changes will not increase our obligations to provide these or additional benefits. These obligations also may increase substantially in the event of adverse medical cost trends or unexpected rates of early retirement, particularly for bargaining unit retirees.

29

Table of Contents

We depend on our senior management team and other key employees, and the loss of these employees could adversely affect our business.
Our success depends in part on our ability to attract and motivate our senior management and key employees. Achieving this objective may be difficult due to a variety of factors, including fluctuations in the global economic and industry conditions, competitors’ hiring practices, cost reduction activities, and the effectiveness of our compensation programs. Competition for qualified personnel can be intense. We must continue to recruit, retain, and motivate our senior management and key personnel in order to maintain our business and support our projects. A loss of senior management and key personnel could prevent us from capitalizing on business opportunities, and our operating results could be adversely affected.
Item 1B.
Unresolved Staff Comments
We have no unresolved comments from the SEC.

30

Table of Contents

Item 2.
Properties
The following map shows the locations of our operations and offices as of December 31, 2017:
globallocationfilingmap17.jpg
General Information about the Mines
All of our iron ore mining operations are open-pit mines. Additional pit development is underway as required by long-range mine plans. At our U.S. Iron Ore and Asia Pacific Iron Ore mines, drilling programs are conducted periodically to collect modeling data and for refining ongoing operations.
Geologic models are developed for all mines to define the major ore and waste rock types. Computerized block models for iron ore are constructed that include all relevant geologic and metallurgical data. These are used to generate grade and tonnage estimates, followed by detailed mine design and life of mine operating schedules.
U.S. Iron Ore
The following map shows the locations of our U.S. Iron Ore operations:
naiofilingsmap17.jpg

We currently own or co-own four operating iron ore mines in Michigan and Minnesota, as well as one indefinitely idled mine in Michigan. We produced 18.8 million, 16.0 million and 19.3 million long tons of iron ore pellets in 2017, 2016 and 2015, respectively, at those mines for our account. We produced 6.7 million, 7.4 million and 6.8 million long tons, respectively, on behalf of current and previous steel company partners of the mines.

31

Table of Contents

Our U.S. Iron Ore mines produce from deposits located within the Biwabik and Negaunee Iron Formation, which are classified as Lake Superior type iron formations that formed under similar sedimentary conditions in shallow marine basins approximately two billion years ago. Magnetite and hematite are the predominant iron oxide ore minerals present, with lesser amounts of goethite and limonite. Quartz is the predominant waste mineral present, with lesser amounts of other chiefly iron bearing silicate and carbonate minerals. The ore minerals liberate from the waste minerals upon fine grinding.
Mine
 
Cliffs Ownership
 
Infrastructure
 
Mineralization
 
Operating
Since
 
Current Annual Capacity1,2
 
2017 Production1,2
 
Mineral Owned
 
Rights Leased
Empire3,4
 
100%
 
Mine,
Concentrator,
Pelletizer
 
Magnetite
 
1963
 
*
 
 
53%
 
47%
Tilden4
 
100%
 
Mine,
Concentrator,
Pelletizer,
Railroad
 
Hematite &
Magnetite
 
1974
 
8.0
 
7.7
 
100%
 
—%
Hibbing
 
23%
 
Mine,
Concentrator,
Pelletizer
 
Magnetite
 
1976
 
8.0
 
7.7
 
3%
 
97%
Northshore
 
100%
 
Mine,
Concentrator,
Pelletizer,
Railroad
 
Magnetite
 
1990
 
6.0
 
5.3
 
—%
 
100%
United Taconite
 
100%
 
Mine,
Concentrator,
Pelletizer
 
Magnetite
 
1965
 
5.4
 
4.8
 
—%
 
100%
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1 Reported on a wet basis in millions of long tons, equivalent to 2,240 pounds.
2 Figures reported on 100% basis.
3 Empire was indefinitely idled beginning on August 3, 2016.
4 During 2017, our ownership interest in Tilden and Empire increased to 100%.
* Historically, Empire had an annual capacity of 5.5 million long tons; currently indefinitely idled.
Empire Mine
The Empire mine is located on the Marquette Iron Range in Michigan’s Upper Peninsula approximately 15 miles southwest of Marquette, Michigan. As a result of the indefinite idle that began in August 2016, the Empire mine had no production in 2017 compared to its highest annual production over the last five years of 4.3 million long tons of iron ore pellets.
During 2017, our ownership interest in Empire increased to 100% as we reached an agreement to distribute the noncontrolling interest net assets to ArcelorMittal, in exchange for its interest in Empire. Prior to the indefinite idle, each partner took its share of production pro rata; however, provisions in the partnership agreement allowed additional or reduced production to be delivered under certain circumstances. Prior to the indefinite idle, operations consisted of an open pit truck and shovel mine, a concentrator that utilizes single stage crushing, AG mills, magnetic separation and floatation to produce a magnetite concentrate that was then supplied to the on-site pellet plant. From the site, pellets were transported by CN rail to a ship loading port at Escanaba, Michigan, operated by CN.
Tilden Mine
The Tilden mine is located on the Marquette Iron Range in Michigan’s Upper Peninsula approximately five miles south of Ishpeming, Michigan. Over the past five years, the Tilden mine has produced between 7.5 million and 7.7 million long tons of iron ore pellets annually. During 2017, we acquired the remaining 15% equity interest in Tilden owned by U.S. Steel. With the closing of this transaction, we now have 100% ownership of the mine. We own all of the ore reserves at the Tilden mine. Operations consist of an open pit truck and shovel mine, a concentrator that utilizes single stage crushing, AG mills, magnetite separation and floatation to produce hematite and magnetite concentrates that are then supplied to the on-site pellet plant. From the site, pellets are transported by our LS&I rail to a ship loading port at Marquette, Michigan, operated by LS&I.

32

Table of Contents

Hibbing Mine
The Hibbing mine is located in the center of Minnesota’s Mesabi Iron Range and is approximately ten miles north of Hibbing, Minnesota, and five miles west of Chisholm, Minnesota. Over the past five years, the Hibbing mine has produced between 7.7 million and 8.2 million long tons of iron ore pellets annually. We own 23% of Hibbing, a subsidiary of ArcelorMittal has a 62.3% interest and a subsidiary of U.S. Steel has a 14.7% interest. Each partner takes its share of production pro rata; however, provisions in the joint venture agreement allow additional or reduced production to be delivered under certain circumstances. Mining is conducted on multiple mineral leases having varying expiration dates. Mining leases routinely are renegotiated and renewed as they approach their respective expiration dates. Hibbing operations consist of an open pit truck and shovel mine, a concentrator that utilizes single stage crushing, AG mills and magnetic separation to produce a magnetite concentrate, which is then delivered to an on-site pellet plant. From the site, pellets are transported by BNSF rail to a ship loading port at Superior, Wisconsin, operated by BNSF.
Northshore Mine
The Northshore mine is located in northeastern Minnesota, approximately two miles south of Babbitt, Minnesota, on the northeastern end of the Mesabi Iron Range. Northshore’s processing facilities are located in Silver Bay, Minnesota, near Lake Superior. Over the past five years, the Northshore mine has produced between 3.2 million and 5.3 million long tons of iron ore pellets annually. We ran a three furnace operation throughout 2015 until the complete idle of the Northshore mine in late November 2015 through May 2016. We restarted all four furnaces in May 2016. The temporary idle was a result of historic levels of steel imports into the U.S. and reduced demand from our steel-producing customers. Throughout 2017 the Northshore mine was substantially at full production levels.
The Northshore mine began production under our management and ownership in October 1994. We own 100% of the mine. Mining is conducted on multiple mineral leases having varying expiration dates. Mining leases routinely are renegotiated and renewed as they approach their respective expiration dates. Northshore operations consist of an open pit truck and shovel mine where two stages of crushing occur before the ore is transported along a wholly owned 47-mile rail line to the plant site in Silver Bay. At the plant site, two additional stages of crushing occur before the ore is sent to the concentrator. The concentrator utilizes rod mills and magnetic separation to produce a magnetite concentrate, which is delivered to the pellet plant located on-site. The plant site has its own ship loading port located on Lake Superior.
United Taconite Mine
The United Taconite mine is located on Minnesota’s Mesabi Iron Range in and around the city of Eveleth, Minnesota. The United Taconite concentrator and pelletizing facilities are located ten miles south of the mine, near the town of Forbes, Minnesota. Over the past five years, the United Taconite mine has produced between 1.5 million and 5.2 million long tons of iron ore pellets annually. United Taconite was temporarily idled beginning in August 2015. We restarted the United Taconite operation in August 2016. The temporary idle was a result of historic levels of steel imports into the U.S. and reduced demand from our steel-producing customers. Throughout 2017 the United Taconite mine was substantially at full production levels.
We own 100% of the United Taconite mine. Mining is conducted on multiple mineral leases having varying expiration dates. Mining leases routinely are renegotiated and renewed as they approach their respective expiration dates. United Taconite operations consist of an open pit truck and shovel mine where two stages of crushing occur before the ore is transported by rail, operated by CN, to the plant site. At the plant site an additional stage of crushing occurs before the ore is sent to the concentrator. The concentrator utilizes rod mills and magnetic separation to produce a magnetite concentrate, which is delivered to the pellet plant. From the site, pellets are transported by CN rail to a ship loading port at Duluth, Minnesota, operated by CN.

33

Table of Contents

Asia Pacific Iron Ore
The following map shows the location of our Asia Pacific Iron Ore operation:

apiofilingsmap17.jpg
In Australia, we own and operate the Koolyanobbing operations. We produced 10.1 million, 11.8 million and 11.7 million metric tons of iron ore products in 2017, 2016 and 2015, respectively.
The mineralization at the Koolyanobbing operations is predominantly hematite and goethite replacements in greenstone-hosted banded iron formations. Individual deposits tend to be small with complex ore-waste contact relationships. The reserves at the Koolyanobbing operations are derived from 10 separate mineral deposits distributed over a 70 mile operating radius.
Mine
 
Cliffs
Ownership
 
Infrastructure
 
Mineralization
 
Operating
Since
 
Current Annual
Capacity1
 
2017 Production1
 
Mineral Owned
 
Rights Leased
Koolyanobbing
 
100%
 
Mine, Road
Haulage, Crushing-
Screening Plant
 
Hematite &
Goethite
 
1994
 
11.0
 
10.1
 
—%
 
100%
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1 Reported on a wet basis in millions of metric tons, equivalent to 2,205 pounds.
Koolyanobbing
The Koolyanobbing operations are located 250 miles east of Perth and approximately 30 miles northeast of the town of Southern Cross. Koolyanobbing produces lump and fines iron ore. Mining is conducted on multiple mineral leases having varying expiration dates. Mining leases routinely are renewed as they approach their respective expiration dates.
Over the past five years, the Koolyanobbing operation has produced between 10.1 million and 11.8 million metric tons of iron ore products annually. During 2017, ore material was sourced from ten separate open pit mines and was delivered by typical production trucks or road trains to a crushing and screening facility located at Koolyanobbing. All of the ore from the Koolyanobbing operations is transported by rail to the Port of Esperance, 360 miles to the south, for shipment to Asian customers.

34

Table of Contents

Mineral Policy
We have a corporate policy prescribing internal controls and procedures with respect to auditing and estimating of minerals. The procedures contained in the policy include the calculation of mineral estimates at each property by our engineers, geologists and accountants, as well as third-party consultants. Management compiles and reviews the calculations, and once finalized, such information is used to prepare the disclosures for our annual and quarterly reports. The disclosures are reviewed and approved by management, including our chief executive officer and chief financial officer. Additionally, the long-range mine planning and mineral estimates are reviewed annually by our Audit Committee. Furthermore, all changes to mineral estimates, other than those due to production, are adequately documented and submitted to senior operations officers for review and approval. Finally, periodic reviews of long-range mine plans and mineral reserve estimates are conducted at mine staff meetings, senior management meetings and by independent experts.
Mineral Reserves
Reserves are defined by SEC Industry Standard Guide 7 as that part of a mineral deposit that could be economically and legally extracted and produced at the time of the reserve determination. All reserves are classified as proven or probable and are supported by life-of-mine plans.
Reserve estimates are based on pricing that does not exceed the three-year trailing average index price of iron ore adjusted to our realized price. We evaluate and analyze mineral reserve estimates in accordance with our mineral policy and SEC requirements. The table below identifies the year in which the latest reserve estimate was completed.
Property
 
Date of Latest Economic
Reserve Analysis
U.S. Iron Ore
 
 
Tilden
 
2015
Hibbing
 
2015
Northshore
 
2015
United Taconite
 
2016
Asia Pacific Iron Ore
 
 
Koolyanobbing
 
2013
Ore reserve estimates for our iron ore mines as of December 31, 2017 were estimated from fully designed open pits developed using three-dimensional modeling techniques. These fully designed pits incorporate design slopes, practical mining shapes and access ramps to assure the accuracy of our reserve estimates. With the life of mine of the Koolyanobbing complex nearing an end, we are only reporting reserves at Asia Pacific Iron Ore that are planned to be extracted. All operations' reserves have been adjusted net of 2017 production.

35

Table of Contents

U.S. Iron Ore 
All tonnages reported for our U.S. Iron Ore operating segment are in long tons of 2,240 pounds, have been rounded to the nearest 100,000 and are reported on a 100% basis.
U.S. Iron Ore Mineral Reserves
as of December 31, 2017
(In Millions of Long Tons)
 
 
 
Proven
 
Probable
 
Proven & Probable
 
Saleable Product2,3
 
Previous Year
Property
Cliffs Share
 
Tonnage
% Grade
 
Tonnage
% Grade
 
Tonnage
% Grade5
 
Process Recovery4
Tonnage
 
Proven & Probable Crude Ore
Saleable Product
Tilden1
100
%
 
263.6

34.7

 
82.7

33.9

 
346.3

34.5

 
37%
129.2

 
367.8

136.3

Hibbing
23
%
 
154.0

19.6

 
24.7

19.6

 
178.7

19.6

 
26%
47.2

 
233.0

61.7

Northshore
100
%
 
235.8

24.9

 
557.4

24.2

 
793.2

24.4

 
32%
255.9

 
808.0

261.1

United Taconite
100
%
 
413.6

22.6

 
415.5

21.9

 
829.1

22.2

 
32%
264.6

 
842.8

269.3

Totals
 
 
1,067.0

 
 
1,080.3

 
 
2,147.3

 
 
 
696.9

 
2,251.6

728.4

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1 Tilden hematite reported grade is percent FeT; all other properties are percent magnetic iron. During 2017, our ownership interest in Tilden increased to 100%.
2 Saleable product is a standard pellet containing 60% to 66% Fe calculated from both proven and probable mineral reserves.
3 Saleable product is reported on a dry basis; shipped products typically contain 1% to 4% moisture.
4 Process recovery includes all factors for converting crude ore tonnage to saleable product.
5 Cutoff grades are 15% magnetic iron for Hibbing, 17% for United Taconite, 19% for Northshore. Cutoff for Tilden hematite is 25% FeT.
 
Asia Pacific Iron Ore
All tonnages reported for our Asia Pacific Iron Ore operating segment are in metric tons of 2,205 pounds, have been rounded to the nearest 100,000 and are reported on a 100% basis.
Asia Pacific Iron Ore Mineral Reserves
as of December 31, 2017
(In Millions of Metric Tons)1
 
 
 
Proven
 
Probable
 
Proven & Probable
 
Previous Year Total
Property
Cliffs Share
 
Tonnage
% Fe
 
Tonnage3
% Fe
 
Tonnage
% Fe2
 
Tonnage
Koolyanobbing
100%
 
1.7
56.5

 
8.0

59.6
 
9.7

59.1
 
42.7
 
 
 
 
 
 
 
 
 
 
 
 
 
1 Tonnages reported are saleable product reported on a dry basis; shipped products contain approximately 5% moisture.
2 Cutoff grade is 54% FeT.
3 Tonnage decreased due to low grade pellet discount increase which reduced the amount of economic tonnage available.
Item 3.
Legal Proceedings
Bluestone Litigation. On April 7, 2017, the Company was served with an Amended Complaint adding Cliffs, among others, as a defendant to a lawsuit brought by Bluestone Coal Corporation and Double-Bonus Mining Company against Pinnacle Mining Company, LLC and Target Drilling, Inc. in the U.S. District Court for the Southern District of West Virginia.  The Amended Complaint alleges that the defendants deviated from plans authorized by plaintiffs and U.S. Mine Safety and Health Administration in the drilling of a borehole in 2013 and 2014 at the Pinnacle mine and through an inactive portion of plaintiffs’ mine. Plaintiffs further allege negligence and trespass in the drilling of the borehole and claim compensatory and punitive damages due to flooding.  Cliffs denies it has any liability in connection with plaintiffs' claims and intends to vigorously defend the lawsuit.

36

Table of Contents

CCAA Proceedings. Refer to NOTE 20 - COMMITMENTS AND CONTINGENCIES for a description of the CCAA Proceedings underway with respect to the Bloom Lake Group and the Wabush Group. Such description is incorporated by reference into this Item 3.
ERISA Litigation. On May 14, 2015, a lawsuit was filed in the U.S. District Court for the Northern District of Ohio captioned Paul Saumer, individually and on behalf of all others similarly situated, v. Cleveland-Cliffs Inc., et al., No. 1:15-CV-00954. This action was purportedly brought on behalf of the Northshore and Silver Bay Power Company Retirement Savings Plan (the "Plan") and certain participants and beneficiaries of the Plan during the class period, defined in the complaint as April 2, 2012 to the present, against Cleveland-Cliffs Inc., its investment committee, Northshore, the Employee Benefits Administration Department of Northshore, and certain current and former officers. Plaintiff amended the complaint to name as defendants additional current and former employees who served on the investment committee. The suit alleged that the defendants breached their duties to the plaintiffs and the Plan in violation of ERISA fiduciary rules by, among other things, continuing to offer and hold Cleveland-Cliffs Inc. stock as a Plan investment option during the class period. The relief sought included a request for a judgment ordering the defendants to make good to the Plan all losses to the Plan resulting from the alleged breaches of fiduciary duties. On April 1, 2016, the Court granted defendants' motion to dismiss the lawsuit, which dismissal the Sixth Circuit Court of Appeals affirmed on April 1, 2017. All deadlines for further appeals have passed and this matter is closed.
Exchange Offer Litigation. On March 14, 2016, a putative class action was filed in the U.S. District Court for the Southern District of New York captioned Waxman, et al. v. Cleveland-Cliffs Inc., No. 1:16-cv-01899. Generally, the lawsuit alleged that the exchange offers for certain of our existing senior notes announced on January 27, 2016 violated the Trust Indenture Act of 1939 (the "TIA") and breached the indentures governing the senior notes subject to the exchange offers because the exchange offers were offered only to certain noteholders that were qualified institutional buyers ("QIBs") and not to non-QIBs. The suit sought class certification with respect to non-QIB noteholders of the 5.90% 2020 Senior Notes and the 6.25% 2040 Senior Notes (collectively, the “Class Notes”), which QIBs were permitted to exchange for newly-issued 1.5 Lien Notes. Plaintiffs alleged that the exchange offers had the effect of subordinating their Class Notes to those of the QIBs who elected to exchange their notes and also impaired the Plaintiffs’ rights to receive payment of the principal and interest under the Class Notes and to institute suit to compel such payment. In addition to alleged violation of the TIA and breach of contract, Plaintiffs sought unspecified damages for breach of the implied covenant of good faith and fair dealing and unjust enrichment, and also sought declaratory judgment that the exchange offers were null and void. On May 16, 2016, we filed a motion to dismiss this lawsuit, which was granted on December 6, 2016. All deadlines for further appeals have passed and this matter is closed.
Mesabi Metallics Adversary Proceeding. On September 7, 2017, Mesabi Metallics Company LLC (f/k/a Essar Steel Minnesota LLC) filed a complaint against Cleveland-Cliffs Inc. in the Essar Steel Minnesota LLC and ESML Holdings Inc. bankruptcy proceeding that is pending in the United States Bankruptcy Court, District of Delaware. Mesabi Metallics alleges tortious interference with its contractual rights and business relations involving certain vendors, suppliers and contractors, violations of federal and Minnesota antitrust laws through monopolization, attempted monopolization and restraint of trade, violation of the automatic stay, and civil conspiracy with unnamed defendants. Mesabi Metallics amended the complaint to add additional defendants Cleveland-Cliffs Minnesota Land Development Company ("Cliffs Minnesota Land") and Glacier Park Iron Ore Properties LLC ("GPIOP") and has asserted various claims relating to Cliffs Minnesota Land's acquisition of a combination of GPIOP's undivided and whole fee interests as well as mineral and surface leases, a portion of which were formerly leased by GPIOP to Mesabi Metallics. The amended complaint also includes claims related to avoidance and recovery of unauthorized post-petition transfers, claims disallowance, civil contempt and civil conspiracy. Mesabi Metallics seeks, among other things, unspecified damages, declaratory judgment, and injunctive relief. We believe the claims are unmeritorious and intend to vigorously defend the lawsuit.
Michigan Electricity Matters. See NOTE 20 - COMMITMENTS AND CONTINGENCIES for a description of the FERC proceedings to determine, among other things, allocation of SSR costs, whether retroactive surcharges are permissible and the total amount of SSR compensation, all of which are currently subject to appeal. Such description is incorporated by reference into this Item 3.
Taconite MACT Compliance Review. EPA Region 5 issued Notices of Violation during the first quarter of 2014 to Empire, Tilden and United Taconite related to alleged historical violations of the Taconite MACT rule and certain elements of the respective state-issued Title V operating permits. For issues not already resolved, the facilities continue to implement actions that mitigate any future exposures. EPA has proposed, and Cliffs has agreed to, a tolling agreement which targeted a completion of the enforcement action by June 6, 2018. Based on current information, Cliffs anticipates the final settlement for alleged exceedances at United Taconite to be resolved by consent decree with a total penalty of no more than $0.3 million to be comprised of a combination of cash penalty and a supplemental environmental project. EPA has not yet shared draft settlement documents for Empire or Tilden, but Cliffs anticipates receiving them early in 2018. This enforcement matter is not anticipated currently to have a material adverse impact on our business.

37

Table of Contents

Wabush Pensioners Matter. A complaint time-stamped May 31, 2017 was filed in the Supreme Court of Newfoundland and Labrador, Trial Division (General) captioned Johnson, et al. v. Cliffs Mining Company, et al. against Cliffs Natural Resources Inc., Cliffs Mining Company, and certain former and current officers, directors and employees, on behalf of all non-union employees and retirees of Wabush Mines, seeking, among other things, various declarations and damages relating to the “Contributory Salaried Plan for Salaried Employees of Wabush Mines, Cliffs Mining Company, Managing Agent, Arnaud Railway Company and Wabush Lake Railway Company, Limited”. A separate complaint captioned Skinner, et al. v. Cliffs Mining Company, et al. was apparently filed on or about June 23, 2017 in the same court against the same defendants alleging substantially the same allegations on behalf of certain USW union employees and retirees of Wabush Mines, seeking similar relief. We object to the validity of these claims and will vigorously defend as necessary.
Item 4.
Mine Safety Disclosures
We are committed to protecting the occupational health and well-being of each of our employees. Safety is one of our core values, and we strive to ensure that safe production is the first priority for all employees. Our internal objective is to achieve zero injuries and incidents across the Company by focusing on proactively identifying needed prevention activities, establishing standards and evaluating performance to mitigate any potential loss to people, equipment, production and the environment. We have implemented intensive employee training that is geared toward maintaining a high level of awareness and knowledge of safety and health issues in the work environment through the development and coordination of requisite information, skills and attitudes. We believe that through these policies, we have developed an effective safety management system.
Under the Dodd-Frank Act, each operator of a coal or other mine is required to include certain mine safety results within its periodic reports filed with the SEC. As required by the reporting requirements included in §1503(a) of the Dodd-Frank Act and Item 104 of Regulation S-K, the required mine safety results regarding certain mining safety and health matters for each of our mine locations that are covered under the scope of the Dodd-Frank Act are included in Exhibit 95 of Item 15. Exhibits and Financial Statement Schedules of this Annual Report on Form 10-K.

38

Table of Contents

PART II
Item 5.
Market for Registrant's Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities
Stock Exchange Information
Our common shares (ticker symbol CLF) are listed on the NYSE.
Common Share Price Performance and Dividends
The following table sets forth, for the periods indicated, the high and low sales prices per common share as reported on the NYSE:
 
 
2017
 
2016
 
 
High
 
Low
 
High
 
Low
First Quarter
 
$
12.37

 
$
7.70

 
$
3.75

 
$
1.20

Second Quarter
 
9.06

 
5.56

 
5.83

 
2.77

Third Quarter
 
8.77

 
6.45

 
8.45

 
5.19

Fourth Quarter
 
7.73

 
5.60

 
10.90

 
4.91

Year
 
12.37

 
5.56

 
10.90

 
1.20

At February 12, 2018, we had 1,210 shareholders of record.
We did not declare or pay any cash dividends on our common shares during the years ended December 31, 2017 or 2016. Any determination to pay dividends on our common shares in the future will be at the discretion of our Board of Directors and dependent upon then-existing conditions, including our operating results and financial condition, capital requirements, contractual restrictions, business prospects and other factors that our Board of Directors may deem relevant. Additionally, the agreement governing our ABL Facility contains, and agreements governing any of our future debt may contain, covenants and other restrictions that, in certain circumstances, could limit the level of dividends that we are able to pay on our common shares. There can be no assurance that we will pay a dividend in the future.


39

Table of Contents

Shareholder Return Performance
The following graph shows changes over the past five-year period in the value of $100 invested in: (1) Cliffs' common shares; (2) S&P 500 Stock Index; (3) S&P Total Market Index; and (4) S&P Metals and Mining Select Industry Index. The values of each investment are based on price change plus reinvestment of all dividends reported to shareholders, based on monthly granularity.
a5yrcumulativereturns17.jpg
 
 
 
2012
 
2013
 
2014
 
2015
 
2016
 
2017
Cleveland-Cliffs Inc.
Return %
 

 
(30.17)
 
(71.56)
 
(77.87)
 
432.28
 
(14.27)
 
Cum $
 
100.00

 
69.83
 
19.86
 
4.39
 
23.39
 
20.06
S&P 500 Index - Total Returns
Return %
 

 
32.36
 
13.65
 
1.38
 
11.93
 
21.80
 
Cum $
 
100.00

 
132.36
 
150.43
 
152.50
 
170.70
 
207.91
S&P Total Market Index
Return %
 

 
33.37
 
12.43
 
0.46
 
12.62
 
21.13
 
Cum $
 
100.00

 
133.37
 
149.95
 
150.64
 
169.65
 
205.49
S&P Metals and Mining
Return %
 

 
(5.35)
 
(25.63)
 
(50.76)
 
105.09
 
20.61
 
Cum $
 
100.00

 
94.65
 
70.39
 
34.66
 
71.09
 
85.74

40

Table of Contents

Issuer Purchases of Equity Securities
The following table presents information with respect to repurchases by us of our common shares during the periods indicated:
ISSUER PURCHASES OF EQUITY SECURITIES
Period
 
Total Number of Shares
(or Units) Purchased1
 
Average Price Paid per Share
(or Unit)
 
Total Number of Shares (or Units) Purchased as Part of Publicly Announced Plans or Programs
 
Maximum Number (or Approximate Dollar Value) of Shares (or Units) that May Yet be Purchased Under the Plans or Programs
October 1 - 31, 2017
 
1,259

 
$
7.15

 
 
November 1 - 30, 2017
 

 
$

 
 
December 1 - 31, 2017
 
735,387

 
$
6.71

 
 
Total
 
736,646

 
$
6.71

 
 
 
 
 
 
 
 
 
 
 
1 These shares were delivered to us to satisfy tax withholding obligations due upon the vesting or payment of stock awards.


41

Table of Contents

Item 6.
Selected Financial Data
Summary of Financial and Other Statistical Data - Cleveland-Cliffs Inc. and Subsidiaries
 
2017 (a)
 
2016 (b)
 
2015 (c)
 
2014 (d)
 
2013 (e)
Financial data (in millions, except per share amounts) *
 
 
 
 
 
 
 
 
  Revenue from product sales and services
$
2,330.2

 
$
2,109.0

 
$
2,013.3

 
$
3,373.2

 
$
3,890.8

  Cost of goods sold and operating expenses
(1,828.5
)
 
(1,719.7
)
 
(1,776.8
)
 
(2,487.5
)
 
(2,406.4
)
  Other operating expense
(78.1
)
 
(148.5
)
 
(85.2
)
 
(755.6
)
 
(104.1
)
  Operating income
423.6

 
240.8

 
151.3

 
130.1

 
1,380.3

Income from continuing operations
381.8

 
219.2

 
143.7

 
56.4

 
878.9

Loss from discontinued operations, net of tax
(18.7
)
 
(19.9
)
 
(892.1
)
 
(8,368.0
)
 
(517.1
)
  Net income (loss)
363.1

 
199.3

 
(748.4
)
 
(8,311.6
)

361.8

  Loss (income) attributable to noncontrolling interest
3.9

 
(25.2
)
 
(0.9
)
 
1,087.4

 
51.7

  Net income (loss) attributable to Cliffs shareholders
367.0

 
174.1

 
(749.3
)
 
(7,224.2
)

413.5

Preferred stock dividends

 

 
(38.4
)
 
(51.2
)
 
(48.7
)
  Income (loss) attributable to Cliffs common shareholders
$
367.0

 
$
174.1

 
$
(787.7
)
 
$
(7,275.4
)

$
364.8

Earnings (loss) per common share attributable to
Cliffs common shareholders - basic
 
 
 
 
 
 
 
 
 
     Continuing operations
$
1.34

 
$
0.98

 
$
0.63

 
$
(0.14
)
 
$
5.37

     Discontinued operations
(0.06
)
 
(0.10
)
 
(5.77
)
 
(47.38
)
 
(2.97
)
Earnings (loss) per common share attributable to
Cliffs common shareholders - basic
$
1.28

 
$
0.88

 
$
(5.14
)
 
$
(47.52
)
 
$
2.40

Earnings (loss) per common share attributable to
Cliffs common shareholders - diluted
 
 
 
 
 
 
 
 
 
     Continuing operations
$
1.32

 
$
0.97

 
$
0.63

 
$
(0.14
)
 
$
4.95

     Discontinued operations
(0.06
)
 
(0.10
)
 
(5.76
)
 
(47.38
)
 
(2.58
)
Earnings (loss) per common share attributable to
Cliffs common shareholders - diluted
$
1.26

 
$
0.87

 
$
(5.13
)
 
$
(47.52
)
 
$
2.37

Total assets
$
2,953.4

 
$
1,923.9

 
$
2,135.5

 
$
3,147.2

 
$
13,102.9

Long-term debt obligations (including capital leases)
$
2,335.1

 
$
2,213.5

 
$
2,755.6

 
$
2,911.5

 
$
2,968.4

Net cash provided by operating activities
$
338.1

 
$
303.0

 
$
37.9

 
$
358.9

 
$
1,145.9

Net cash used in investing activities
$
(156.0
)
 
$
(57.9
)
 
$
(103.2
)
 
$
(103.6
)
 
$
(811.3
)
Net cash provided by (used in) financing activities
$
498.9

 
$
(206.4
)
 
$
61.0

 
$
(288.3
)
 
$
(171.9
)
Distributions to preferred shareholders cash dividends (f)
 
 
 
 
 
 
 
 
 
  - Per depositary share
$

 
$

 
$
1.32

 
$
1.76

 
$
1.66

  - Total
$

 
$

 
$
38.4

 
$
51.2

 
$
48.7

Distributions to common shareholders cash dividends (g)
 
 
 
 
 
 
 
 
 
  - Per share
$

 
$

 
$

 
$
0.60

 
$
0.60

  - Total
$

 
$

 
$

 
$
92.5

 
$
91.9

Common shares outstanding - basic (millions)
 
 
 
 
 
 
 
 
 
  - Average for year
288.4

 
197.7

 
153.2

 
153.1

 
151.7

  - At year-end
297.4

 
233.1

 
153.6

 
153.2

 
153.1

 
 
 
 
 
 
 
 
 
Iron ore production and sales statistics
 
 
 
  (long tons in millions - U.S. Iron Ore; metric tons in millions - Asia Pacific Iron Ore)
Production tonnage - U.S. Iron Ore
25.5

 
23.4

 
26.1

 
29.7

 
27.2

                                - U.S. Iron Ore (Cliffs' share)
18.8

 
16.0

 
19.3

 
22.4

 
20.3

                                - Asia Pacific Iron Ore
10.1

 
11.8

 
11.7

 
11.4

 
11.1

Sales tonnage - U.S. Iron Ore
18.7

 
18.2

 
17.3

 
21.8

 
21.3

                                - Asia Pacific Iron Ore
9.8

 
11.6

 
11.6

 
11.5

 
11.0


42

Table of Contents

* Management determined as of March 31, 2015, that our North American Coal operating segment met the criteria to be classified as held for sale under ASC 205, Presentation of Financial Statements. The North American Coal segment continued to meet the criteria throughout 2015 until we sold our North American Coal operations during the fourth quarter of 2015. As such, all current and historical North American Coal operating segment results are included in our financial statements and classified within discontinued operations. On January 27, 2015, we announced that Bloom Lake General Partner Limited and certain of its affiliates, including Cliffs Quebec Iron Mining ULC, which we refer to collectively as the Bloom Lake Group, commenced restructuring proceedings, in Montreal, Quebec under the CCAA to address the Bloom Lake Group's immediate liquidity issues and to preserve and protect its assets for the benefit of all stakeholders while restructuring and/or sale options were explored. At that time, the Bloom Lake Group was no longer generating revenues and was not able to meet its obligations as they came due. As part of the CCAA process, the court approved the appointment of a Monitor and certain other financial advisors. Additionally, on May 20, 2015, the Wabush Iron Co. Limited and Wabush Resources Inc., and certain of their affiliates, including Wabush Mines (an unincorporated joint venture of Wabush Iron Co. Limited and Wabush Resources Inc.), Arnaud Railway Company and Wabush Lake Railway Company, which we refer to collectively as the Wabush Group, commenced restructuring proceedings in Montreal, Quebec under the CCAA. The Wabush Group was no longer generating revenues and was not able to meet its obligations as they came due. As a result of this action, the protection granted to the Bloom Lake Group was extended to include the Wabush Group to facilitate the reorganization of each of their businesses and operations. The Monitor appointed by the court in the CCAA proceeding for the Bloom Lake Group has also been appointed by the court as the Monitor in the CCAA proceeding for the Wabush Group. Financial results prior to the respective deconsolidations of the Bloom Lake and Wabush Groups and subsequent expenses directly associated with the Bloom Lake and Wabush Groups and certain other wholly-owned Canadian subsidiaries are included in our financial statements and classified within discontinued operations.
(a) During 2017, we issued 63.25 million common shares in an underwritten public offering. We received net proceeds of $661.3 million at a public offering price of $10.75 per common share. The net proceeds from the issuance of our common shares and the net proceeds from the issuance of $1.075 billion 5.75% 2025 Senior Notes were used to redeem in full all of our outstanding 8.25% 2020 First Lien Notes, 8.00% 2020 1.5 Lien Notes and 7.75% 2020 Second Lien Notes. Additionally, through tender offers, we purchased certain of our 5.90% 2020 Senior Notes, our 4.80% 2020 Senior Notes and our 4.875% 2021 Senior Notes. The aggregate principal amount outstanding of debt redeemed was $1.611 billion, which resulted in a loss on extinguishment of $165.4 million. During 2017, our ownership interest in Empire increased to 100% as we reached an agreement to distribute the noncontrolling interest net assets of $132.7 million to ArcelorMittal, in exchange for its interest in Empire. We also acquired the remaining 15% equity interest in Tilden Mining Company L.C. owned by United States Steel Corporation for $105.0 million. Prior to the end of the year Public Law 115–97, commonly known as the “Tax Cuts and Jobs Act”, was signed into law and among other items repeals the corporate AMT and will reduce the federal corporate tax rate to 21% for tax years beginning January 1, 2018.  Along with the repeal of AMT, Public Law 115–97 provides that existing AMT credit carryovers are refundable beginning with the filing of the calendar year 2018 tax return. We have $235.3 million of AMT credit carryovers that are expected to be fully refunded between 2019 and 2022.
(b) During 2016, we recorded a net gain of $166.3 million related to debt restructuring activities that occurred throughout the year, including the issuance of $218.5 million aggregate principal of 8.00% 2020 1.5 Lien Notes in exchange for $512.2 of our existing senior notes, the issuance of an aggregate of 8.2 million common shares in exchange for $56.9 million aggregate principal amount of our existing senior notes and a loss on the redemption of the full $283.6 million outstanding of our 3.95% 2018 Senior Notes at a total redemption price of $301.0 million. We also issued 44.4 million common shares in an underwritten public offering. We received net proceeds of $287.6 million at a public offering price of $6.75 per common share.
(c) On January 27, 2015, we announced the Bloom Lake Group commenced restructuring proceedings in Montreal, Quebec under the CCAA. Additionally, on May 20, 2015, the Wabush Group commenced restructuring proceedings in Montreal, Quebec under the CCAA. As a result of this action, the CCAA protections granted to the Bloom Lake Group was extended to include the Wabush Group to facilitate the reorganization of each of their businesses and operations. Consistent with our strategy to extract maximum value from our current assets, on December 22, 2015, we sold our equity interests in all the remaining North American Coal operations to Seneca. The sale included the Pinnacle mine in West Virginia and the Oak Grove mine in Alabama. Additionally, Seneca may pay Cliffs an earn-out of up to $50 million contingent upon the terms of a revenue sharing agreement, which extends through the year 2020. As noted above, all current and historical North American Coal operating segment results are included in our financial statements and classified within discontinued operations.
(d) During 2014, we recorded an impairment of goodwill and other long-lived assets of $635.5 million. The goodwill impairment charge of $73.5 million related to our Asia Pacific Iron Ore reporting unit. There were also other long-lived asset impairment charges of $562.0 million related to our continuing operations including the Asia Pacific Iron Ore operating segment and our Other reportable segments. The other long-lived asset impairment charges which related to our discontinued operations were $8,394.4 million related to our Wabush operation and Bloom Lake operation within our Eastern Canadian Iron Ore operating segment, and our CLCC thermal operation, Oak Grove operation and Pinnacle operation within our North American Coal operating segment, along with impairments charged to reporting units within our other reportable segments. The impairment charges were primarily a result of changes in life-of-mine cash flows due to declining pricing for both global iron ore and low-volatile metallurgical coal, which impacts our estimate of long-term pricing, along with changes in strategic focus including exploratory phases of possible divestiture of the operations as the new Chief Operating Decision Maker viewed Eastern Canadian Iron Ore, Asia Pacific Iron Ore, North American Coal and Ferroalloys as non-core assets. The CLCC assets were sold in the fourth quarter of 2014 on December 31, 2014, resulting in a loss on sale of $419.6 million. As noted above, all current and historical North American Coal operating segment results are included in our financial statements and classified within discontinued operations.
(e) Upon performing our annual goodwill impairment test in the fourth quarter of 2013, a goodwill impairment charge of $80.9 million was recorded for our Cliffs Chromite Ontario and Cliffs Chromite Far North reporting units within our Ferroalloys operating segment. We also recorded other long-lived asset impairment charges of $169.9 million, of which $154.6 million relates to our Wabush reporting unit within our Eastern Canadian Iron Ore operating segment to reduce those assets to their estimated fair value as of December 31, 2013. These reporting units were included within the entities under the CCAA filing. As noted above, financial results prior to the respective deconsolidations of the Bloom Lake and Wabush Groups and subsequent expenses directly associated with the Canadian Entities are included in our financial statements and classified within discontinued operations.
(f) On March 20, 2013, our Board of Directors declared a cash dividend of $13.6111 per preferred share, which is equivalent to $0.34 per depositary share. The cash dividend was paid on May 1, 2013, to our preferred shareholders of record as of the close of business on April 15, 2013. On May 7, 2013, September 9, 2013, and November 11, 2013, our Board of Directors declared a quarterly cash dividend of $17.50 per preferred share, which is equivalent to $0.44 per depositary share. The cash dividends were paid on August 1, 2013, November 1, 2013, and February 3, 2014 to our preferred shareholders of record as of the close of business on July 15, 2013, October 15, 2013, and January 15, 2014, respectively. On February 11, 2014, May 13, 2014, September 8, 2014, and November 19, 2014, our Board of Directors declared a quarterly cash dividend of $17.50 per preferred share, which is equivalent to $0.44 per depositary share. The cash dividends were paid on May 1, 2014, August 1, 2014, November 3, 2014, and February 2, 2015, to our preferred shareholders of record as of the close of business on April 15, 2014, July 15, 2014, October 15, 2014, and January 15, 2015, respectively. On March 27, 2015, July 1, 2015, and September 10, 2015, our Board of Directors declared the quarterly cash dividend of $17.50 per preferred share, which is equivalent to $0.44 per depositary share. The cash dividend was paid on May 1, 2015, August 3, 2015, and November 2, 2015 to our shareholders of record as of the close of business on April 15, 2015, July 15, 2015, and October 15, 2015, respectively. On January 4, 2016, we announced that our Board of Directors determined the final quarterly dividend of our preferred shares would not be paid in cash, but instead, pursuant to the terms of the preferred shares, the conversion rate was increased such that holders of the preferred shares received additional common shares in lieu of the accrued dividend at the time of the mandatory conversion of the preferred shares on February 1, 2016. The number of our common shares in the aggregate issued in lieu of the dividend was 1.3 million. This resulted in an effective conversion rate of 0.9052 common shares, rather than 0.8621 common shares, per depositary share, each representing 1/40th of a preferred share. Upon conversion on February 1, 2016, an aggregate of 26.5 million common shares were issued, representing 25.2 million common shares issuable upon conversion and 1.3 million that were issued in lieu of a final cash dividend.

43

Table of Contents

(g) On February 11, 2013, our Board of Directors approved a reduction to our quarterly cash dividend rate by 76% to $0.15 per share. The decreased dividend of $0.15 per share was paid on March 1, 2013, June 3, 2013, September 3, 2013, and December 2, 2013 to our common shareholders of record as of the close of business on February 22, 2013, May 17, 2013, August 15, 2013, and November 22, 2013, respectively. Additionally, in 2014, the dividend of $0.15 per share was paid on March 3, 2014, June 3, 2014, September 2, 2014 and December 1, 2014 to our common shareholders of record as of the close of business on February 21, 2014, May 23, 2014, August 15, 2014, and November 15, 2014, respectively. On January 26, 2015, we announced that our Board of Directors had decided to eliminate the quarterly dividend of $0.15 per share on our common shares. The decision was applicable to the first quarter of 2015 and all subsequent quarters.

44

Table of Contents

Item 7.
Management's Discussion and Analysis of Financial Condition and Results of Operations
Management's Discussion and Analysis of Financial Condition and Results of Operations ("MD&A") is designed to provide a reader of our financial statements with a narrative from the perspective of management on our financial condition, results of operations, liquidity and other factors that may affect our future results. The following discussion should be read in conjunction with the consolidated financial statements and related notes that appear elsewhere in this document.
Industry Overview
The key driver of our business is demand for steelmaking raw materials from U.S. steelmakers. During 2017, the U.S. produced approximately 82 million metric tons of crude steel, which is up 4% when compared to 2016, or about 5% of total global crude steel production. U.S. total steel capacity utilization was approximately 74% during 2017, which is an approximate 3% increase from 2016. Additionally, during 2017, China produced approximately 832 million metric tons of crude steel, or approximately 50% of total global crude steel production. These figures represent an approximate 6% increase in Chinese crude steel production when compared to 2016. Throughout 2017, global crude steel production increased about 5% compared to 2016.
The Platts 62% Price increased 22% to an average price of $71 per metric ton for the year ended December 31, 2017 compared to 2016. Volatility in the iron ore price impacts our realized revenue rates at each of our segments to varying extents, but our revenue realizations are not fully correlated. Pricing mechanisms in our U.S. Iron Ore contracts reference this metric, but build in reasonable protection from swings in volatility. Asia Pacific Iron Ore revenue rates do not see a full correlation to the Platts 62% Price due to the discounts on the lower iron content of the ore sold there.
We recognize the volatility of iron ore supply-demand dynamics and that changes in behaviors of the major iron ore producers and/or Chinese steelmakers could either lift or put pressure on iron ore prices in the near term. During 2017, we were generally pleased with both the signs of supply discipline from the major iron ore mining companies and record levels of Chinese steel production. We expect the healthy dynamics to continue through at least the beginning of 2018.
We have also noticed vastly improved demand for higher grade iron ore products, typically those of benchmark grade (62% iron content) and above, as Chinese mills put more emphasis on the productive and environmentally friendly nature of these ores. Assuming the margins at Chinese mills remain strong and the government continues to crack down on pollution, we believe that the mills will favor benchmark quality ore, placing additional pricing pressure on lower quality ore. This flight to quality has also manifested itself in increased pellet premiums throughout the world during 2017. The Atlantic Basin pellet premium, another important pricing factor in our U.S. Iron Ore contracts, averaged $45 per metric ton in 2017, a 42% increase compared to 2016. We believe this market will remain tight during 2018, thus supporting multi-year high premiums for pellet products.
The price for domestic hot-rolled coil steel, which is an important attribute in the calculation of supplemental revenue in one of our customer supply agreements, averaged $620 per net ton in 2017, 18% higher compared to last year. Despite the decrease in U.S. automobile demand this year, the domestic price environment has recovered due to supply-side discipline and improved U.S. manufacturing output. In addition, steel market reform in China has kept foreign steel prices high, thus making imports of hot-rolled coil steel into the U.S. less attractive. As a result, we remain positive on our outlook for this market.
Our consolidated revenues were $2.3 billion and $2.1 billion for the years ended December 31, 2017 and 2016, respectively, with net income from continuing operations per diluted share of $1.32 and $0.97, respectively. Net income from continuing operations for 2017 was positively impacted by an income tax benefit of $252.4 million primarily as a result of tax reform legislation. In addition, sales margin increased by $112.4 million in the year ended December 31, 2017 when compared to 2016, primarily driven by the increase in revenue from higher overall average realized product revenue rates and higher sales volumes at our U.S. Iron Ore operations. Net income from continuing operations was negatively impacted as a result of losses on extinguishment of debt of $165.4 million in the year ended December 31, 2017, while the year ended December 31, 2016 was positively impacted as a result of gains on extinguishment/restructuring of debt of $166.3 million.


45

Table of Contents

Strategy
We are Focused on Protecting our Core U.S. Iron Ore Business
We are the market-leading iron ore producer in the U.S., supplying differentiated iron ore pellets under long-term contracts to major North American blast furnace steel producers. We have the unique advantage of being a low-cost, high-quality producer of iron ore pellets in the Great Lakes market with significant transportation and logistics advantages to serve the Great Lakes steel market effectively. The pricing structure and long-term nature of our existing contracts, along with our low-cost operating profile, position U.S. Iron Ore as a strong cash flow generator in most commodity pricing environments. Since instituting our strategy in 2014 of focusing on this core business, we have achieved significant accomplishments, including providing volume certainty by signing a ten-year supply agreement with our largest customer; substantially reducing operating costs by making operational improvements; and developing new pellet products to meet ever-evolving market demands.
We recognize the importance of our strength in the U.S. Iron Ore business, and our top strategic priority is to protect and enhance our market position. This involves continuing to deliver high-quality, custom-made pellets that allow our customers to remain competitive in the quality, production efficiency, and environmental friendliness of their steel products. Protecting the core business also involves continually evaluating opportunities to expand both our production capacity and ore reserve life. In 2017, we achieved key accomplishments toward these goals by acquiring the remaining minority stake in our Tilden and Empire mines as well as additional real estate interests in Minnesota.
Expanding our Customer Base
While we hold a strong market position in supplying iron ore to Great Lakes blast furnaces, we cannot ignore the ongoing shift of steelmaking share in the U.S. away from our core blast furnace customers to EAF steelmakers. Over the past 25 years, the market share of EAFs has nearly doubled. However, as EAFs have moved to higher value steel products, they require more high-quality iron ore-based metallics instead of scrap as raw material feedstock. As a result of this trend, one of our top strategic priorities is to become a critical supplier of the EAF market by providing these specialized metallics. In June 2017, we announced the planned construction of an HBI production plant in Toledo, Ohio. HBI is a specialized high-quality iron alternative to scrap that, when used as a feedstock, allows the EAF to produce more valuable grades of steel. We expect our HBI to partially replace the over 3 million metric tons of ore-based metallics that are imported into the Great Lakes every year from Russia, Ukraine, Brazil and Venezuela.
Our Toledo plant is expected to produce HBI at a rate of 1.6 million metric tons per year when brought to production in 2020. We expect that this will create additional demand for our DR-grade pellets of 2.5 million long tons. Not only does this production plant create another outlet for our high-margin pellets, but it also presents an attractive economic opportunity for us. As the only producer of DR-grade pellets in the Great Lakes and with access to abundant, low-cost natural gas, we will be in a unique position to serve clients in the region. In addition, the Toledo site is in close proximity to over 20 EAFs, giving us a natural competitive freight advantage over import competitors.
Optimized, Divested or Shut Down All Non-Core Business Segments
Given the current price discounting environment for low-grade iron ore products containing less than 62% Fe, we are focused on optimizing the remaining ore reserve base of our Asia Pacific Iron Ore business. We will continue to operate Asia Pacific Iron Ore with very low total capital expenditures until we cease mining operations, which we expect to occur at some point during 2018.
Restructuring proceedings were commenced under the CCAA for the Bloom Lake Group, part of our Eastern Canadian Iron Ore businesses, in the first quarter of 2015. During the second quarter of 2015, the CCAA protection granted to the Bloom Lake Group was extended to include the Wabush Group to facilitate the reorganization of each of their businesses and operations. As of December 31, 2017, CCAA proceedings are still ongoing. The Monitor appointed by the court in the CCAA proceedings for the Bloom Lake Group and the Wabush Group has conducted a claims process pursuant to which creditors have filed claims against the Bloom Lake Group and the Wabush Group. The Monitor is reviewing all claims filed as part of this claims process. Currently, there is uncertainty as to the amount of the distribution that will be made to the creditors of the Bloom Lake Group and the Wabush Group, including, if any, to us, and whether we could be held liable for claims that may be asserted by or on behalf of the Bloom Lake Group or the Wabush Group or by their respective representatives against non-debtor affiliates of the Bloom Lake Group and the Wabush Group. During 2017, we became aware that it was probable the Monitor will assert a preference claim against us and/or certain of our affiliates. Given that it is probable the claim will be asserted by the Monitor, we have recorded an estimated liability of $55.6 million, which includes the value of our related-party claims against the Bloom Lake Group and the Wabush Group. Should the Monitor proceed to assert the claim, we believe the Monitor will demand an amount in excess of the

46

Table of Contents

value of our related-party claims against the Bloom Lake Group and the Wabush Group. Thus, it is possible that a change in the estimated liability may occur in the future. We deny liability for any amount and will vigorously defend such claim.
On December 22, 2015, we closed the sale of our remaining North American Coal business, which included the Pinnacle mine in West Virginia and the Oak Grove mine in Alabama, to Seneca. The sale marked our exit from the coal business and represented another very important step in the implementation of our U.S. Iron Ore pellet-centric strategy. Prior to this sale, it was determined by management as of March 31, 2015 that our North American Coal operating segment met the criteria to be classified as held for sale under ASC 205, Presentation of Financial Statements.
Maintaining Discipline on Costs and Capital Spending and Improving our Financial Flexibility
We believe our ability to execute our strategy is dependent on our improving financial position, balance sheet strength and financial flexibility, which will enable us to manage through the inherent cyclical demand for our products and volatility in commodity prices. Our streamlined organization and support functions are well-aligned to best serve our strategic direction. Our capital allocation plan is focused on strengthening and protecting our core U.S. Iron Ore operations and expanding our customer base.
As the implementation of our strategy has strengthened the business, we have put additional emphasis on the continued improvement of our balance sheet via continued reduction of long-term debt. Since the middle of 2014, we have reduced the principal of our debt by 15% and decreased our average cost of debt to 5% by using various liability management strategies consistent with our capital allocation priorities and our stated objective of improving the strength of our balance sheet and simplifying the capital structure. Given the cyclical nature of our business, we will continue to be opportunistic in managing our balance sheet and capital structure, which will put us in an optimal position to manage through any commodity environment, and we continue to seek the best opportunities to accomplish this.
Competitive Strengths
Resilient U.S. Iron Ore Operations
The U.S. Iron Ore segment is the primary contributor to our consolidated results, generating $1,866.0 million of consolidated revenue and $559.4 million of consolidated Adjusted EBITDA for the year ended December 31, 2017. U.S. Iron Ore produces differentiated iron ore pellets that are customized for use in customers’ blast furnaces as part of the steelmaking process. The grades of pellets currently delivered to each customer are based on that customer’s preferences, which depend in part on the characteristics of the customer’s blast furnace operation. We believe our long history of supplying customized pellets to the U.S. steel producers has resulted in a co-dependent relationship between us and our customers. This technical and operational co-dependency has enabled us to claim a substantial portion of the total U.S. iron ore market. Based on our equity ownership in our U.S. mines, our share of the annual rated production capacity is 21.2 million long tons, representing 42% of total U.S. annual pellet capacity. Long-lived assets with an average mine life of approximately 30 years provide the opportunity to maintain our significant market position well into the future.
We believe U.S. Iron Ore is uniquely positioned in the global iron ore market due to its muted exposure to seaborne iron ore pricing. More than half of U.S. Iron Ore production is sold through long-term contracts that are structured with various formula-based pricing mechanisms that reference spot iron ore pricing, domestic steel prices, and Atlantic-based pellet premiums, among other items, and mitigate the impact of any one factor's price volatility on our business.
In addition, we maintain a freight advantage compared to our competition as a result of our proximity to U.S. steelmaking operations. The Great Lakes market is largely isolated and difficult to enter. Our costs are lower as a result of inherent transportation advantages associated with our mine locations near the Great Lakes, which allows for transportation via railroads and loading ports. U.S. Iron Ore mines also benefit from on-site pellet production and ore production facilities located a short distance from the mines.
Recent Developments
On December 22, 2017, President Trump signed into law “Public Law 115–97”, commonly known as the “Tax Cuts and Jobs Act”, which, among other things, repeals the corporate AMT and will reduce the federal corporate tax rate to 21% for tax years beginning January 1, 2018.  Along with the repeal of AMT, Public Law 115–97 provides that existing AMT credit carryovers are refundable beginning with the filing of the calendar year 2018 tax return. We have $235.3 million of AMT credit carryovers that are expected to be fully refunded between 2019 and 2022. The tax reform legislation is a comprehensive bill containing several other provisions, such as limitations on the deductibility of interest expense and certain executive compensation, that are not expected to have a material effect on us due to our large net operating loss position, our ability to access the historic losses with no limitations as described in Public Law 115–97, and our full

47

Table of Contents

valuation allowance position. The ultimate impact of the tax reform legislation may differ from our current estimates due to changes in the interpretations and assumptions made as well as additional regulatory guidance that may be issued.
During the fourth quarter of 2017, we completed an acquisition of certain real estate interests located in Itasca County west of Nashwauk, Minnesota from Glacier Park Iron Ore Properties LLC. The interests include a combination of undivided and whole fee interests as well as mineral and surface leases, all lying within the Biwabik Iron Formation. The acreage acquired is approximately 553 acres and the acreage being leased is approximately 3,215 acres.
We completed an issuance of $400.0 million aggregate principal amount of 4.875% 2024 Senior Secured Notes in a private transaction exempt from the registration requirements of the Securities Act on December 19, 2017. In addition, we issued $316.25 million aggregate principal amount of 1.50% 2025 Convertible Senior Notes. We intend to use the net proceeds from these offerings to fund a substantial portion of our HBI project in Toledo, Ohio, for upgrades at the Northshore plant to enable it to produce significantly increased levels of DR-grade pellets that could be used as feedstock for the HBI production plant and/or sold commercially and general corporate purposes.
Business Segments
The Company’s primary continuing operations are organized and managed according to product category and geographic location: U.S. Iron Ore and Asia Pacific Iron Ore.
Results of Operations – Consolidated
2017 Compared to 2016
On January 25, 2018, we furnished a Current Report on Form 8-K to the SEC that included a news release issued that same day announcing the fourth-quarter and full-year financial results for the period ended December 31, 2017, which was furnished as Exhibit 99.1 thereto (the Earnings Release).  The Earnings Release reported: (a) net income attributable to Cliffs shareholders of $317.8 million and $374.9 million; (b) earnings per common share attributable to Cliffs shareholders - diluted of $1.05 and $1.28; and (c) Adjusted EBITDA of $129.2 million and $512.8 million, each for the three and twelve months ended December 31, 2017.  The Statements of Consolidated Operations and accompanying notes in this Annual Report on Form 10-K reports (a) net income attributable to Cliffs shareholders of $309.9 million and $367.0 million; (b) earnings per common share attributable to Cliffs shareholders - diluted of $1.03 and $1.26; and (c) Adjusted EBITDA of $121.3 million and $504.9 million, each for the three and twelve months ended December 31, 2017.  Subsequent to the Earnings Release, we determined that the ARO liability recorded at Asia Pacific Iron Ore did not adequately reflect that expected costs to be incurred at the end of mine life.  Accordingly, we recorded an entry to fully reflect the estimated ARO cost.
The following is a summary of our consolidated results of operations for the years ended December 31, 2017 and 2016:
 
(In Millions)
 
2017
 
2016
 
Variance
Favorable/
(Unfavorable)
Revenues from product sales and services
$
2,330.2

 
$
2,109.0

 
$
221.2

Cost of goods sold and operating expenses
(1,828.5
)
 
(1,719.7
)
 
(108.8
)
Sales margin
$
501.7

 
$
389.3

 
$
112.4

Sales margin %
21.5
%
 
18.5
%
 
3.0
%
Revenues from Product Sales and Services
Revenues from product sales and services increased by $175.7 million or 9.2%, excluding the increase in freight and reimbursements of $45.5 million, for the year ended December 31, 2017 compared to the prior year, which was driven by an increase in realized revenue rate of 16.3% or $228.2 million and increased iron ore sales volumes of 0.5 million long tons or $36.7 million from our U.S. Iron Ore operations compared to the prior year. These increases were offset partially by the decrease in sales volume of 1.8 million metric tons or $81.0 million and a decrease in realized revenue rate of 1.2% or $4.9 million from our Asia Pacific Iron Ore operations compared to the prior year.
Refer to “Results of Operations – Segment Information" for additional information regarding the specific factors that impacted revenue during the period.

48

Table of Contents

Cost of Goods Sold and Operating Expenses
Cost of goods sold and operating expenses increased by $63.3 million or 4.2%, excluding the increase in freight and reimbursements of $45.5 million, for the year ended December 31, 2017 compared to the prior year, which was primarily due to increased production cost rates across all operations that resulted in increased costs of $157.0 million and increased sales volumes from our U.S. Iron Ore operations that resulted in $18.4 million of additional costs. These increases were offset partially by incrementally lower idle costs in our U.S. Iron Ore operations of $54.7 million and lower iron ore sales volumes from our Asia Pacific Iron Ore operations for the year ended December 31, 2017 compared to the prior year that resulted in lower costs of $69.3 million.
Refer to “Results of Operations – Segment Information” for additional information regarding the specific factors that impacted our operating results during the period.
Other Operating Income (Expense)
The following is a summary of Other operating income (expense) for the years ended December 31, 2017 and 2016:
 
(In Millions)
 
2017
 
2016
 
Variance
Favorable/
(Unfavorable)
Selling, general and administrative expenses
$
(105.8
)
 
$
(117.8
)
 
$
12.0

Miscellaneous - net
27.7

 
(30.7
)
 
58.4

 
$
(78.1
)
 
$
(148.5
)
 
$
70.4

Selling, general and administrative expenses during the year ended December 31, 2017 decreased $12.0 million over 2016. The favorable variance for the year ended December 31, 2017 was driven by a $4.1 million decrease in incentive compensation and $3.5 million of union signing bonuses in 2016, which were not repeated in the 2017. In addition, external services costs, excluding costs for early stage HBI project spending, decreased by $5.4 million for the year ended December 31, 2017 compared to the prior year. These favorable variances were offset partially by early-stage HBI project spending of $2.3 million.
The following is a summary of Miscellaneous - net for the years ended December 31, 2017 and 2016:
 
(In Millions)
 
2017
 
2016
 
Variance
Favorable/
(Unfavorable)
Foreign exchange remeasurement
$
11.4

 
$
(16.8
)
 
$
28.2

Michigan Electricity Matters accrual
1.3

 
(12.4
)
 
13.7

Management and royalty fees
5.1

 
9.0

 
(3.9
)
Empire idle costs
5.0

 
(8.2
)
 
13.2

Gain (loss) on disposal of assets
0.9

 
(4.8
)
 
5.7

Other
4.0

 
2.5

 
1.5

 
$
27.7

 
$
(30.7
)
 
$
58.4

For the year ended December 31, 2017, there was an incrementally favorable impact of $28.2 million driven by the change in foreign exchange remeasurement of short-term intercompany loans that are denominated in currency that is not the functional currency of the entity that holds the loans. There was an incrementally favorable impact of $13.2 million in Empire mine idle costs driven primarily by an asset retirement obligation adjustment. In addition, there was an incrementally favorable consolidated impact of $13.7 million related to the FERC ruling on the Michigan Electricity Matters that was recorded in the third quarter of 2016 and adjusted in the fourth quarter of 2017.

49

Table of Contents

Other Income (Expense)
The following is a summary of Other income (expense) for the years ended December 31, 2017 and 2016:
 
(In Millions)
 
2017
 
2016
 
Variance
Favorable/
(Unfavorable)
Interest expense, net
$
(132.0
)
 
$
(200.5
)
 
$
68.5

Gain (loss) on extinguishment/restructuring of debt
(165.4
)
 
166.3

 
(331.7
)
Other non-operating income
3.2

 
0.4

 
2.8

 
$
(294.2
)
 
$
(33.8
)
 
$
(260.4
)
The loss on extinguishment/restructuring of debt for the year ended December 31, 2017 of $165.4 million was related to the repurchase of certain of our unsecured senior notes and the redemption in full of certain of our then-outstanding secured notes. This compares to a gain of $166.3 million for the year ended December 31, 2016, primarily related to the issuance of our 8.00% 2020 1.5 Lien Notes through an exchange offer on March 2, 2016.
Interest expense, net for the year ended December 31, 2017, had a favorable variance of $68.5 million versus the prior year, predominantly as a result of the debt restructuring activities that occurred throughout 2017. These debt restructurings resulted in a reduction of our effective interest rate to 5.8% and extended our debt maturities.
Refer to NOTE 5 - DEBT AND CREDIT FACILITIES for further discussion.
Income Taxes
Our tax rate is affected by permanent items, such as depletion and the relative amount of income we earn in various foreign jurisdictions with tax rates that differ from the U.S. statutory rate. It also is affected by discrete items that may occur in any given period, but are not consistent from period to period. The following represents a summary of our tax provision and corresponding effective rates for the years ended December 31, 2017 and 2016:
 
(In Millions)
 
2017
 
2016
 
Variance
Income tax benefit
$
252.4

 
$
12.2

 
$
240.2

Effective tax rate
(195.0
)%
 
(5.9
)%
 
(189.1
)%

50

Table of Contents

A reconciliation of our income tax attributable to continuing operations compared to the U.S. federal statutory rate for the years ended December 31, 2017 and 2016 is as follows:
 
 
(In Millions)
 
 
2017
 
2016
Tax at U.S. statutory rate of 35%
 
$
45.3

 
35.0
 %
 
$
72.5

 
35.0
 %
Increase (decrease) due to:
 
 
 
 
 
 
 
 
Impact of tax law change - remeasurement of deferred taxes
 
407.5

 
314.8

 
149.1

 
72.0

Prior year adjustments in current year
 
(1.1
)
 
(0.8
)
 
(11.8
)
 
(5.7
)
Valuation allowance build (reversal)
 
 
 
 
 
 
 
 
Tax law change - remeasurement of deferred taxes
 
(407.5
)
 
(314.8
)
 
(149.1
)
 
(72.0
)
Current year activity
 
(471.7
)
 
(364.4
)
 
93.9

 
45.4

Repeal of AMT
 
(235.3
)
 
(181.7
)
 

 

Prior year adjustments in current year
 
(3.0
)
 
(2.4
)
 
6.5

 
3.1

Tax uncertainties
 
(1.4
)
 
(1.1
)
 
(11.3
)
 
(5.5
)
Worthless stock deduction
 

 

 
(73.4
)
 
(35.5
)
Impact of foreign operations
 
475.4

 
367.2

 
(42.7
)
 
(20.6
)
Percentage depletion in excess of cost depletion
 
(61.6
)
 
(47.6
)
 
(36.1
)
 
(17.4
)
Non-taxable loss (income) related to noncontrolling interests
 
1.3

 
1.0

 
(8.8
)
 
(4.2
)
State taxes, net
 
(0.1
)
 

 
0.4

 
0.2

Other items, net
 
(0.2
)
 
(0.2
)
 
(1.4
)
 
(0.7
)
Provision for income tax benefit and effective income tax rate including discrete items
 
$
(252.4
)
 
(195.0
)%
 
$
(12.2
)
 
(5.9
)%
Our tax provision for the year ended December 31, 2017 was a benefit of $252.4 million and a negative 195.0% effective tax rate compared with a benefit of $12.2 million and an effective tax rate of negative 5.9% for the prior year. The increase in income tax benefit from the prior year is primarily due to the repeal of AMT through U.S. income tax reform legislation. The impact of tax law change due to remeasurement of deferred taxes primarily relates to the statutory rate reduction in the U.S. that decreased the deferred tax assets by $334.1 million and the Luxembourg rate reduction that decreased the deferred tax assets by $73.4 million. Both of these asset reductions were fully offset by a decrease in valuation allowance. The impact of foreign operations relates to income and losses in foreign jurisdictions where the statutory rates, ranging from 0% to 30%, differ from the U.S. statutory rate of 35%.
See NOTE 9 - INCOME TAXES for further information.
Loss from Discontinued Operations, net of tax
During the year ended December 31, 2017, the Wabush Scully Mine was sold as part of the ongoing CCAA proceedings for the Wabush Group, which resulted in a net gain of $31.4 million within Loss from Discontinued Operations, net of tax.  During the year ended December 31, 2017, we recorded a net loss from discontinued operations, net of tax, of $18.7 million, primarily due to recording an estimated liability of $55.6 million related to the probable assertion of a preference claim against the Company which is classified as Contingent claims in the Statements of Consolidated Financial Position, partially offset by the gain discussed above. We recorded a loss from discontinued operations of $19.9 million for the year ended December 31, 2016.
Refer to NOTE 14 - DISCONTINUED OPERATIONS for further information.
Noncontrolling Interest
During 2017, our ownership interest in Empire increased to 100% as we reached an agreement to distribute the noncontrolling interest net assets of $132.7 million to ArcelorMittal, in exchange for its interest in Empire. The agreement had no direct impact on the Loss (income) attributable to noncontrolling interest in the Statements of Consolidated Operations. However, for the year ended December 31, 2017, the Empire mine was indefinitely idled resulting in a loss attributable to the noncontrolling interest of $3.9 million. In comparison, during the year ended December 31, 2016, the Empire mine was operating and had income of $25.2 million attributable to the noncontrolling interest.

51

Table of Contents

Results of Operations – Consolidated
2016 Compared to 2015
The following is a summary of our consolidated results of operations for the years ended December 31, 2016 and 2015:
 
(In Millions)
 
2016
 
2015
 
Variance
Favorable/
(Unfavorable)
Revenues from product sales and services
$
2,109.0

 
$
2,013.3

 
$
95.7

Cost of goods sold and operating expenses
(1,719.7
)
 
(1,776.8
)
 
57.1

Sales margin
$
389.3

 
$
236.5

 
$
152.8

Sales margin %
18.5
%
 
11.7
%
 
6.8
%
Revenues from Product Sales and Services
Revenues from product sales and services for the year ended December 31, 2016 increased $95.7 million, or 4.8%, from 2015, which primarily was driven by higher sales volume from our U.S. Iron Ore operations of 932 thousand long tons equating to an increase in revenue of $73.5 million and higher pricing from our Asia Pacific Iron Ore operations for an increase of $69.2 million. The increase in volume mainly was attributable to additional nominated tons from short-term contracts. Higher pricing and revenue rates were driven by an increase in the Platts 62% Price and a hedging impact in 2015 that was not repeated in 2016, for increased revenue of $32.7 million and $29.3 million, respectively. These positive movements were partially offset from lower pricing from our U.S. Iron Ore operations for a decrease of $62.0 million. Lower pricing primarily was driven by the negative inflation of certain price indices and the impact of net lower overall contracted pricing terms for two short-term customer contracts that were based on fixed negotiated rates compared to the prior year, which was based on a different method.
Refer to “Results of Operations – Segment Information” for additional information regarding the specific factors that impacted revenue during the period.
Cost of Goods Sold and Operating Expenses
Cost of goods sold and operating expenses for the years ended December 31, 2016 and 2015 were $1,719.7 million and $1,776.8 million, respectively, a decrease of $57.1 million, or 3.2%, year-over-year.
Cost of goods sold and operating expenses for the year ended December 31, 2016 decreased as a result of operational efficiencies and cost-cutting efforts across each of our business units, which reduced costs by $114.5 million. Additionally, lower idle costs and favorable foreign exchange rates decreased costs by $7.8 million and $5.5 million, respectively, compared to the year ended December 31, 2015. These decreases in cost were offset partially by higher iron ore sales volumes resulting in higher expense of $56.0 million compared to the year ended December 31, 2015.
Refer to “Results of Operations – Segment Information” for additional information regarding the specific factors that impacted our operating results during the period.
Other Operating Income (Expense)
The following is a summary of Other operating income (expense) for the years ended December 31, 2016 and 2015:
 
(In Millions)
 
2016
 
2015
 
Variance
Favorable/
(Unfavorable)
Selling, general and administrative expenses
$
(117.8
)
 
$
(110.0
)
 
$
(7.8
)
Miscellaneous - net
(30.7
)
 
24.8

 
(55.5
)
 
$
(148.5
)
 
$
(85.2
)
 
$
(63.3
)

52

Table of Contents

Selling, general and administrative expenses during the year ended December 31, 2016 increased $7.8 million over 2015. The increase for the year ended December 31, 2016 compared to the prior year was driven by an increase in employment costs of $8.1 million primarily due to incentive compensation and an increase in expenses of $2.1 million related to a lease abandonment of a corporate office space. These increases were partially offset by a $3.9 million decrease in IT service costs and legal fees.     
The following is a summary of Miscellaneous - net for the years ended December 31, 2016 and 2015:
 
(In Millions)
 
2016
 
2015
 
Variance
Favorable/
(Unfavorable)
Foreign exchange remeasurement
$
(16.8
)
 
$
16.3

 
$
(33.1
)
Michigan Electricity Matters accrual
(12.4
)
 

 
(12.4
)